• Title/Summary/Keyword: 배면 콘크리트

Search Result 71, Processing Time 0.025 seconds

A Case Study on Buckling Incidents of Steel Liner under External Water Pressure (외수압에 의한 강관 라이닝 좌굴 사례 연구)

  • Chung, Kyujung;Chung, Kyungmun;Shin, Hyohee;Kim, Daeho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.12
    • /
    • pp.13-20
    • /
    • 2011
  • The main objective of this paper is finding the influence factors and their degree of importance to steel liner's safety by investigating and evaluating the buckling incidents of steel tunnel liner under external water pressure. The study was based on the detailed investigation to the design conditions and incident shapes at 2m diameter waterway tunnel with a partially buckled internal steel liner and concrete backfilled lining as the raw water transmission pipe line of regional water supply project. Appropriate buckling theory capable of applying this incident points was selected by referring the existing literature and compared with the results of investigation. Also, hydrogeological characteristics of this site on buckling pressure was evaluated. The result of this study was shown that both the hydrogeological characteristics of upper geologic layers and proper tunnel construction are important factors on buckling at steel liner, and hydraulic gradient level should be decided according to the hydrogeological characteristics. This incident case analysis on steel liner of pressurized waterway tunnel was expected to provide more information for realizing the problems and improvements at each design, construction and maintenance stages.

Design of Replacement Method on Anti-freeze Process of L Type Retaining Wells (L형 옹벽의 동상대책에 있어서 치환공법의 설계)

  • Rui, Da-Hu;Kim, Young-Su;Suzuki, Teruyuki
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.9
    • /
    • pp.19-27
    • /
    • 2009
  • In order to investigate anti-freeze process of precast concrete L-type retaining walls in cold regions, test walls were installed in the campus of Kitami Institute of Technology (KIT, Hokkaido, Japan). The wall consists of following three sections, i) back filled with frost susceptible clay soil, ii) using thermal insulation material, and back filled with frost susceptible soil, iii) back filled with frost-unsusceptible soil. The freezing front distribution and ground temperature within the backfill were observed and deflections of the walls were measured over three freeze-thaw seasons. Some understanding of the mechanisms of the build-up of frost heave pressure was gained, and the effectiveness of replacement method was observed. A simulation was performed to predict the shape of the freezing front in the backfill behind L-type walls with various cross sections. These findings were employed to propose a method for determining the appropriate zone to be replaced with frost unsusceptible backfill material in cold regions.

Side Friction of Deep Foundation for Transmission Tower in Rock (암반에 설치된 송전철탑 심형기초의 주면마찰력 평가)

  • Kim, Dae-Hong;Lee, Dae-Soo;Chun, Byung-Sik;Kim, Byung-Hong
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.4
    • /
    • pp.149-160
    • /
    • 2007
  • Six prototype field tests (five 1/8 and one 1/2 scale tests) have been conducted in order to determine the uplift resistance of deep foundation for transmission line structures. Test sites, located in the city of Eumseng in Choongbuk province, are classified as gneiss. These test results reveal failures not along the foundation-rock interface but either along the damaged surrounding rock mass caused by excavation or along the pre-existing rock joint. Test results also show the uplift resistance which is 20 $\sim$ 30% higher than the current design strength of side friction. In addition to fold tests, four concrete core samples between the liner plate and the surrounding rock mass have been obtained from the existing transmission foundations to study the effect of the liner plate which is installed prior to placing concrete. The compressive strength of these concrete core samples shows 63 $\sim$ 72% of the strength at the time of foundation construction. Side frictional resistance based on such less compacted concrete reaches satisfying uplift design strength.

A Study on Impact Resistance Properties with Composition Materials and Installation Conditions of Protective Panel (방호 패널의 구성 재료 및 설치 조건에 따른 내충격 특성에 관한 연구)

  • Seok, Won-Kyun;Kim, Young-Sun;Lee, Yae-Chan;Nam, Jeong-Soo;Kim, Gyu-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.6
    • /
    • pp.715-726
    • /
    • 2023
  • This study suggested that protective panels should be installed as sacrificial members as a safety design method for structures with potential explosions such as hydrogen charging stations to minimize direct damage to the structure and have resilience. To this end, the focus of the experiment is on quantitatively evaluating the impact of the structure when the protection panel is installed closely or spaced apart from the structure in a high-speed collision situation of the projectile. The experimental design used steel plates instead of concrete structural members mainly used in the past for excellent reproducibility, and the impact of structural members was compared and analyzed through deformation differences on the back of the steel plate. In addition, the impact of changes in the physical properties of the elastic body used as a separation material for the protective member and the difference in shock wave transmission time according to the protective member and the elastic body on the structural member was investigated.

