• Title/Summary/Keyword: 사전타당성 평가

Search Result 112, Processing Time 0.025 seconds

A Study on Methodology to Assess IT Investment by ROI (IT ROI에 의한 투자 타당성 평가 방법론 연구)

  • Kim, Young-Woon;Chong, Ki-Won
    • The Journal of Society for e-Business Studies
    • /
    • v.11 no.1
    • /
    • pp.53-67
    • /
    • 2006
  • It is difficult to justify an IT investment unless the investment is expected to have a direct impact on a corporation's performance under rapidly changing business environment. It is important to demonstrate the benefit of the investment through a pre-investment assessment process to induce the executive's decision. This paper presents a methodology to assess the investment by analyzing cost and benefit of the investment. This methodology shows tangible cost as well as hidden cost by analyzing total cost of ownership. The methodology also produces ROI by performing cost benefit analysis including financial and non-financial factors. This paper suggests a systematic way to support If investment decision marking process by evaluating the investment objectively.

  • PDF

Analysing Decision Making Factors of IT Investment Projects (IT 프로젝트의 기본속성과 사전타당성 분석결과가 투자의사결정에 미치는 영향요인)

  • Koo, Bon-Jae;Lee, Kuk-Hie
    • Information Systems Review
    • /
    • v.9 no.1
    • /
    • pp.161-189
    • /
    • 2007
  • The purposes of this dissertation are to identify various factors affecting the outcomes of feasibility analysis and investment decision makings of new IT project plans and empirically analysis the relationships among them. 9 variables which have been drawn from prior studies and industry practices are the amount of the necessary resource such as development budget and time, the expect financial benefits, the degree of alignments between IT projects and the business strategy, the estimated risk, and the investment priority as the dependent variable. Data from 125 IT projects of K bank, the leading commercial bank in Korea, have been collected and Regression Analysis and ANOVA have been performed. As results, 5 out of 8 hypothesis have been accepted partially or totally.

The Analysis on Evaluation Model for Efficiency of GDOC (정부문서유통시스템의 효율성 측면에 대한 성과평가모델 분석)

  • 유은숙;도경화;정기원
    • Journal of the Korea Society of Computer and Information
    • /
    • v.9 no.1
    • /
    • pp.111-121
    • /
    • 2004
  • This paper presents the methods of evaluating validity and effectiveness of informatization budget investment for e-Government, through the preliminary evaluation. the progress evaluation and the Post evaluation of the investment, and a quantitative evaluation model which improves conformance of IT ROI (Return On Investment) using the evaluation results. the right evaluation targets of informatization investment for the development project to GDOC(Government electronic Document Distribution Center), and KPIs(Key Performance Indexes) which is enable to evaluate objectively effectiveness in the preliminary and the post evaluation phases are developed, and according to using the quantitative evaluation model . improved effectiveness evaluation results for each index in the point of view of usage and innovation are come out.

  • PDF

Study on Standard Framework for Analyzing Government R&D Program: the case of Preliminary Feasibility Study on R&D Program (국가연구개발사업의 사전 분석틀 표준화 연구: 연구개발 부문 예비타당성조사 표준지침을 중심으로)

  • Ahn, Sang-Jin;Kim, Hye-Won;Lee, Yoon Been
    • Journal of Korea Technology Innovation Society
    • /
    • v.16 no.1
    • /
    • pp.176-198
    • /
    • 2013
  • Preliminary feasibility study(PFS) was introduced in 1999 by financial authority to encourage a cautious approach to new large-scale public investment project. As it applied cost-benefit analysis as prime measure for decision-making, various issues have been arisen concerning feasibility analysis on R&D programs. This work is intended to suggest standard approaches to be established in PFS on R&D program as follows: 1. The issue questions can be induced in a standard way by 15 representative questions and their correlation with evaluation criteria. 2. The analyzing strategy can be standardized by establishing standards for classification of R&D effects and R&D logic analysis.

  • PDF

Social Impact Assessment on National Development Projects in Korea (대형 국책사업에 대한 사회영향평가)

  • Lee, Jong-Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.2
    • /
    • pp.197-204
    • /
    • 2010
  • 새만금사업, 신행정수도(행정중심복합도시, 세종시), 한반도 대운하사업(4대강 살리기사업) 등과 같은 대형국책사업은 대통령 선거공약으로 제시되었다. 그러한 대형국책사업이 국가의 이익을 위해 꼭 필요한 것으로 제시되었다 하더라도, 그 결과는 좋은 의도와는 다르게 나타날 수도 있다. 대통령 선거후 환경정책기본법과 환경영향평가법에 따라 대형국책사업에 대한 사전환경성검토(전략환경평가)와 환경영향평가가 이뤄졌지만, 예상하지 못했던 정치적, 사회경제적, 환경적 갈등이 발생하였다. 이러한 개발 및 환경 갈등의 원인은 여러 측면에서 찾을 수 있겠지만, 사회경제적 항목을 중심으로 하는 사회영향평가의 미흡을 그 원인으로 제시하는 연구가 많다. 대규모 국책사업을 둘러싼 개발 및 환경 갈등을 해소하기 위해, 우리나라와 외국의 사회영향평가의 현황과 연구 동향을 고찰하고, 국책사업의 주요 쟁점의 분석을 통하여 사회영향평가의 중요성과 필요성을 강조하였다. 그리고 사회영향평가의 도입, 강화, 지침 마련에 대해 다음과 같이 제안하였다. 첫째, 현재의 사전환경성검토(전략환경평가)시에 사회적 통합, 경제적 측면(B/C분석, 비용, 고용 등), 법제적 측면, 한반도 통일이나 국가균형발전 등과 같은 사회경제적 항목을 평가항목에 추가함으로써 사회영향평가를 도입하고; 둘째, 환경영향평가 시에 공공시설, 교육, 교통, 문화재, 경제적 타당성, 고용, 토지이용을 현재의 사회경제평가항목에 추가시켜 사회영향평가를 보다 강화시키고; 셋째, 한국의 환경적, 정치적, 경제적, 사회적, 문화적 상황을 반영하여(사회영향평가의 원리와 지침(가칭))을 마련하도록 한다.

