• Title/Summary/Keyword: 붕괴사고 사례

Search Result 44, Processing Time 0.043 seconds

Proposal of Construction System to prevent Dongbari Collapse by applying IT Convergence Technology (IT 융합기술을 적용한 동바리 붕괴사고 방지를 위한 건설공사 시스템 제안)

  • Jeon, Kyong-Deck;Shin, Seung-Jung
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.20 no.5
    • /
    • pp.113-120
    • /
    • 2020
  • Safety accidents, called industrial accidents in construction work, are causing a lot of casualties, property damage and social controversy in the event of an accident, causing the construction to lose public confidence. The risk of safety accidents at construction sites may continue to increase as the construction of high-rise, large-scale, and multi-purpose complex buildings has increased in recent years. In particular, the most frequently constructed apartment construction among reinforced concrete buildings is designed and constructed with a wall-like structure with no beams for each floor, while the lower floors are made of lamen with columns and beams. As a result, the transfer beam or transfer slab to withstand the upper load is installed on the upper part of the Ramen structure, so the system Dongbari, which is installed as a temporary material during concrete laying construction, may collapse at any time during plowing and curing. The purpose of this study is to apply IT convergence technology to prevent the collapse of the system Dongbari during concrete installation, and to apply many of the variables that may occur during construction on a case-by-case basis to check the stability of the system Dongbari and to propose a model of the anti-conducting prediction system.

월성원자력발전소 비상노심냉각계통의 수격현상 해석

  • 이중섭;오광석;김선철;오종필;김도현
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.05b
    • /
    • pp.67-72
    • /
    • 1996
  • 수격현상(Waterhammer)으로 인한 과도압력하중은 월성원자력발전소 비상노심냉각계통 (Emergency Core Cooling System : ECCS) 설계의 주요 고려사항이다. 비상노심냉각계통은 특수안전계통으로서 냉각재상실사고(Loss of Coolant Accident : LOCA)후 일차열수송계통을 다시 채워주고 핵연료 손상을 막기위해 노심으로부터 잔열 및 붕괴열을 제거한다. 일차열수송계통으로의 비상냉각수 주입은 고압주입, 중압주입, 저압주입 3 단계로 주입된다. 과도압력이 발생될 것으로 예상되는 고압주입과 중압주입에 대한 6가지 사례들이 ECCS의 배관과 지지대 설계를 위해 고려되었다. 모든 사례에 대한 비상노심냉각계통의 과도압력 현상은 PTRAN 코드에 의해 해석 되었고 해석된 최고과도압력은 설계압력보다 작음을 알게 되었다. 모든 사례의 최고압력과 최고차압은 비상노심냉각계통 배관 및 지지대 설계를 위한 응력해석 자료로서 사용될 것이다.

  • PDF

Leadership for the Global Process Safety in Chemical Process Industries: Challenges of chemical process industries in Asia (화학공정산업의 글로벌 공정 안전 리더십: 아시아 화학공정산업의 과제)