Improvement of existing drainage system for leakage treatment in exiting underground structures (운영중인 지하구조물의 누수처리를 위한 유도배수공법의 개선)

  • Kim, Dong-Gyou;Yim, Min-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.4
    • /
    • pp.669-683
    • /
    • 2017
  • The objective of this study is to propose a modification of the previously proposed drainage system for catching the partial leakage of underground concrete structures. Two techniques were proposed for applying the drainage system only to the leaking parts. One was for conveying leaking groundwater to the collection point in the drainage system and the other was for conveying the collected groundwater to the primary drainage system of the underground concrete structure. Four waterproofing materials for conveying leaking groundwater to the catchment point of the drainage system, Durkflex made of porous rubber material, KE-45 silicone adhesive with super strong adhesion, Hotty-gel made of polymeric materials and general silicone adhesive were evaluated for waterproofing performance. Hotty-gel only showed perfect waterproof performance and the other three waterproof materials leaked. The modified drainage system with Hotty-gel and drainage pipe with fixed saddle to convey the leaking groundwater from the catchment point to the primary drainage system were tested on the concrete retaining wall. The waterproof performance and the drainage performance were evaluated by injecting 1,000 ml of water in the back of the modified drainage system at the 7-day, 14-day, 21-day, 28-day, 2-month and 3-month. There was no problem in waterproof performance and drainage performance of the modified drainage system during 3 months. In order to evaluate the construction period and construction cost of the modified drainage system, it was compared with the existing leaching repair method in surface cleaning stage, leakage treatment stage, and protective barrier stage. Total construction period and construction cost were compared in considering the contents of work, repair material, construction equipment, working time, and total number of workers. As a result of comparing and analyzing in each construction stage, it was concluded that the modified drainage system could save construction period and construction cost compared to the existing leaching repair method.

Application on the CFBC Fly Ash as a Stimulant to Improve the Early Strength of Hydration Portland Cement (슬래그시멘트 초기강도 증진을 위한 자극제로서 CFBC Fly ash의 활용연구)

  • Park, JongTak;Oh, Hongseob;Jung, Gwon Soo;Kang, Chang Ho
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.8 no.1
    • /
    • pp.8-16
    • /
    • 2020
  • As the circulating fluidized bed combustor(CFBC) boilers system to generate electric power increase in order to reduce environmental pollution, a lot of CFBC fly ashes(CFFA) are produced. CFFA has limited use in concrete because it contains free CaO, which can cause cement expansion and rapid initial hydration. In this study, the microstructure and the initial development of compressive strength characteristics were experimentally analyzed to be used as a stimulant to replace natural gypsum by mixing with CFFA and phosphate gypsum to enhance the initial strength of portland blast furnace slag cement. The recycled gypsum was used as flue-gas desulfurization gypsum and phosphate gypsum. Experimental results show that the initial strength development is relatively lower when CFFA and dihydrate gypsum are mixed, but the strength improvement effect of the mixture with CFFA and anhydrous gypsum as an anhydritedII typed crystalized gypsum is similar to that of natural gypsum. As a result, it w as analyzed to have high possibility of use for stimulant of portland blast furnace slag cement.

A Study on Effect of Earth Pressure Reduction and the Silo Earth Pressure of the Retaining Wall by CLSM Backfill with Waste Foundry Sand (폐주물사를 이용한 유동성 채움재의 절토구간 옹벽 뒤채움시 사일로토압 및 토압경감효과 연구)

  • Cho, Jae-Yun;Lee, Kwan-Ho;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.4 no.2 s.12
    • /
    • pp.19-31
    • /
    • 2002
  • The recycling of waste foundry sand(WFS) and fly ash as by-products of industry is one of the urgent problem to deal with. For the recycling of these materials, CLSM(controlled low strength materials) concept was adopted. This research has been done for last three years. In this research, couple of selected waste foundry sand and fly ash were used as fine aggregate. Also, WFS modified by Proper chemical liquid was used for the comparison. The main focus is to evaluate the silo earth pressure and the reduction effect due to the use of CLSM instead of normal fine aggregate. Silo effect, which occurs at short distance between retaining wall and backfill, was not detected because the characterization of CLSM is highly different from that of normal aggregate. Therefore, the theory for earth pressure, like Rankine theory or Coulomb theory, should be carefully used for CLSM. The reduction of earth pressure for modified WFS is higher than the others. But, the final earth pressure is converged at very small value, even though the reduction effect depends on the curing time.

