BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Jung, Do-Young;Baek, Yuong-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.321-325
    • /
    • 2008
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

BIM Application for Civil Engineering Project in Planning and Design Phases (토목공사 기획 및 설계단계의 BIM 적용방안 연구)

  • Kang, Leen-Seok;Kim, Seol-Gi;Kim, Hyeon-Seung;Moon, Hyoun-Seok
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.26-31
    • /
    • 2011
  • Due to the characteristics of 3D objects of building construction projects which have regular, vertical and repetitive shapes, the most practical utilization of BIM in the country is focused on building projects. The characteristics of 3D objects of civil engineering project have irregular, horizontal and non-repetitive shapes. Therefore, consisting of a practical BIM model is difficult comparing with building project. This study suggests an application process of BIM for the planning and design phases for civil engineering project. A BIM system is developed based on suggested BIM process and it is verified through a bridge construction project.

Using the common-WBS based on the Construction Classification System for the integration of Schedule and Cost information (공정-내역정보 연계를 위한 통합건설정보분류체계기반의 공통WBS 활용방안 -도로공사 사례를 중심으로-)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.107-114
    • /
    • 2005
  • The time and cost is the most important information for the construction project management. Currently, a lot of studies have been done in order to clearly relate them with each other, but there have been some difficulties. Because of the characteristic of Korean government contract law, the construction project in Korea is managed by only cost and the time and cost information is distinctly separated. In order to manage all the major construction project information smoothly, the time and cost information should have relation with each other. This study suggest methods for relating the time and cost information, especially for road construction project of MOCT. Through the survey of construction field engineers and case study of the road construction project, several alternatives to improve the usability of construction information are suggested in this study. These alternatives can support relating other construction information.

An Analysis on the Revision Factors of Construction Cost Calculation Criteria through Field Survey of Waterproof Work (방수공사 현장시공실태에 따른 공사비산정기준 개정요인에 관한 연구)

  • Oh, Jae Hoon;Ahn, Bang Ryul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.10
    • /
    • pp.468-477
    • /
    • 2019
  • This study analyzed the major contents and results of revision through an analysis of the specifications and the field survey to revise the construction cost calculation criteria. The result of the survey found that the background processing difficulty was reduced due to an improvement of the quality level of the field floor, and the enhancement of the material's function brought a decrease in construction time and the application of various construction methods. In addition, the application of combined waterproofing methods using more than one material was increasing and the productivity differed according to the site and location. Based on these results, waterproof items were subdivided and applied to the composite construction method, and the input items were differentiated according to the material and construction method. The adequacy of the construction calculation criteria was ensured by presenting the criteria classified according to the construction area, and deleting the items that are not applicable and amending them to make them suitable for the specifications by reflecting the actual conditions of the construction on the site.

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Baek, Young-In
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.695-699
    • /
    • 2009
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

Deduction of Considerations During Design and Construction by Analysing Domestic and Abroad Case Analysis of Freeform Building Envelope (국내외 비정형 건축물 외피시스템 사례 분석을 통한 설계 및 시공시 고려사항 도출)

  • Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.84-96
    • /
    • 2013
  • Recently, architectural design has been changing from formal design to freeform design due to the digitalization of construction industry. Especially, the formal design has been accepted as a design trend recently and applied many times as a design concept in the architectural design competitions such as turn-key. However, various deflects such as water leak and cracks have been occurred because the traditional construction methods had been applied without any revision or adaptation of the formal construction method for the freeform building construction. Design and construction of freeform building has been developed as an new method in order to solve the problems and minimize the construction duration and cost for the freeform building. Therefore this research deduced the positive implications for developing freefrom envelope by analyzing the domestic and abroad cases and proposed the considerations during design and construction of the freeform envelope as follows. First, the freeform design should consider the constructability for the freeform envelope. Second, manufacturing technology for the two-way curvature of the unit panel should be developed. Third, exposed concrete form method should be developed for the freeform envelope of concrete. Forth, material characteristics, construction method and facility management should be considered in order to manage precipitation and keep water-proof according to the classification of the freeform envelope area.

Project of Dam Safety reinforcement on Gampo Dam (감포댐 안전성강화 사업)

