The purpose of this study is to apprehend the behavior of exhaust gas flow from gas turbine during part load operation in Heat Recovery Steam Generator. As a first step of this work, internal flow characteristics according to HRSG types were examined by CFD analysis. Next step, tube temperature according to gas turbine 53% and 100% load conditions were calculated by results of CFD and those were compared with temperature data gathered from real plant. Finally, thermal performance due to part load operation was calculated to estimate the influence of heat transfer in superheater. In addition, new type of device is suggested to eliminate the uneven temperature distribution of tubes during part load operation.
In this study, we investigated the operation data of combined heat and power in accordance with the change of the inlet guide vane with partial load. The partial load 80% could close the inlet guide vane up to 24%, and the exhaust gas temperature could be increased by 52℃. The partial load 90% could close the inlet guide vane up to 12%, and the exhaust gas temperature could be increased by 23℃. At 80% of partial load with the thermal load tracking mode, the output could be increased up to 5.68 MW, the combined cycle efficiency increased by 0.73%, and the combined heat and power efficiency increased by 1.81%. At 90% of the partial load, the output could be increased up to 2.55 MW, the combined cycle efficiency increased by 0.32%, and the combined heat and power efficiency increased by 0.72%.
Transactions of the Korean Society of Mechanical Engineers
/
v.18
no.1
/
pp.232-239
/
1994
This paper presents an effective way of improving fuel consumption for a variable displacement engine. The improvement of fuel consumption can be accomplished by means of deactivating inlet and exhaust valves, reducing the number of effective cylinders of a four-cylinder gasoline engine that is mounted on a domestic compact automobile.
As absorption type heat pump for waste heat recovery is installed in combined cycle power plant for Energy Service Company, performance test is implemented to confirm the operation data on partial load. The operation data changes according to the heat pump operation on partial load are as follows. Total heat output increases, because waste heat of closed cooling water and a portion of LP steam from HRSG is supplied. But electric power output of steam turbine is reduced, because LP steam to steam turbine is reduced. And heat output from HP district heater and LP district heater is reduced, because HP turbine exhaust steam to HP district heater and LP district heater is reduced. On partial load operation, turbine output reduction is higher than the base load operation. Therefore, on partial load, heat pump should be operated in consideration of the heat output increase and electric power output reduction.
In a centralized cooling plant, precise mechanical design and control strategy are required for peak and partial cooling load management. Otherwise, it will lead to low efficiency of cooling system and energy loss due to low partial load efficiency. The purpose of this paper is to enhance energy performance of the centralized cooling plant by controlling flow system in an industrial building using measured data and energy performance simulation program. The simulation results show that the proposed flow control can cut down annual electric power consumption by about 17% compared with the conventional cooling system.
Proceedings of the Korean Information Science Society Conference
/
2000.04a
/
pp.606-608
/
2000
네트워크의 속도가 빨라짐에 따라 저비용으로 고성능의 성능을 얻고자 하는 클러스터 시스템에 대한 연구가 많아지고 있다. Fast Ethernet, ATM, Myrient, SCI와 같은 고성능 네트워크 시스템이 많이 사용되고 있다. 기존 분산시스템에의 부하 불균등 문제가 이런 클러스터 시스템에서도 역시 문제시 되고 있다. 일반적인 동적 부하균등화 방법은 실행시간중에 노드들의 부하량에 대한 정보를 얻어 전체 노드들이 평균의 부하량에 수렴하도록 하는 것을 목적으로 한다. 그러나, 통신비용과 노드 복잡도에 따라 완벽한 부하균등화를 하는 것이 효율적인 부하균등화를 얻는 것이 아니다. 부하균등화 노드 복잡도에 따라 완벽한 부하듄등화를 하는 것이 효율적인 부하균등화를 얻는 것이 아니다. 부하균등화 비용이 클때는 완벽한 부하균등화보다는 이득률이 크도록 하는 부분적 부하 균등화가 더 효율적일 수 있다. 본 논문에서는 클러스터 시스템을 모델링하고 이에 적합한 부분적 동적 부하 균등화 모델을 제시한다.
The main engine of a vehicle is used an common rail diesel engine for improving the efficiency of the whole load area. However, the generator engines is still used mechanical fuel injection valve drive cams. In addition, most of generator engines is applied a part-load operation of less than 50%. Therefore, diesel engine of vehicle set at 100% load is necessary to readjust in order to perform efficient operation because of part-load operation. In this study, the objective is to report the results of the part-load fuel consumption improvement by injection timing readjust to identify the operational characteristics of a generator engine currently operated in the facilities.
Journal of Advanced Marine Engineering and Technology
/
v.38
no.7
/
pp.877-882
/
2014
The reduction of CO2 emission has been discussed in the Marine Environment Protection committee in the International Maritime Organization as the biggest causes of GHG for the purpose of indexing CO2 amounts released into the atmosphere from ships. Accordingly, various methods including the change in the hull design to improve energy efficiency, the coating development to reduce friction resistances, the additives development for improving thermal efficiency in an engine, the low-speed operation to reduce fuel consumptions, and etc. have been applied. The main engine of a ship is an electronic engine for improving the efficiency of the whole load area. However, marine generator engines still use mechanical drive engines in intake, exhaust, and fuel injection valve drive cams. In addition, most of marine generator engines in ships apply a part-load operation of less then 80% due to an overload protection system. Therefore, marine auxiliary diesel engine set at 100% load is necessary to readjust in order to efficient operation because of part-load operation. The objective of this study is to report the results of the part-load fuel consumption improvement by injection timing readjust to identifying the operational characteristics of a marine generator engine currently operated in a ship.
전화국사 내 교환기의 신설이나 증설 시에 최적의 열부하 산정이 필요하다. 이를 위해 전화국사의 특성에 알맞은 열부하 계산 프로그램을 윈도우용으로 개발하여 비전문가들도 쉽게 사용할 수 있도록 하고자 한다. 프로그램 구성은 기본자료입력부, 전화국사의 자료입력부, 입력된 데이터를 이용하여 국사의 냉방부하와 냉방시스템의 용량을 계산하는 부분 그리고 출력부분으로 크게 4부분으로 나눌 수 있다. 본 프로그램을 이용하여 한국통신 중앙전화국 5ESS실의 냉방기기용량을 산정해 본 결과, 기존 냉방기기 69USRT의 49%에 해당되는 33.5USRT로 나타나 기존 냉방기기의 용량이 너무 과다하게 선정되었음이 판명되었다. 본 프로그램은 전화국사의 에너지 절약에 기여할 수 있을 것으로 판단된다.
Transactions of the Korean Society of Mechanical Engineers B
/
v.37
no.11
/
pp.1015-1022
/
2013
This study simulates the operation of a 200 kW class micro gas turbine that is currently under development. The performance and operating characteristics depending on the load control scheme (constant turbine inlet temperature versus constant turbine exit temperature) and ambient condition were investigated using detailed component performance data. The sensitivities of operating parameters, such as the compressor surge margin and flow path temperatures, according to unit fuel flow change were predicted for a wide load range. The sensitivity analysis showed that the steady state calculation provided useful information about the maximum surge margin reduction during load change.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.