• Title/Summary/Keyword: 불확도 해석

Search Result 29, Processing Time 0.026 seconds

Robust Aeroelastic Analysis considering a Structural Uncertainty (구조 불확도를 고려한 강건 공탄성 해석)

  • Bae, Jae-Sung;Hwang, Jai-Hyuk;Ko, Seung-Hee;Byun, Kwan-Hwa
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.43 no.9
    • /
    • pp.781-786
    • /
    • 2015
  • An aeroelastic stability can be degraded due to an aeroelastic modeling error and a structural uncertainty. Therefore it is necessary to predict the aeroelastic stability boundary considering an aeroelastic modeling error and a structural uncertainty. Robust aeroelastic analysis was proposed to predict the aeroelastic stability boundary considering these error and uncertainty. In the present study, the robust aeroelastic modeling and analysis were performed by using the ${\mu}$ analysis technique and the aeroelastic model of the control fin with modal approach and MSA. The computer program for the robust aeroelastic analysis was developed and verified by comparing its results with those of conventional aeroelastic analysis methods.

Uncertainty Analysis for Subsonic Wind Tunnel Testing (아음속풍동 시험에서의 불확도 해석)

  • Kwon, Ki-Jung;Sung, Bong-Zoo
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.30 no.4
    • /
    • pp.123-130
    • /
    • 2002
  • Aerodynamic results for an airplane model produced in a subsonic wind tunnel testing inadvertently include errors which are added during model preparation, data acquisition, manipulation, and/or describing the results. Predicting or analyzing uncertainty for the final results is necessary for trusting them and for applying them to real airplane. This paper describes the analytic and systematic method for calculating and describing the uncertainties of aerodynamic coefficients.

Uncertainty Assessment of Stationary ADCP Discharge Measurement using Standardized GUM Framework (GUM 표준안을 이용한 고정 측정 방식 ADCP의 유량 측정 불확도 평가)

  • Kim, Dongsu;Kim, Jongmin;Kim, Seojun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.102-102
    • /
    • 2016
  • 일반적으로 수자원분야에서 사용되는 기초 자료 중 하나인 유량측정 성과는 설계홍수량 산정, 지점의 수위-유량 관계곡선식 산정 등 유역의 이 치수를 위한 설계나 장 단기 계획을 수립하기 위한 기초자료로서 사용되어지고 있으며, 2차원 및 3차원 수치해석을 위한 입력 자료로 사용되고 있다. 유량측정의 성과는 이렇듯 다양한 방면으로 활용되어지고 있는 반면 현재 국내에서는 측정의 성과에 대한 신뢰성을 나타낼 수 있는 지표가 제시되고 있지 않은 상황이다. ISO(International Organization for Standardization) 및 BIPM, IFCC 등 6개 기구는 공동으로 측정 불확도 산정 지침서(GUM, Guide to the expression of Uncertainty in Measurement, 1993)을 제시하였고, 최근 WMO에서는 GUM 표준안을 하천 유량 측정 불확도 산정방법으로 공인하고 있다(JCGM 100, 2008). 이에 따라 본 연구에서는 최근 유량 측정에 활발하게 사용되고 있는 ADCP의 유량 측정 성과에 대한 불확도를 GUM 표준안 기반으로 평가하고자 한다. ADCP의 측정 방법은 고정측정 방식이고, 유속-면적법으로 계산된 유량에 대한 측정 불확도를 평가하였다. 실험은 실규모에서 유량을 제어할 수 있는 건설기술연구원 하천실험센터에서 수행되었고, 사용된 유속 측정 장비는 SonTek사의 micro-ADV와 ADCP M9을 사용하였으며, ADV로 측정된 결과를 참값으로 가정한 후 실험 및 분석을 수행하였다. GUM 표준안 기반의 불확도 평가를 위해 사용된 관계식 및 불확도 요인들은 선행 연구들을 기반으로 하되, 본 실험을 통해 분석된 수치로 변경하여 최종적인 ADCP 유량 산정 불확도를 평가하였다. 본 연구에서는 고정측정 방식 ADCP의 유량 측정 결과를 GUM 표준안에 적용하여 불확도를 평가하였으며, 추가적인 연구를 진행하여 일반적으로 사용하고 있는 이동측정 방식 ADCP의 유량 측정 결과에 대한 불확도를 평가할 수 있을 것으로 기대되며, 이러한 결과는 설계 홍수량 산정이나 수위-유량 관계 곡선식 산정 등 다양한 분야에 적용할 수 있을 것으로 사료된다.

  • PDF

Comparison of Geometrical Factors of Dielectric Resonators Prepared for the Surface Resistance of Superconductor Films: Field Analysis vs. Computer Simulation (초전도체 박막의 표면저항 측정용 유전체 공진기에 대한 Geometrical factor의 비교 : 전자기장 해석 대 시뮬레이션)

  • Yang, Woo-Il;Jung, Ho-Sang;Kim, Myung-Su;Cho, Man-Soon;Choo, Kee-Nam;Lee, Sang-Young
    • Progress in Superconductivity
    • /
    • v.13 no.2
    • /
    • pp.97-104
    • /
    • 2011
  • In the dielectric resonator method, which has been widely used for measuring the microwave surface resistance of superconductors, accuracies in the geometrical factors (G-factors) affect the uncertainty in the measured surface resistance. We compare the G-factors of short-ended sapphire resonator as obtained by using field analysis with those by using computer simulations: The former is obtained by using the analytic expressions for the electric and the magnetic field components inside the resonator, and the latter by using computer software. The G-factors as obtained by using the latter appear to be closer to those obtained by using the former as the resonator space is divided into larger number of sub-space, i.e., a tighter mesh, with a difference of ~8 % observed for a mesh of 14400 sub-spaces reduced to ~2 % for 114996 sub-spaces. Variations in the relative uncertainty in the surface resistance of typical $YBa_2Cu_3O_{7-\delta}$ superconductor films with those in the G-factors are studied, which provides an upper limit of the relative uncertainty in the G-factors required for realizing the target uncertainty in the surface resistance. These results could be useful in estimating the optimum number of meshes for obtaining the G-factors through computer simulations.