  • Yoon, En Sup;Shin, Dongil
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2017.11a
    • /
    • pp.337-338
    • /
    • 2017
  • 지난 60년간 일본, 한국, 중국은 물론이고 아시아에서의 공정 산업은 크게 성장했다. 그 발전과정에서 다양한 사고들을 겪고 극복해내는 과정이 있었으며, 최근 한국의 화학물질관리법을 포함하여 안전 기술 및 안전 관리에 많은 진전 또한 있었다. 이 발표의 서두에서는 한국의 공정산업의 역사적 발전에 대해 뒤돌아보며 당면 과제들에 대한 논의를 전개하고자 한다. 장기적인 경제발전의 일환으로 중화학공업 육성을 표방하며, 초기 단계에 정부주도의 적극적인 산업 발전 계획을 수립해 산업의 성장을 주도하였으며, 1990년대에는 어려움을 극복하기 위해 시장 중심의 구조 조정이 도입되었다. 지난 30년 동안 한국사회에서는 가스 폭발, 건물 붕괴, 화물 및 여객선의 사고를 비롯한 치명적인 사고들이 있었다. 이러한 사고 후에는 필연적으로 안전 정책 및 법률에 중요한 발전이 있었는데, 가장 최근의 것은 2012년 유독 가스 배출 사고 이후 화학물질관리법(Chemical Control Act)을 시행한 것이다. 또한 앞으로 20년간 (2036 년까지) 다양한 구성요소의 수준을 정량화할 수 있는 지속 가능성 개념에 대한 강한 요구가 있음은 주지의 사실이다. 지속 가능성의 새로운 패러다임은 에너지, 경제 및 환경의 전통적인 구성 요소로 구성된다. 더불어 지속 가능성은 안전, 보안 및 세계화(globalization)를 다루어야 한다. 미래의 지속 가능성 개념은 이러한 6가지 구성 요소 모두를 하나의 기능으로 정량적으로 통합할 것이다. 특히 이 작업에 대한 강력한 리더십은 화학 공정 산업에서 절대적으로 부족한 현실이기에, 이러한 기능의 통합과 특화된 교육 및 훈련에 대해 한국의 사례와 해외에서의 글로벌 응용 프로그램에 대란 논의를 통해 본 발표는 향후의 발전방향과 비전에 대해 논의하고자 한다.

  • PDF

Special Theme_재난통신 및 방송 - IT Expert Interview 김응배 TTA 재난통신 PG 의장

  • 한국정보통신기술협회
    • TTA Journal
    • /
    • s.131
    • /
    • pp.30-39
    • /
    • 2010
  • 급격한 기후변화에 의한 집중호우 및 소리 없이 쌓이는 폭설과 잦은 매머드급 태풍 그리고 지진과 해일, 화산활동 등의 자연재해가 언제 어떻게 일어날지 모르는 상황에서 국가는 국민의 생명과 재산을 보호해야 할 막중한 과제를 안고 있습니다. 또한 자연재해뿐 아니라 공공기관에 대한 테러와 자원쟁탈을 위한 국지적인 전쟁과 같은 참사가 지구상에서 수시로 발생하고 있으며, 원자로의 방사능 누출과 지하철이나 철도의 충돌사고 및 가스폭발사고와 초고층 대형 빌딩이나 지하터널, 해저터널 같은 대형구조물의 붕괴 등 인공재난이 수시로 발생하고 있습니다. 이와 같이 재난발생은 대형화 및 다양화되고 있으며, 복합화된 형태로 발생하여 단일 기관으로는 대응하는 데 어려움이 있어서 범 국가적인 통합지휘체계에 의한 재난 관리 및 재난 대응이 필요합니다. 이러한 대형 참사를 사전에 예방하고, 재난 발생시 신속히 대응하여 인명과 재산피해를 최소화하는 방안으로 어떠한 재난 통신 방안이 있으며, 관련 기술 표준과 선진국 등의 구축사례를 통하여 우리나라는 제대로 재난 통신 및 방송이 구축되어 있는 지 살펴보고 이를 통하여 유비무환(有備無患) 및 거안사위(居安思危)의 정신으로 언제 닥칠지 모르는 국가재난에 미리미리 대비하는 계기가 되었으면 합니다.

  • PDF

Technology Trends in Satellite Communication for Disaster (위성 재난통신 기술동향)

