• Title/Summary/Keyword: 사이클타임

Search Result 60, Processing Time 0.023 seconds

Estimation of Construction Equipment Production Rates based on Simulation;Cycle time of backhoe & loader (시뮬레이션에 의한 건설기계 시공능력 산정;굴삭기&로우더의 사이클타임)

  • Han, Ye-Ryeong;Park, Hee-Sung;Chang, Chul-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.105-111
    • /
    • 2009
  • Construction equipment is a very important factor for successful construction. Also, the cost for construction equipment is a major part of the cost of construction. Therefore, the estimation of the equipment cost is a critical task in construction planning. A formula for production rates shown in 'Standard Unit Labor' has been used to estimate construction equipment capability and cost. Although the performance of the equipment has improved over time, the variables in the formula have not been updated in a timely manner. Therefore, this paper has analyzed the preceding research, and performed several site visits to measure the cycle time of a backhoe and a loader. Construction equipment production rates were calculated with collected cycle times and variables given in 'Standard Unit Labor'. In addition,production rates were estimated considering the circumstances of various sites with the simulation program 'crystal ball.'

Understanding and Implementation Strategy of Tact Time, Pitch Time and Cycle Time (택트타임, 피치타임, 사이클타임의 이해와 적용방안)

  • Choe, Seong-Un
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2011.11a
    • /
    • pp.557-561
    • /
    • 2011
  • The study proposes three types of production lead time according to the production or demand pattern. First of all, it discusses the difference of three lead times. While pitch time and cycle time are used in push system with process stock and mass conveyor production, the tact time is used in pull system like as JIT based lean production system.

  • PDF

An analysis of excavation cycle time for Korean tunnels and the comparison with the Standard of Construction Estimate (국내터널 굴착 사이클타임에 대한 분석결과와 표준품셈과의 비교)

  • Kim, Yangkyun;Kim, Hyung-Mok;Lee, Sean S.
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.137-153
    • /
    • 2019
  • Estimating tunnel construction time and costs are the most fundamental part of a tunnel project planning, which has been generally assessed on a deterministic basis until now. In this paper, excavation cycle time was investigated for two road tunnels and one subway tunnel, and the results were compared with the Standard of Construction Estimate (SE), which is made for the estimation of construction time and cost in a design stage. The results show that the difference in cycle time between SE and actual cycle time is 50%, 7% and 31% respectively for the three tunnels, which means that SE does not reflect practical operation time. The major reasons of the difference are skilled level of tunneling workers, the change of operation sequences for more effective operations, much more complicated working atmosphere in a tunnel than the assumption of SE etc. Finally, even though the results can not be generalized since investigated tunnels are only 3, but it is thought that SE needs to be upgraded into the model able to consider quite common situations through additional tunnel investigation and studies in the future.

Construction Lean Process Development and Application for Field Productivity Improvement (건설 현장 생산성 향상을 위한 Lean 프로세스 개발과 적용에 대한 연구)

  • Kim, Yong-pyo;Jeong, Yong-ho;Lee, Min-jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.88-97
    • /
    • 2020
  • Practical and efficient application of lean construction, which has been proposed as an alternative to the limitations of traditional construction management methods, was developed to facilitate application on site and improve productivity through the fusion of traditional construction management methods. The concepts of Lean Time and Lean Cycle Time, which are the principles of lean construction, were introduced to eliminate waste and smooth flow production and pursuit of perfection, and the goal of establishing and improving the criteria for measurement and improvement was established and the information collection template was configured and applied to ensure reliability of measurement and analysis. Based on this, the project feasibility, reliability, and continuous improvement process were applied to the Field case to verify its effectiveness.

