Browse > Article
http://dx.doi.org/10.13161/kibim.2019.9.4.010

A Case Study on the Benefits of Construction Project with BIM - Focusing on Domestic Project -  

Yun, Tae-Hwan (한양대학교 건축공학과)
Han, Man-Chun (한양대학교 건축공학과)
Ham, Nam-Hyuk (한양사이버대학교 건축도시건설공학부 디지털건축도시공학과)
Kim, Jae-Jun (한양대학교 건축공학과)
Publication Information
Journal of KIBIM / v.9, no.4, 2019 , pp. 10-20 More about this Journal
Abstract
As a result, the areas of knowledge that received the highest score in a positive impact were areas of risk management, while those that received the highest score in a negative impact were items of software management. In addition, each project was rated according to the score obtained. The distribution of grades by project was 71% for projects above middle grade and 29% for projects below middle grade. These results show that interest in BIM technology is increasing compared to the past, actual field application and research are actively being conducted, and that real construction sites also enjoy significant positive effects in terms of project management through BIM. In addition, the company is using BIM by applying advanced digital technologies such as AI technology, laser scanning technology and drone technology in line with the era of the fourth industrial revolution. Such a steady progress in future research on BIM technology development will reduce the number of low-grade projects and many middle-grade projects are expected to be upgraded to higher-level ones.
Keywords
BIM; PMBOK; Case Study;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 AIA, AIA TAP BIM AWARDS, 2005-2016, http://www.aia.org/aia-architects (Dec. 24. 2018).
2 Bae, K. J., Jun, H. J. (2010). A Study on Barriers to the Adoption of BIM and Change in Mind, Journal of Architectural Institude of Korea, 5(2), pp. 1-11.
3 Barlish, K., Sullivan, K., (2012). How to Measure the Benefits of BIM-A Case Study Approach, Journal of Automation in Construction, 24, pp. 149-159.   DOI
4 Bryde, D., Broquetas, M., Volm, J. M. (2013). The project benefits of building info rmation modelling (BIM). International journal of project management, 31(7), pp. 971-980.   DOI
5 Choi, J. H., Ryu, H. G. (2015). Application and Effects Analysis of BIM(Building Information Modeling) for Construction Management of a Construction Field, Journal of the Korea Institute of Building Construction, 15(1), pp. 115-121.   DOI
6 Gugto Ilbo, 2016, BIM, cost reduction, air shortening effect 'excellent', http://www.ikld.kr (Feb, 22, 2019).
7 Kim, H. J. (2017). A Correlation Analysis of Construction Elements through Case Analysis of Domestic and Foreign BIM Projects, Journal of KIBIM, pp. 2-12.
8 Kim, J. H., Shin, M. H., Kim, C. H., Choi, Y. W., Han, S. C., Kim, H. Y. (2016). An Effectiveness Analysis of Building Information System (BIM) for Risk Management, Crisisonomy, 12(12), pp. 13-21.
9 Kim, K. J. (2001). CM/PMBOK, Journal of Construction engineering and management, 2(3), pp. 109-113.
10 Kim, Y. H., Jo, B. N., Kim, H. S., Kang, L. S. (2016). Development of Function Classification System for BIM Application by Construction Project Phases, Crisisonomy, pp. 400-401.
11 Ham, N. H., Kim, J. J. (2015). A Case Study on BIM Operating and Performance Measurement in Construction Phase, Journal of KIBIM, 5(2), pp. 1-11.   DOI
12 Jung, E. S., Kim, S. J., Ham, N. H., Moon, S. K., Kim, J. J., (2018). A Case Study on the Project Benefit of Digital Fabrication in Construction Projects, Journal of KIBIM, 8(2), pp. 29-40.   DOI
13 Kim, H. J. (2010). The Study on the BIM Application Effect for Defect Prevention of Apartment Housing, Journal of Architectural Institude of Korea, 38(1), pp. 726-729.
14 Kim, H. J. (2011). The Study on the BIM Application Effect for Defect Prevention of Apartment Housing, Masters Thesis, Dongeui University, pp. 1-74.
15 Koh, S. H., Ham, N. H., Lee, J. S., Yoon, S. W., Kim, J. J. (2017). Comparison Analysis of BIM Level in the Domestic and Overseas BIM Projects - Focused on BIM Jornal and Award Winning Projects, Journal of KIBIM, 7, pp. 25-35.   DOI
16 Lee, J. S. (2011). A Study on the Application of BIM to Architectural Field, Ssangyong Engineering, 60, pp. 30-38.
17 Lee, J. Y. (2010). Korea Power Exchange (KPX) Project Case, The Bim, 4, pp. 27-29.
18 Public Procurement Service, 2016, Expanding the application of custom service BIM, https://www.pps.go.kr (Feb. 20. 2019).
19 Ryu, J. W. (2012). Digital Technologies for Freeform Building in Korea, Journal of the korea Academia Industrial cooperation Society, 13(9), pp. 4259-4265.   DOI
20 Seo, H. C. (2018). Minimizing Risk in Early Stage of Construction using BIM, Journal of Architectural Institude of Korea, 38(1), pp. 726-729.