• Title/Summary/Keyword: 버력

Search Result 31, Processing Time 0.02 seconds

The effect of material behavior of blasted muck on the impact force applied on a protector (발파 버력의 재료거동이 프로텍터에 작용하는 충격하중에 미치는 영향)

  • Kim, Woong-Ku;Jin, Byeong-Moo;Baek, Ki-Hyun;Seo, Kyoung-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.3
    • /
    • pp.261-275
    • /
    • 2011
  • To maintain the traffic flow during tunnel expansion, cars must be protected from falling rocks during excavation and to do so, a protector has to be installed inside the tunnel before beginning the excavation. In Korea, tunnel expansion by blasting rather than by mechanical excavation has been widely achieved. For this reason, a series of numerical analysis were performed to analyze the characteristics of impact load according to material behaviour of blasted rock by using Explicit FEA program. From the numerical results, it is found that the impact loads when rock is assumed as an elastic-plastic material appear to be only 7~12% compared with that when it is elastic.

Stability Analysis of Embankment Slopes Consisting of Rock Fragments (암석 버력으로 성토한 사면의 안정성 해석)

  • 김치환
    • Tunnel and Underground Space
    • /
    • v.12 no.2
    • /
    • pp.83-91
    • /
    • 2002
  • Stability analysis of rocky embankment slopes is done by both the limit equilibrium method and the finite difference method. The height or the rocky embankment is approximately 40 m and the side slope is 1 vertical to 1.5 horizontal. The cohesion and internal friction angle of rock debris are assumed zero and 43$^{\circ}$, respectively. For finite difference analysis, strength reduction method is used to calculate the saft factor of the slope. As a result, the safety factor of the slope is discovered to be 1.4 by using either methods. Considering that the design criteria of the safety factor is 1.3, it can be judged that the rock fragments embankment slope is in a stable state.

An experimental study on screw conveyor system of EPB shield TBM (EPB Shield TBM의 스크루 컨베이어 시스템에 관한 실험적 연구)

  • Kim, Sang-Hwan;Kim, Jin-Dae;Park, Inn-Joon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.6
    • /
    • pp.519-530
    • /
    • 2011
  • The screw conveyor system installed in EPB Shield TBM chamber was manufactured in small scale for pilot test to investigate the tunnel muck hauling system that could control the earth pressure and support face thrust force. In this experimental study, there were three different test conditions that include screw angles, screw pitch, and screw RPM. Through analysis on test results based on the muck hauling amount per unit time from screw conveyor, the optimum conditions of screw conveyor were proposed to be efficiently performed by the muck processing system. Finally, this study provided the meaningful results such as optimum screw angle, screw RPM, and screw pitch for anti-reverse flow of muck hauling.

Research on productivity analysis of tunnel refuse arrangement process due to ability variation of car-lift (카리프트의 성능 변화에 따른 터널공사 버력처리 공정 생산성 분석 연구)

  • Lee, Si-Wook;Shin, Jung-Min;Woo, Sung-Kwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.593-596
    • /
    • 2006
  • Productivity is the most important factor directly link to success and failure of a work in construction industry. To evaluate this productivity, simulation technique is verified as a fine inspection tool through various experiment reports. On this project, we have proved the part of improvement on productivity using this simulation technique, applied to this field sites. We have used CYCLONE, which is the most appropriate simulation technique on this project. As a result of Simulation analysis, it has been confirmed that the productivity was enhanced due to the advancement of equipment, hence the reduction of air is being effected.

  • PDF

Hauling time prediction of the muck generated by a blasting around a tunnel (터널 주변 폭발로 인해 발생된 버력의 처리시간 예측)

  • You, Kwang-Ho;Son, Myung-Kyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.1
    • /
    • pp.33-47
    • /
    • 2013
  • When a bomb explodes near a tunnel, generated muck should be quickly moved outside for rehabilitation of the tunnel. In this study, the amount of muck generated by an explosion was estimated and a methodology was presented for the prediction of the muck hauling time. To this end, 3D-meshes were made by using SoildWorks and blasting analyses were performed by using AUTODYN. A method was suggested to calculate theoretically the amount of muck which inflows into a tunnel based on the relationship between the tunnel and the fragmentation zone obtained from the analysis results. Also, muck hauling times were predicted based on the selection of construction equipment and the results were compared and analyzed. As a result, it was convinced that the amount of muck flowing into the tunnel could be effectively calculated by classifying the relationship between a tunnel and the fragmentation zone into 4 cases and using the mensuration by parts. Also it was confirmed that the closer blasting location is to the portal and the excavation surface of a tunnel, and the more blasting location deviates from the center line of the tunnel, the lesser amount of muck occurs and thus the muck hauling time decreases as well.

버력처리 기계

  • 조현
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.7 no.3
    • /
    • pp.9-23
    • /
    • 2005
  • PDF