  • Park, M.K.;Ryu, J.K.;Shin, M.S.;Oh, D.G.;Lee, H.D.;Ju, N.D.
    • Electronics and Telecommunications Trends
    • /
    • v.27 no.6
    • /
    • pp.83-93
    • /
    • 2012
  • 홍수, 쓰나미와 같은 자연재해를 비롯하여 9.11 테러, 최근의 불산가스 유출 등과 같은 대규모 사고는 순식간에 해당 지역의 지상 통신 시스템을 마비시키곤 한다. 하지만 이런 긴급한 상황일 때 오히려 통신망은 지휘통제, 구조 요청 및 재난 복구 등을 위해 더욱 신속하고 끊김 없는 데이터 전달이 이뤄져야만 하며 이는 발생된 재난으로부터 피해를 최소화할 수 있는 근본 수단이 된다. 그러므로 지상 통신망이 붕괴되는 긴급 상황을 대비해서 위성을 이용한 재난통신 시스템은 없어서는 안 되는 국가의 가장 기본적인 통신 인프라인 것이다. 본고에서는 일본, 중국 그리고 유럽 등의 해외 여러 나라에서 위성을 재난 상황 발생 시 긴급 통신으로 사용한 사례, 국내의 위성 재난통신망 활용 사례를 살펴보고 더불어 ITU(International Telecommunication Union), MESA(Mobility for Emergency & Safety Applications), APT(Asia-Pacific Telecommunity)와 같은 국제 표준 단체에서 수행 중인 위성 재난통신망 표준화 동향을 살펴보고자 한다.

  • PDF

A Preliminary Study on Mobile Medical Unit for Emergency Medical System (응급 의료체계용 이동 의료단위에 대한 기초연구)

  • Yang, Minkyu;Lee, Young;Suh, Sangwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.57-64
    • /
    • 2017
  • Recently, the disaster situation has been diversified and compounded worldwide as well as in Korea. And the damage scale of each disasters have increased, and following economic loss is also increasing immensely. In Korea, especially the out break frequency of large-scale disasters has increased. Disasters caused by earthquakes are also very likely to occur. When a major accident such as Mauna resort collapse accident, Ferry sewol sinking accident occurred, systematic emergency medical care at the site at the time of disaster occurred in order to operate an emergency medical facility corresponding to the site, which is not systematic. The need for this service is urgent. If highly reliable emergency medical system function at appropriate times in the disaster site, secondary damage can be reduced and the whole situation would be back to normal shortly. Therefore, it is necessary to provide an emergency medical system capable of quickly and safely responding to disaster sites in relation to various damage scale. For the purpose, thorough analysis on mobile medical units of inside and outside the country was accomplished. As a result, Mobile Medical Unit of outside the country are trailer type, tent type, container type etc. At home, these types have been studied and will be proposed early next year as a temporary solution. Here we introduce suitable types for our country.

A Review on the Improvement of the Meaning and Composition Requirements of Interference with Fire Protection Activities - Focusing on Interference with 119 EMS Activities - (소방활동방해죄의 의미와 구성요건 개선에 관한 검토 -119구급활동 방해를 중심으로-)

  • Young Pyo Hong
    • The Korean Society of Law and Medicine
    • /
    • v.24 no.3
    • /
    • pp.105-124
    • /
    • 2023
  • Modern society is facing an unstable environment due to unexpected accidents and hazardous situations. For example, incidents such as the collapse of the Bundang Bridge and the crushing accident in Itaewon could serve as examples. In addition to these, critical emergencies like sudden cardiac arrests and strokes frequently occur, requiring swift actions and smooth transfers to specialized medical institutions for effective responses. In response to these risks, the country has been establishing various systems to protect the lives and safety of its citizens. Among these, the 119 First Aid Activities plays a crucial role within the emergency medical system. Its goal is to promptly respond to critical emergency situations involving severe trauma patients or patients with serious illnesses, minimizing damage and safeguarding lives by swiftly transferring them to emergency medical institutions for specialized treatment. The core activity related to this is emergency rescue operations. In particular, the 119 First Aid system serves as a crucial institution responsible for the hospital transportation of emergency patients. However, rescue personnel still encounter cases of interference with their activities during their duties. Despite efforts from the police, these interference cases persist, and they share similarities with the crime of obstructing official duties. Interference with emergency activities exhibits a comparable nature to instances such as physical assaults and equipment damage against emergency medical practitioners working within the emergency medical system. Therefore, a comprehensive understanding and improvement efforts regarding the issues of interference that arise during the process of emergency medical activities, including the 119 First Aid system, are necessary. The solution to these problems is to establish and improve the conditions for obstruction of first aid activities, focusing on the "Framework Act on Firefighting" and the "Act on 119 Rescue and Emergency."