Pre/Post-Environmental Impact Assessment Method Using Aerial Photos (항공사진을 이용한 사전과 사후의 환경영향평가 기법)

  • Kang, In Joon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.9 no.2
    • /
    • pp.99-105
    • /
    • 1989
  • This paper shows the possibility to have a accurate record and analysis of all data of pre/post-environmental impact assessment. For the experimental test, a surveying was carried with aerial photos by non-metric camera of remote controlled model airplene, aeial camera, LANDSAT data. The three approaches are briefly described. Finally, author suggest an environmental impact assessment method using aerial photogrammetric method. This will lead to more accurate and effective method in the environmental impact assessment.

  • PDF

An Establishment of Guideline and Evaluation Items for Before-and-After Study in Railroad Construction Projects (철도건설공사 사후평가 항목 및 지침 수립방안)

  • Kim, Yeon Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.2D
    • /
    • pp.315-322
    • /
    • 2011
  • The Korea government set a Act called as Before and After Study for a huge SOC projects in order to check their feasibility again at the time of design, construction and completion period. However, the evaluation items and analysis method are so vague that its effectiveness has been challenged. Especially railroad projects need to be evaluated differently by railroad construction types and rolling stocks. This paper suggests the evaluation items as a common items and exclusive items on the type of construction and rolling stocks. Also data collection in the standardized form and GIS techniques and are introduced to analyze evaluation items effectively.

Pre-evaluation Methodology for Decision Making of IT Outsourcing's Feasibility (IT아웃소싱의 타당성 결정을 위한 사전평가 방법론)

  • Hong, Hyun-Gi
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.8 no.4
    • /
    • pp.894-899
    • /
    • 2007
  • IT Outsourcing has been take place for ages and its range has expanded. The cases are also often take place more but there are a few criteria for making decision of IT outsourcing project. Companies tend to take IT outsourcing as a trend or to follow competitor's IT outsourcing project. This study suggests the criteria for IT outsourcing project before going into the project. The criteria ate to describe what function of the companies need to take outsourcing. Research model is driven by Statistics and AHP method. Also, variables are presented for clear making decision. This model allows the companies find proper IT outsourcing type and conveniences.

  • PDF

Development of an Object-Oriented Simulator for evaluating an object oriented CIM S/W (객체지향 제조관리 시스템 평가를 위한 객체지향 시뮬레이터 개발)

  • 오훈언
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1998.10a
    • /
    • pp.66-70
    • /
    • 1998
  • 제조환경 정보의 급속한 변화는 변화에 유연(flexible)하게 대처할 수 있는 제조관리 시스템 개발을 요구하게 되었으며 이를 위한 방법으로 객체지향 개발방법론을 이용한 제조관리 시스템이 구축되어 시스템 구성요소들의 재사용성, 확장성, 유연성을 높일 수 있게 되었다. 그러나 개발된 객체지향 제조관리 시스템은 과거 데이터와 불확실한 데이터를 바탕으로 개발된 시스템이므로 시스템의 타당성 및 효율성의 검증을 위한 방법으로 객체지향 시뮬레이터를 개발하였다. 객체지향 시뮬레이터는 개발된 제조관리 시스템이 현장에 구축되었을 때 발생될 수 있는 문제점을 사전에 검출할 수 있을 뿐만 아니라 시스템의 성능을 사전에 측정할 수 있어 제조관리 시스템의 개발비용을 단축할 수 있게 된다. 본 연구에서는 가상공장의 특성을 구현한 가상공장(virtual factory) 콤포넌트, 제조관리 시스템과의 인터페이스를 담당하는 커넥터(connector) 콤포넌트, 제조시스템의 구성환경을 모델링하는 컨피규레이션(configuration) 콤포넌트, 시뮬레이션의 시간전진을 담당하는 시계(clock) 콤포넌트 등으로 이루어진 객체지향 시뮬레이션의 프레임워크(framework)를 제시하고, 제조관리 시스템과 연계된 시뮬레이션을 통해 제조관리 시스템의 검증, 평가 방안으로 이용하였다.

  • PDF

Environment-Friendly Optimum Route Selecting With Geo-spatial Information Analysis (지형공간정보분석에 따른 환경친화적 최적 도로노선 선정)

  • Kim, Sang-Seok;Jang, Yong-Gu;Choi, Su-Geun;Kang, In-Joon
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.13 no.3 s.33
    • /
    • pp.69-77
    • /
    • 2005
  • Most of the evaluations of environmental effect of construction of road do not run parallel with the evaluation of the propriety of the business, but it just reviews how to reduce contamination before the beginning of the construction work. This reveals the limitation of the induction of environment friendly development from the fundamental. In this study, a function of GIS spatial analysis for 9 elements of pre-evaluation of environmental effect has been introduced, and a GIS decision making system for environmental effect of a road has been established for an integrated evaluation by using individual evaluation result. By using GIS decision making system for pre-evaluation of environmental effect that has been developed in this study and the GIS data that has been collected, it would be possible to decrease time and money for evaluation as well as fulfill the requirement of objectivity. Therefore, it would be possible to apply for pre-evaluation of environmental effect when deciding on the route of the road at the beginning stage of the construction work. Also, through the system developed in this study, the construction body could easily induce a mutual agreement with the residents by the visual evaluation material, which might result in an evaluation of environmental effect while decreasing time and money at the beginning stage of the construction.

  • PDF