Uncertainty Analysis of the Calculated Radioactivity in Liquid Effluent Released as Batch Mode from a Nuclear Power Plant (발전용원자로에서 뱃치방식으로 배출되는 액체상 방사성물질의 방사능 평가결과에 대한 불확도 해석)

  • 정재학;박원재
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2003.11a
    • /
    • pp.562-571
    • /
    • 2003
  • A series of factors such as sampling, pretreatment measurement, volume estimation which induces uncertainty of the calculated radioactivity in liquid effluent released from a nuclear power plant were analyzed. It is innately impossible to estimate exact error of the calculated radioactivity, since most of the input parameters are determined by a single measurement and true value of the released radioactivity cannot be known. In this paper, a systematic model to calculate uncertainty of the released liquid radioactivity was developed based upon the guidance report published by the ISO in 1993, and the model was applied to a set of hypothetical batch release conditions. As a result, the Priority of each input parameter was turned out to be (1) wastewater volume, (2) sample volume, and (3) measured radioactivity of the sample. In addition, probability distribution of the released radioactivity was simulated by Monte Carlo method combining the probability distribution of each input parameter It was shown that the radioactivity released to the environment, which has been reported as a single value, has a certain form of probability distribution.

  • PDF

Uncertainty Analysis of Surface Image Velocimetry for the Levee Monitoring (제방 모니터링을 위한 표면영상유속계의 불확도 해석)

  • Kim, Seo-Jun;Yu, Kwon-Kyu;Yoon, Byung-Man
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.146-146
    • /
    • 2012
  • 영상 분석을 통하여 하천의 표면유속을 산정하는 표면영상유속계(SIV)는 기존 유속측정 방법들에 비해 간편하고, 효율적이며 짧은 시간에 원하는 영역의 유속장을 산정할 수 있다는 장점을 가지고 있다. 하지만 현장 상황에 따라 분석을 위한 변수들을 달리 적용하고 있기 때문에 사용자마다 유속 결과가 달라질 수 있다는 단점이 있다. 이에 본 연구에서는 표면영상유속계의 측정 불확도 산정을 위해 기지의 유속 분포와 추적자 분포를 가진 인공 영상들을 제작하였다. 이 인공 영상들은 입자영상유속계(PIV)의 불확도 분석에 많이 사용되는 표준 PIV 영상과 유사한 것이다. 이 인공 영상을 이용하여 영상의 취득과 처리에 관련된 여러 변수가 최종 유속장에 미치는 영향을 분석하였다. 연구된 변수에는 상관창의 크기, 탐색창의 크기, 추적 입자의 농도, 면외 속도와 평균 영상 속도, 두 영상간의 시간 간격이 포함된다. 상호상관법을 이용하여 고정확도의 결과를 얻기 위해, 상관창의 크기는 상관창 안에 포함되는 입자의 수가 충분할 만큼 커야 하며, 추적 입자의 농도가 정확도에 크게 영향을 미치는 것을 확인하였다. 또한, 상호상관법을 이용하여 정확도 높은 유속측정 결과를 얻기 위해서는 최적 시간간격 또는 평균 영상 유속이 선택되어야 함을 보였다.

  • PDF

Comparison of ISO-GUM and Monte Carlo Method for Evaluation of Measurement Uncertainty (몬테카를로 방법과 ISO-GUM 방법의 불확도 평가 결과 비교)

  • Ha, Young-Cheol;Her, Jae-Young;Lee, Seung-Jun;Lee, Kang-Jin
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.38 no.7
    • /
    • pp.647-656
    • /
    • 2014
  • To supplement the ISO-GUM method for the evaluation of measurement uncertainty, a simulation program using the Monte Carlo method (MCM) was developed, and the MCM and GUM methods were compared. The results are as follows: (1) Even under a non-normal probability distribution of the measurand, MCM provides an accurate coverage interval; (2) Even if a probability distribution that emerged from combining a few non-normal distributions looks as normal, there are cases in which the actual distribution is not normal and the non-normality can be determined by the probability distribution of the combined variance; and (3) If type-A standard uncertainties are involved in the evaluation of measurement uncertainty, GUM generally offers an under-valued coverage interval. However, this problem can be solved by the Bayesian evaluation of type-A standard uncertainty. In this case, the effective degree of freedom for the combined variance is not required in the evaluation of expanded uncertainty, and the appropriate coverage factor for 95% level of confidence was determined to be 1.96.

Analysis on the Propagated Uncertainty of Output Power of Class-F Power Amplifiers from DC Biasing and Its Optimization (F급 전력증폭기의 출력 전력 불확도에 대한 DC 영향 분석 및 최적 바이어스 조건 도출에 관한 연구)

  • Park, Youngcheol;Yoon, Hoijin
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.25 no.2
    • /
    • pp.183-188
    • /
    • 2014
  • In this paper, the propagation effect of power supply uncertainty on the output of class-F power amplifier has been estimated. Also, a 1.9 GHz, 10 watt class-F power amplifier was measured to verify the estimation and to find the optimal biasing point. By approximating the propagation theory of uncertainties, the propagation effect of bias uncertainty was mathmatically calculated. As a result, the DC biases have propagated uncertainties of 15~70 mW. However, at the optimized bias point, the uncertainty in the output power could be dropped less than 15 mW while the output power has dropped by 0.37 dB.