• Title/Summary/Keyword: 배관 단열

Search Result 34, Processing Time 0.021 seconds

The Beat and Flow Analysis of the Liquid Helium for the Pressurization of Liquid Rocket Propellant Tank (액체로켓 추진제 탱크 가압용 액체헬륨의 열유동 해석)

  • 조기주;정영석;조인현;김용욱;이대성
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.7 no.1
    • /
    • pp.10-17
    • /
    • 2003
  • The steady and transient thermal and flow analysis for liquid helium using for the pressurization of liquid rocket propellant tanks have been conducted numerically. The required inner diameter of helium channel that satisfy the design mass flow rate and velocity, through the steady state analyses for various thermal conditions at the wall, is determined and it is found that due to the sign of Joule-Thomson coefficient of helium, the temperature of helium increase monotonically for adiabatic wall condition. The temporal behavior of helium temperature, density, velocity are also investigated under the existence of local heat inflow on the wall.

A Study on the Optimum Generation Condition of Ultrasonic Guided Waves for Insulation Pipelines (단열된 배관의 유도초음파 최적 발생조건 선정에 관한 연구)

  • Lee, Dong-Hoon;Cho, Hyun-Joon;Kang, To;Park, Dong-Jun;Kim, Byung-Duk;Huh, Yun-Sil;Lee, Yeon-Jae
    • Journal of the Korean Institute of Gas
    • /
    • v.20 no.6
    • /
    • pp.50-57
    • /
    • 2016
  • Pipeline is one of the most abundant components in petrochemical plant. It plays a critical role in transporting fluids. Some pipelines are thermally insulated by wrapping them with insulating materials to prevent the loss of energy. However, when corrosion begins under insulation, it cannot be easily seen without unwrapping the cover, and thus corrossion should be detected using a non-destructive ways such as ultrasound guided wave. In this paper, the piping where the CUI (Corrosion Under Insulation) which occurs in the insulation parts guided waves effectively the optimum condition which is theoretical for selected guided waves phase velocity dispersion curve and wave-structure. The results of this study are expected to be directly utilized for onsite inspection of pipeline's CUI in many petrochemical plants.

One Dimensional Analysis on Alcohol Burner Flow for Turbopump Operation (터보펌프 구동용 알코올버너 유동 일차원 해석)

  • Kim, Seong-Lyong;Wang, Seung-Won;Han, Young-Min
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.21 no.4
    • /
    • pp.1-11
    • /
    • 2017
  • TPTF (Turbopump Real Propellant Test Facility) at Naro Space Center has used alcohol burner system to simulate the gas flow of gas generator of liquid rocket engine. During the test at TPTF, the temperature and pressure at turbine inlet were smoothly increased while those of the gas generator of engine were constant. Present research developed a simulation code for the burner and the piping system and applied to the system. The calculation results were in good agreement with the test, and confirmed quantitatively that the non-steadiness is due to the heat transfer of the pipe. While the insulation of the pipe is ineffective, the length has a large impact on the turbine inlet condition. The present research clarified the empirically estimation of test condition, and can be applied to determination of the following test conditions.

이슈 & 이슈 - 원하는 만큼 고쳐쓰는 '아파트 리모델링'

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.277
    • /
    • pp.48-55
    • /
    • 2013
  • 국토교통부(장관 서승환)는 수직증축 리모델링 허용 등을 포함한 '공동주택 리모델링 제도개선 방안'(6.5 발표)의 후속조치로 노후 공동주택 거주 주민이 부담 가능한 범위에서 불편사례를 선택적으로 개선할 수 있도록 '맞춤형 리모델링' 활성화를 위한 연구용역을 마무리하고, 조만간 가이드라인을 제작 발표할 계획이라고 밝혔다. 가이드라인에는 주차장 부족, 배관 노후화 등 노후 공동주택 거주 주민들의 주요 불편사항(급 배수관 노후화, 주차장 부족, 난방효율 저하, 승강기 부족 등)을 효과적으로 해소할 수 있도록 단지 동 세대 내에서 각각 시행할 수 있는 총 39가지의 리모델링 아이템에 대한 소개와 공사비 등의 정보가 포함될 예정이다. 먼저, 단지내 리모델링에는 데크 지하주차장 신설, 녹지 보육시설 및 헬스장 등 확충, 노후상가 철거 후 별동 증축 등이 포함되며, 아파트 개별 동 내에서는 급 배수관/전기 통신/소방 등 노후 설비 교체, 승강기 신설, 코어증축(복도${\rightarrow}$계단식 변경) 등이, 세대 내에는 문 창호 및 내장재 교체, 단열 기밀 등 에너지 성능 향상, 실내공간 재배치 등이 포함된다. 특히, 아이템별 이주기간을 재실형과 이주형으로 구분하여 주민 선택의 폭을 한층 더 넓힐 것으로 기대된다.