  • PDF

Study on the Displacement of Crib Wall System (Crib Wall System 변위해석에 관한 연구)

  • Kim, Doo-Jun;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.3
    • /
    • pp.201-209
    • /
    • 2002
  • Crib wall system is one of segmental crib type wall. Crib walls are constructed from separate members with no bonds between them other than frictional. The wall units are divide into two main types termed headers and stretchers. The headers run from the front to the back of the wall, perpendicular to the wall face. The cells are created by forming a grid by stacking individual wall components known as headers and stretchers. The body of wall consists of a system of open cell which are filled with a granular material. The design of crib retaining wall is usually based on conventional design methods derived from Rankine and Coulomb theory so that is able to resist the thrust of soil behind it, because it may be assumed that the wall acts as a rigid body. However, deformation characteristics of crib walls cannot be assumed as monolithic. They consist of individual members which have been stacked to creat a three dimensional grid. Therefore, the segmental grid allows relative movement between the individual member within the wall. The three dimensional flexible grid leads to stress distribution by interaction behavior between soil and crib wall. Therefore, in this study, in order to analysis the trends of deflection of crib wall system, new numerical models based on the results of Brandl's full scale test are introduced for design concept.

A Case Study on the Reinforcement of Existing Damaged Geogrid Reinforced Soil Wall Using Numerical Analyses (수치해석을 이용한 기존 피해 보강토 옹벽의 보강에 관한 사례 연구)

  • Won, Myoung-Soo;Langcuyan, Christine P.;Choi, Jeong-Ho;Ha, Yang-Seong
    • Journal of the Korean Geosynthetics Society
    • /
    • v.19 no.1
    • /
    • pp.75-82
    • /
    • 2020
  • There have been often cases of collapse for geogrid reinforced soil (GRS) retaining wall. Hence, social interest in the reinforcement and restoration of the collapsed GRS wall is increasing day by day. However, there are only few researches. For this reason, a series of numerical analyses using the Plaxis 2D program was conducted in this study to analyze the suitable reinforcement methods that can be applied on the existing damaged GRS wall caused by overturning of the modular blocks facing and the surface settlement at the backfill as the results from the design failure. The restoration plan used in this study is composed of two cases: (Case 1) soil nailing reinforcement and reinforced concrete (RC) wall facing construction on the existing damaged GRS wall; and (Case 2) removal of the entire damaged GRS wall and then reconstruction. The results on the internal stability of the GRS wall show that Case 1 obtained a greater safety factor than Case 2 for tensile force while Case 2 had a greater safety factor than Case 1 for pullout failures. Case 1 was found to be more stable than Case 2 in terms of the global slope safety by shear strength reduction method and the external deformation behavior by numerical analysis. In this study, the existing damaged GRS wall which was reinforced using Case 1 method shows more stable external behavior.

Long-term performance of drainage system for leakage treatment of tunnel operating in cold region (한랭지역에서 운영 중인 터널의 누수처리를 위한 유도배수시스템의 장기 성능 평가)

  • Kim, Dong-Gyou
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1177-1192
    • /
    • 2018
  • The objective of this study is to develop the existing drainage system for catching the partial leakage of tunnel structures operating in cold region. The drainage system consists of drainage board, Hotty-gel as a waterproofing material, cover for preventing protrusion of Hotty-gel, air nailer, fixed nail, pipe for collecting ground leak, pipe for conveying ground leak, wire-mesh, and sprayed cement mortar. The drainage systems were installed in conventional concrete lining tunnels to evaluate the site applicability and constructability. The performances of waterproof and the drainage in the drainage system were evaluated by injecting 1,000 ml of red water in the back of the drainage system at 7 days, 14 days, 21 days, 28 days, 2 months, 3 months, 4 months, 5 months, 6 months, 7 months and 8 months. During 8 months of field test, the average daily temperature of the tunnel site was measured from $-16.0^{\circ}C$ to $25.6^{\circ}C$. The daily minimum temperature was $-21.3^{\circ}C$ and the daily maximum temperature was $30.8^{\circ}C$. There was no problem in waterproof and drainage performance of the drainage board in the drainage system. However, the pipe for conveying ground leak had the leakage problem from 14 days. It is considered that the leakage of the pipe for conveying ground leak was caused by the deformation of the pipe of the flexible plastic material having a thickness of 0.2 cm by using the high pressure air nailer and the fixing pin and the insufficient thickness and width of the hotty-gel for preventing the leakage.