• Title/Summary/Keyword: 빌딩정보모델

Search Result 89, Processing Time 0.024 seconds

Building Sensor P2P Network Design using Embedded System (임베디드 시스템을 이용한 빌딩 센서 P2P 네트워크 설계)

  • 이정기;이준
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.8 no.6
    • /
    • pp.1086-1090
    • /
    • 2004
  • Architecture generation is the first step in the design of software systems. Most of the qualities that the final software system possesses are usually decided at the architecture development stage itself. Thus, if the final system should be usable, testable, secure, high performance, mobile and adaptable, then these qualities or non-functional requirements should be engineered into the architecture itself. In particular, adaptability is emerging as an important attribute required by almost all software systems. The machinery and tools in the remote site surveillance and connects intelligence information machinery and tools at Internet. We need the server which uses different embedded operating system to become private use. With the progress of information-oriented society, many device with advanced technologies invented by many companies. However, the current firmware technologies have many problems to meet such high level of new technologies. In this paper, we have successfully ported linux on an embedded system, which is based on intel Strong ARM SA-1110 processor, then written several network modules for internet-based network devices.

Schedule Optimization in Resource Leveling through Open BIM Based Computer Simulations

  • Kim, Hyun-Joo
    • Journal of KIBIM
    • /
    • v.9 no.2
    • /
    • pp.1-10
    • /
    • 2019
  • In this research, schedule optimization is defined as balancing the number of workers while keeping the demand and needs of the project resources, creating the perfect schedule for each activity. Therefore, when one optimizes a schedule, multiple potentials of schedule changes are assessed to get an instant view of changes that avoid any over and under staffing while maximizing productivity levels for the available labor cost. Optimizing the number of workers in the scheduling process is not a simple task since it usually involves many different factors to be considered such as the development of quantity take-offs, cost estimating, scheduling, direct/indirect costs, and borrowing costs in cash flow while each factor affecting the others simultaneously. That is why the optimization process usually requires complex computational simulations/modeling. This research attempts to find an optimal selection of daily maximum workers in a project while considering the impacts of other factors at the same time through OPEN BIM based multiple computer simulations in resource leveling. This paper integrates several different processes such as quantity take-offs, cost estimating, and scheduling processes through computer aided simulations and prediction in generating/comparing different outcomes of each process. To achieve interoperability among different simulation processes, this research utilized data exchanges supported by building SMART-IFC effort in automating the data extraction and retrieval. Numerous computer simulations were run, which included necessary aspects of construction scheduling, to produce sufficient alternatives for a given project.

Analysis of 3D Laser Scanner Input Performance in Structual Safety Diagnosis (구조안전진단에서의 3D 레이저 스캐너 투입 성과 분석)

  • Seong, Do-Yun;Baek, In-Soo;Kim, Jea-Jun;Ham, Nam-Hyuk
    • Journal of KIBIM
    • /
    • v.11 no.3
    • /
    • pp.34-44
    • /
    • 2021
  • This study quantitatively analyzes the work performance of the structural safety diagnosis team that diagnoses pipe racks. To this end, a method for evaluating the performance of the structural safety diagnosis team using the queuing model was proposed. For verification, the case of applying the existing method and the method of introducing a 3D laser scanner for one site was used. The period, number of people, and initial investment cost of each project were collected through interviews with case project experts. As a result of analyzing the performance of the structural safety diagnosis team using the queuing model, it was possible to confirm the probability of delay in the work of each project and the amount of delayed work. Through this, the cost (standby cost) when the project was delayed was analyzed. Finally, economic analysis was conducted in consideration of the waiting cost, labor cost, and initial investment cost. The results of this study can be used to decide whether to introduce 3D laser scanners.

A Case Study on the Benefits of Construction Project with BIM - Focusing on Domestic Project - (BIM을 이용한 건설프로젝트의 이점에 관한 사례 연구 - 국내 건축공사 사례를 중심으로 -)

  • Yun, Tae-Hwan;Han, Man-Chun;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.9 no.4
    • /
    • pp.10-20
    • /
    • 2019
  • As a result, the areas of knowledge that received the highest score in a positive impact were areas of risk management, while those that received the highest score in a negative impact were items of software management. In addition, each project was rated according to the score obtained. The distribution of grades by project was 71% for projects above middle grade and 29% for projects below middle grade. These results show that interest in BIM technology is increasing compared to the past, actual field application and research are actively being conducted, and that real construction sites also enjoy significant positive effects in terms of project management through BIM. In addition, the company is using BIM by applying advanced digital technologies such as AI technology, laser scanning technology and drone technology in line with the era of the fourth industrial revolution. Such a steady progress in future research on BIM technology development will reduce the number of low-grade projects and many middle-grade projects are expected to be upgraded to higher-level ones.

A Proposal Research of Assessment Standards for Ordering BIM-based Projects in Railway Infrastructure - Case Study on Application of Existing Projects - (철도인프라 BIM기반 공사 발주를 위한 평가기준 제안 연구 - 기존 발주사업 적용 사례를 통해 -)

  • Son, Seo-Yeon;Lee, Geun-Il;Jung, Ji-Hyun;Moon, Woo-Hyoung
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.10-19
    • /
    • 2021
  • In the evaluation for ordering BIM-based projects (Design Build) of Korean National Railway, criteria of BIM-based smart construction technology are assessed. Unlike the existing assessment criteria, performance resources and detailed assessment guidelines have been added by this research. The purpose of this study is to propose qualification assessment standards according to specific guidelines when evaluating on the phase of bidding for BIM-based projects. In the study, an improved evaluation standard (draft) was arranged based on two consultation meetings and surveys of related companies, applied to existing projects with the companies that won the bid, and validated. As more specific and added criteria compared to the existing standards, it could reduce the difficulty of evaluation for BIM capability and lay the foundation for railway BIM-based project management.