  • PDF

Bayonet type vacuum insulated pipes with Teflon seal (Teflon seal을 이용한 bayonet형 진공단열배관)

  • 이현철;강형석
    • Proceedings of the Korea Institute of Applied Superconductivity and Cryogenics Conference
    • /
    • 1999.02a
    • /
    • pp.173-176
    • /
    • 1999
  • Vacuum insulated pipes (VIP) are one of the important equipments for cryogenic fluids' transfer. Flange type of VIP, which can easily be installed at the site, uses a set of male and female bayonet with very small gap between them. In order to prevent leakage of liquid from inner pipe to bayonet. Teflon or Kel-F is located outside both the inner pipe of male and the guide of female. Even though liquid may leak at room temperature, it cannot leak at cryogenic temperature since Teflon shrinks much more than pipes and adheres closely to the inner pipe and guide. Teflon seal method has the advantage of easy fabrication, low cost and effective sealing compared to the conventional method.

  • PDF

연구원_연구과제 ③ - 기계설비공사 시공상세도 작성비 산정의 문제점 및 개선방안

  • O, Chi-Don;Lee, Yeong-Jun
    • 월간 기계설비
    • /
    • s.308
    • /
    • pp.44-45
    • /
    • 2016
  • 대한기계설비산업연구원(원장 이언구)은 지난해 4월 연구심의위원회에서 선정된 ${\triangle}$기계설비건설업 동향분석 ${\triangle}$기계설비건설업체의 부도예측 모형 연구 ${\triangle}$기계설비건설공사 시공상세도면 작성비 산정기준 연구 ${\triangle}$플랜트 건설 현장 외국인력 고용 개선방안 ${\triangle}$녹색기술 기준에 근거한 연구과제 도출을 위한 기초연구 ${\triangle}$대용량 지열설비 이용을 위한 지중열교환기 용량 설계 툴 개발 ${\triangle}$기계설비배관 및 장비 단열 기준 연구 등의 기본과제와 외부기관과 공동으로 수행한 ${\triangle}$플랜트 건설현장 외국인력 고용 개선방안 ${\triangle}$기계설비건설업 관련법류 개선방안 연구를 추진했다. 본지는 지난 2월호부터 연구결과 요약 보고서를 연재하고 있다.

  • PDF

연구원_2015 연구과제 ⑤ - 대용량 지열설비 이용을 위한 개방형 지중열교환기 용량 설계 Tool 개발

  • Ryu, Hyeong-Gyu;Yun, Hui-Won;Choe, Seung-Hyeok
    • 월간 기계설비
    • /
    • s.309
    • /
    • pp.48-50
    • /
    • 2016
  • 대한기계설비산업연구원(원장 이언구)은 지난해 4월 연구심의위원회에서 선정된 ${\triangle}$기계설비건설업 동향분석을 위한 기초연구 ${\triangle}$기계설비건설업체의 부도예측 모형 연구 ${\triangle}$기계설비건설공사 시공상세도면 작성비 산정기준 연구 ${\triangle}$플랜트 건설현장 외국인력 고용 개선방안 ${\triangle}$녹색기술 기준에 근거한 연구과제 도출을 위한 기초연구 ${\triangle}$대용량 지열설비 이용을 위한 지중열교환기 용량 설계 툴 개발 ${\triangle}$기계설비배관 및 장비 단열 기준 연구 등의 기본과제와 외부기관과 공동으로 수행한 ${\triangle}$플랜트 건설현장 외국인력 고용 개선방안 ${\triangle}$기계설비건설업 관련법규 개선방안 연구를 추진했다. 본지는 지난 2월호부터 연구결과 요약 보고서를 연재하고 있다.