A Study for Safety Management on the Basis of Lateral Displacement Rates of Anchored In-situ Walls by Collapse Case Histories (붕괴 사례를 통한 앵커지지 가설흙막이벽체의 수평변위속도에 의한 안전관리 연구)

  • Chung, Dae-Seouk;Lee, Yong-Beom
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.3
    • /
    • pp.367-378
    • /
    • 2018
  • Purpose: The objective of this study is to present a reasonable safety management of the anchored in-situ wall systems constructed in the ground conditions consisting of multi-layered soils underlain by bedrocks in the urban area of Korea. Method: Field measurements collected from collapse case histories with deep excavations were analyzed for the safety management of the wall systems supported by the earth anchors in terms of lateral displacement rates. Results: The average maximum lateral displacement rate in a collapsed zone of the in-situ wall significantly increased upon the completion of the excavation. Particularly, the collapse of the in-situ wall system due to the sliding occurring along the discontinuities of the rock produced a considerably large lateral displacement rate over a relatively short period. Conclusion: For predicting and preventing the collapse of the wall system during or after the excavation work, the utilization of the safety management criteria of the in-situ wall system by the lateral displacement rate was found to be much more reasonable in judging the safety of earthworks than the application of the quantitative management criteria which have been commonly used in the excavation sites.

A Case Study on the Slope Collapse and Reinforcement Method of the Phyllite Slope (천매암 지역에서의 비탈면 붕괴 원인규명 및 보강대책 사례연구)

  • Cho, Younghun;Lim, Daesung;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.8
    • /
    • pp.83-93
    • /
    • 2010
  • The purpose of this study is to present emergency rehabilitation, cause and the countermeasure of reinforcement about reinforced retaining wall and the slope collapse of the phyllite ground. The study area is broken easily because this area has rock mass discontinuity such as stratification, foliation, joint and fold. And this area consists of the ground where it happens easily to the failure of structure like reinforced retaining wall because of the phyllite ground sensitive to weathering. Counterweight fill in front of reinforced retaining wall was performed as emergency rehabilitation about displacement of reinforced retaining wall and the failure at the rear of slope on phyllite ground. After that, additional displacement didn't occur. Boring and geophysical exploration were launched to present emergency rehabilitation and develop the long-term method of reinforcement. This could grasp anticipated range of the failure section and identify internal and external factors of the cause of the slope collapse. Several methods of reinforcement were suggested by conducting the numerical analysis. When conducting design and construction of major structures at the ground which has complex discontinuities, the precise site investigation should be conducted. During construction, immediate action for over-displacement should be taken by performing the periodic measurement.

Decision Support Model for Selection Water Resources Facility Improvement Projects (수리시설개보수사업 선정을 위한 의사결정지원모델)

  • Nam, Song Hyun;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.4
    • /
    • pp.449-459
    • /
    • 2021
  • More than 80 % of agricultural reservoirs are old facilities over 50 years old, and safety and function declines occur. As a result, safety accidents such as the collapse of the reservoir have occurred. Precise safety diagnosis is conducted in advance to prevent accidents such as reservoir collapse, and Water resources facility improvement project are implemented based on priority. However, the priority of the business is selected based on the subjective judgment of the facility manager. In this study, we set 80 hypotheses based on the results of precision safety diagnosis and decision-making examples of existing Water resources facility improvement project and selected 45 variables using correlation analysis and significance test. Using logistic regression analysis, the final 21 variables were selected and a decision support model was presented, and the classification accuracy of the model was 86.8 %. In this research, the part that presented the quantitative index for decision support when selecting the Water resources facility improvement project has important significance.