  • Cheon, Geun Ho;Han, Yong Hun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.214-214
    • /
    • 2022
  • 감포댐은 2006년 준공하여 각종 시설 및 설비의 노후화가 진행중에 있으며, 최근 감포댐 인근 지역에서 발생한 경주지진(규모 5.8) 및 포항지진(규모 5.4)이 발생하여 지진시 시설물의 안전성에 대해 중요성이 대두되고 있었다. 이에 감포댐 안전성강화 사업을 추진하게 되었고, 주요 사업내용은 취수탑 관리교 내진보강, 댐체 심벽보강을 통한 댐체 안전성확보, 비상방류시설 개선이다. 취수탑 관리교는 교각단면의 변위연성도 및 교량받침에 의한 구조물 안전성 평가를 시행하였고, 단면강도는 모멘트-곡률해석법에서 탄성영역의 단면강도 대비 탄성지진력을 비교하여 안전성을 검토하였다. 검토결과 교량받침의 내진성능은 부족한 것으로 검토되어 유량제어형 멀티펌프와 안전잭을 이용한 변위제어 방식의 교량동시 인상공법이 가능하고 인상정밀도 ±0.5mm이내의 성능을 가진 교량인상공법 적용하여 보강을 하는 것으로 계획하였다. 댐체 심벽보강을 위해 먼저 전기비저항탐사를 수행하여 전기비저항대를 탐사하여 심벽부에서 포화대가 형성된 부위를 조사하였다. 그리고 댐 상·하류에 전극을 설치하고 전류를 발생시켜 측정 지점별 자기장을 측정을 통하여 댐체내 침투에 따른 유로 형성여부 파악을 위한 전자기장탐사를 시행하였다. 마지막으로 심벽 시추조사를 시행하여 공내수를 조사하였다. 조사결과 포화대의 위치 및 이상대가 다양한 것으로 나타났으며, 이는 불특정 지점에 연약대가 존재한다 판단하여 심벽부 보강계획을 전반적으로 적용하는 것으로 결정하였다. 비상방류시설은 최근 15년 실측자료의 홍수기(6~9월) 평균유입량을 적용하여 검토하였으며 검토결과 배제대상 높이 75%까지는 3.7일, 완전배제까지는 11.2일이 걸려 댐설계기준을 충족하는 것으로 검토되다. 다만 감포댐 비상방류시설이 하천제방과 직각방향으로 형성되어 있고, 하천의 폭이 좁아 과거 방류시에도 제방을 월류하는 것으로 조사되어 하천의 세굴을 방지하고 제방 안전성을 확보하기 위하여 비상방류시설에 감세공을 설치하고, 제방에 디플렉터 옹벽을 설치하는 것으로 계획하였다. 감세공은 2번에 걸친 감세효과로 방류시 하류바닥 및 옹벽 보호 효과가 큰 미국 USBR의 TypeVI를 적용하였으며, Flow-3D 모델링을 통하여 제방에 월류가 발생하지 않는 최적의 대안 옹벽규모를 산정하였다.

  • PDF

Research on the Architectural Applications of High-Performance Vacuum Insulation Panel (고성능 진공단열재의 건축적인 적용에 관한 연구)

  • Kwon, Young Cheol;Kim, Suk
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.23-32
    • /
    • 2019
  • Vacuum Insulation Panel(VIP) has the lowest thermal conductivity among present insulations. It is composed of envelope, core material and getter. Aluminum film is usually used as the envelope of VIP, and it is important component to decide the useful life of VIP. In this research, the thermophysical properties of incombustible fiber glass core VIP were investigated with the possibility of its architectural applications. The results of this research can be summarized as follows: 1) The thermal conductivity of 20mm-thick fiber glass core VIP is resulted as 0.00177W/m·K, which means that 20mm-thick VIP can meet all the reinforced insulation guideline and it can be used in any envelope of any region in Korea. 2) As a result of the test of incombustion and gas toxicity, fiber glass core VIP was suitable for incombustible material. 3) As the test result for the long term thermal conductivity, fiber glass core VIP was found out that it would keep above 10 times insulating performance than polystyrene foam and glass fiber. 4) To meet the thermal transmittance of 0.12W/㎡K, limited-combustible insulation of expanded polystyrene foam and phenolic foam should be used respectively as thick as above 280mm and 170mm, incombustible VIP can meet the same insulation level with 20mm thickness. 5) The price competitiveness of incombustible VIP to meet the thermal transmittance of 0.12W/㎡·K was about 1,500won/㎡ higher than that of phenolic foam.

Constructability Evaluation of Seismic Mechanical Splice for Slurry Wall Joint Consisting of Steel Tube and Headed Bars (슬러리월의 내진설계를 위한 강재각관과 확대머리 철근으로 구성된 기계적 이음의 시공성 평가)

  • Park, Soon-Jeon;Kim, Dae-Young;Lim, In-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.3
    • /
    • pp.295-303
    • /
    • 2023
  • South Korea has recently witnessed an increasing number of seismic events, leading to a surge in studies focusing on seismic earth pressures, as well as the attributes of geological layers and ground where foundations are established. Consequently, earthquake-resistant design has become imperative to ensure the safety of subterranean structures. The slurry wall method, due to its superior wall rigidity, excellent water resistance, and minimal noise and vibration, is often employed in constructing high-rise buildings in urban areas. However, given the separation between panels that constitute the wall, slurry walls possess limited resistance to seismic loads in the longitudinal direction. As a solution, several studies have probed into the possibility of interconnecting slurry wall panels to augment their seismic performance. In this research, we developed and evaluated a method for linking slurry wall panels using mechanical joints, including concrete-confined steel pipes and headed bars, through mock-up tests. We also assessed the constructability of the suggested method and compared it with other analogous methods. Any challenges identified during the mock-up test were discussed to guide future research in resolving them. The results of this study aid in enhancing the seismic performance of slurry walls through the development of an interconnected panel method. Further research can build on these findings to address the identified issues and improve the efficacy and reliability of the proposed method.