  • PDF

연구원_2015 연구과제 ⑦ - 기계설비건설업 관련법규 개선방안 연구

  • Lee, Yeong-Jun;Han, Seong-Ae;Park, Jong-Il
    • 월간 기계설비
    • /
    • s.310
    • /
    • pp.112-114
    • /
    • 2016
  • 대한기계설비산업연구원(원장 이언구)은 지난해 4월 연구심의위원회에서 선정된 ${\triangle}$기계설비건설업 동향분석을 위한 기초연구 ${\triangle}$기계설비건설업체의 부도예측 모형 연구 ${\triangle}$기계설비건설공사 시공상세도면 작성비 산정기준 연구 ${\triangle}$플랜트 건설현장 외국인력 고용 개선방안 ${\triangle}$녹색기술 기준에 근거한 연구과제 도출을 위한 기초연구 ${\triangle}$대용량 지열설비 이용을 위한 지중열교환기 용량 설계 툴 개발 ${\triangle}$기계설비배관 및 장비 단열 기준 연구 등의 기본과제와 외부기관과 공동으로 수행한 ${\triangle}$플랜트 건설현장 외국인력 고용 개선방안 ${\triangle}$기계설비건설업 관련법규 개선방안 연구를 추진했다. 지난 2월호에 시작된 연구원의 연구결과 요약 보고서는 이번호로 연재를 마친다.

  • PDF

연구원_2015 연구과제 1 - 기계설비건설업 동향 분석을 위한 기초연구

  • Lee, Yeong-Jun;Kim, Mi-Ri;An, Mi-So
    • 월간 기계설비
    • /
    • s.307
    • /
    • pp.87-92
    • /
    • 2016
  • 대한기계설비산업연구원(원장 이언구)은 지난해 4월 연구심의위원회에서 선정된 ${\triangle}$기계설비건설업 동향분석 ${\triangle}$기계설비건설업체의 부도예측 모형 연구 ${\triangle}$기계설비건설공사 시공상세도면 작성비 산정기준 연구 ${\triangle}$플랜트 건설 현장 외국인력 고용 개선방안 ${\triangle}$녹색기술 기준에 근거한 연구과제 도출을 위한 기초연구 ${\triangle}$대용량 지열설비 이용을 위한 지중열교환기 용량 설계 툴 개발 ${\triangle}$기계설비배관 및 장비 단열 기준 연구 등의 기본과제와 외부기관과 공동으로 수행한 ${\triangle}$플랜트 건설현장 외국인력 고용 개선방안 ${\triangle}$기계설비건설업 관련법류 개선방안 연구를 추진했다. 본지는 연구결과에 대한 요약 보고서를 연재한다.

  • PDF

Analysis of Causes of Casualties in Jecheon Sports Center Fire - Focus on Structural Factors of Building and Equipment - (제천 스포츠센터 화재의 다수 사상자 발생원인 분석 - 건물과 설비의 구조적인 요인을 중심으로 -)

  • Lee, Eui-Pyeong
    • Fire Science and Engineering
    • /
    • v.32 no.4
    • /
    • pp.86-94
    • /
    • 2018
  • A sports center fire in Jecheon caused 29 deaths and 40 injuries. This study focused only on the structural factors of the building and equipment to investigate the causes of casualties based on the fire investigation results at the sports center. The structural factors of the building and equipment were a piloti-type parking lot, lack of a fire compartment between the piloti-type parking lot and lobby, lack of an installed sprinkler system, lack of an installed fire door in the main stairs on the $1^{st}$ floor, lack of an installed fire water tank on the rooftop, an installed pocket fire door in the main entrance on the $2^{nd}$ floor, poor fire compartments in an EPS space and a pipe pit and on each floor, a leak in the joint of a drain pipe, plywood installed in the hoistway of the freight elevator and interior wall, illegal remodeling of a closed rooftop structure, which cannot discharge smoke and heat, installed styrofoam insulation in the inside of the parking lot ceiling, an installed tempered glass window, which cannot be opened in the ladies bathroom on the $2^{nd}$ floor, and a finished dryvit exterior wall.