Estimation of Cycle Time for Construction Process of NATM Tunnel by using RFID Technology (RFID기술을 이용한 NATM터널 작업 프로세스의 사이클타임 산정방안 연구)

  • Park, NamJin;Kim, HyounSeung;Moon, HyounSeok;Kang, LeenSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.1D
    • /
    • pp.41-49
    • /
    • 2012
  • Radio Frequency Identification(RFID) technology, which replace BAR CODE technology that has been widely utilizing in the field of the manufacturing industry for a long time, has been proven in the whole industries including national defense, transportation, and construction as well as manufacturing industry. Recently, with this trend, researches for adapting the RFID technology have been attempting continually centering on the architectural project in the construction industry. However, those researches are mainly focusing on the experimental utilization such as simple activity and material management. To solve these issues, this study demonstrated methodologies for adapting the RFID technology by the construction steps aiming to analyze cycle time of five types of construction process to the NATM method of tunneling work. Besides, the application of RFID technology in civil engineering work was verified by demonstrating the suggested methodology to actual sites. Therefore, it is expected that the suggested methodology will be utilized for predicting the progress rate and establishing of follow-up work plans, and the site applicability of the RFID technology will be expanded to the civil engineering projects.

A Study on the Cycle Time Optimizing and the Delay Reducing for the MAC of NGA PON (NGA PON의 MAC을 위한 사이클 타임 최적화 및 지연감소에 관한 연구)

  • Chung, Hae;Kim, Jin-Hee;Kim, Geun-Young
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.34 no.9A
    • /
    • pp.685-696
    • /
    • 2009
  • The requirements of the NGA are to provide broader bandwidth, higher splitting ratio, and longer reach than those of the current FTTH. In the TDMA PON accounting for large percentage in the total FTTH, the increase in distance between the OLT and the ONU leads to the increase in propagation delay and in packet delay three times more than the propagation delay. It is because a packet arrived in the ONU is handled through bandwidth request, grant, and transmission. To reduce the increased packet delay, the OLT have to reduce the cycle time. However, it will cause increased overhead and reduced link efficiency. In this paper, we investigate several problems in TDMA PON when the subscriber access network extended to 60 or 100 Km reach as a NGA goal and provide a method that determines an optimal cycle time to satisfy QoS for delay sensitive traffics. In particular, we suggest a variable equalized round trip delay method and a variable cycle time method. It is shown that the former reduces the packet delay and the latter increase the link efficiency.

- A Study on Development of Process Modular System (PMS) for Production Innovation - (생산혁신을 위한 공정 모듈 시스템 개발에 관한 연구 - M사 반도체 고정을 중심으로)

  • 송관배;박재현;양광모;강경식
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2003.11a
    • /
    • pp.199-202
    • /
    • 2003
  • 반도체 제조 시스템에 대한 다양한 상황과 관련한 연구는 많지 않다 게다가, 모든 상황에 항상 적합한 생산시스템 전략은 없다. 반도체 제조공정 시스템에 대한 스케줄은 생산공정의 재진입, 공정의 높은 불확실성, 급속하게 변하는 제품과 기술과 같은 특성 때문에 반도체 제조공정시스템에 대한 스케줄은 복잡하고 어려운 작업이며, 사이클타임의 절감 및 단위시간당 생산량의 증대와 같은 시스템 목적을 달성하기 위하여, 반도체 제조 시스템에 대한 좋은 방법을 발견하기 위한 많은 연구가 있었다. 반도체 산업의 생산 흐름은 가장 독특한 특징을 가지고 있으며 생산계획과 반도체 제조의 스케줄링과 계획을 어렵게 하고 있다. 각각 다른 단계에 있는 자재는 같은 장비의 사용을 위해 경쟁을 하는데, 이로 인하여 작업시간 보다 단지 기다리는 시간에 상당한 시간을 할애하고 있다. 따라서 본 연구에서는 선행 연구를 바탕으로 반도체 공정에 모듈 생산방식을 접목시켜 공정의 사이클 타임을 줄이고, WIP를 최소화하여, 생산량을 최대화는 방안을 제시하고 공정 모듈 시스템 (Process Modular System)을 구축하고자 한다.

  • PDF

Bottleneck Scheduling for Cycletime Reduction in Semiconductor Fabrication Line (반도체 FAB공정의 사이클타임 단축을 위한 병목일정계획)

  • 이영훈;김태헌
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.298-301
    • /
    • 2001
  • In semiconductor manufacturing, wafer fabrication is the most complicated and important process, which is composed of several hundreds of process steps and several hundreds of machines involved. The productivity of the manufacturing mainly depends on how well they control balance of WIP flow to achieve maximal throughput under short manufacturing cycle time. In this paper mathematical formulation is suggested for the stepper scheduling, in which cycle time reduction and maximal production is achieved.

  • PDF