Development of Extended IFC Schema for BIM-based Korean Construction Standards Review (BIM 기반 국가건설기준 검토 수행을 위한 확장형 IFC 구조 개발)

  • Suk, Chae-Hyun;Jeong, Yu-Jeong;Yu, Young-Su;Koo, Bon-Sang;Ryu, Sang-Hun
    • Journal of KIBIM
    • /
    • v.14 no.2
    • /
    • pp.35-49
    • /
    • 2024
  • IFC, a neutral standard data model for BIM, ensures data interoperability across BIM applications but struggles with adapting to diverse construction standards across countries and regions. In practice, the standard IFC schema does not include the entity and attribute information necessary for reviewing Korean Construction Standards. To overcome this, this study developed an extended IFC schema that incorporates design and construction standards data specifically for bridge. The extended IFC schema defines entities for representing types of bridges, structures, and elements, and Psets for containing relevant standards information. This schema is customized to be compatible with both Korean Design Standards (KDS) and Korean Construction Specifications (KCS). Additionally, based on the extended IFC schema, a specialized extension module was developed, capable of embedding design and construction standards data by element within IFC Physical File. Through this module, the necessary design and construction standards were inserted into specific elements.

The Elevator Control System Integrated Wire and Wireless based on Information Technology (IT기반 유무선 통합 승강기 제어 시스템)

  • Kim, Woon-Yong
    • Journal of the Korea Society of Computer and Information
    • /
    • v.16 no.2
    • /
    • pp.113-120
    • /
    • 2011
  • The information of the IT convergence has extended through the whole business ares with supplying intelligence terminal such as smart phone and the technology of sensors and wireless networks. And also, the existed industry became to high technology and extended various parts. The industry of the elevator became the center of the life offering the diversification of the user environment access and high building control. In this paper, we suggest the elevator control system integrated wire and wireless based on Information technology. We suggest the service model of user friendly connected by internet. For this, we make the relation model of the elevator system and IT environments and then design the service model for wire service and wireless service using smart phone. It can make to supply efficient information with wire and wireless environments and also make improvement in accessability for the disabled peoples.

A basic study 3D model advancement method for nuclear power plant (원자력 발전설비의 3D 모델 상세화 방안에 대한 기초 연구)

  • Lim, Byung-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.37-38
    • /
    • 2018
  • BIM(Building Information Modeling) in the architecture, VDC(Virtual Design and Construction) defined CIFE(Center for Integrated Facility Engineering) of Stanford university in USA, and Data-driven design definition issued by TECDOC-1284 of IAEA are doing data-level design generated by 3D CAD technology, integrating and managing related information based on the 3D model, and Using 3D models effectively during nuclear power plant life cycle. 3D model of domestic nuclear power industry is using interference review between design fields, 4D system linked 3D construction model and schedule activity, but the 3D model generated in the design phase is effectively not utilized during the construction, operation, decommissioning. therefore, This study is aimed to suggest 3D model LOD(Level of Detail) advancement method through the analysis of existing literature, 2D drawings, and 3D models throughout nuclear power plant lifecycle.

  • PDF

기압고도계를 이용한 GPS 수직 위치정보 정확도 향상

  • Kim, Ra-U;Choe, Gwang-Ho;Im, Jun-Hu;Yu, Won-Jae;Lee, Hyeong-Geun
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2015.10a
    • /
    • pp.273-275
    • /
    • 2015
  • GPS(Global Positioning System; 위성항법시스템)는 수평오차 10m 내외의 정확도로 내비게이션 유닛과 스마트폰 등 다양한 이동기기에 널리 활용되고 있다. 그러나 널리 알려진 바와 같이 GPS는 교량, 빌딩, 그리고 대형 구조물 등 주변 환경에 의하여 위성의 가시성이 영향을 받으며 이로 인하여 위치 정보의 가용성과 정확도가 크게 저하되는 단점이 있다. 본 논문에서는 GPS 수직오차를 개선하기 위한 방안으로 저가형 기압고도계를 보조센서로 활용하여 수직 위치정보 정확도를 향상시키는 방법을 제안하였다. 제안된 방법은 융합 모델에 의한 칼만필터를 활용하여 GPS와 기압고도계를 융합하는 특성을 가진다. 마지막으로 정적 실험과 동적 실험을 통하여 기압고도계의 특성을 분석하고 제안된 융합 필터의 성능을 분석하였다.

  • PDF

Analysis of the Relationship Between Project Goal and Model Use Through BIM RFI Analysis at the Construction Site (시공 현장의 BIM 정보 요청 사항을 통해 분석한 프로젝트 목표와 BIM 활용 간의 관계)

  • Lee, Seung-Won;Eum, Ik-Chul;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.14 no.1
    • /
    • pp.22-29
    • /
    • 2024
  • BIM is a practical and economical technology used in the construction process. Despite the fact that BIM is widely used in the design and another stage before construction, it is not largely applied during the construction stage itself. However, it is important to opt for BIM during construction stage because there may occur a number of risks such as construction delay and increased construction costs. Therefore, the present paper contains the analysis of the model use, which is mainly applied to respond to the BMI RFI that represents an information requirement of construction site workers, by analysing the BMI RFI application at the construction site. In addition, there is an analysis of the way the derived model use affects the project goal aimed at the project success.