• Title/Summary/Keyword: 배관가압

Search Result 69, Processing Time 0.021 seconds

Investigation on Resistance to Hydrogen Embrittlement of High Nitrogen Austenitic Steels for Hydrogen Pipe by the Disc Pressure Test and the Tensile Test on Hydrogen Pre-charged Specimens (디스크 시험 및 수소처리 인장시험에 의한 수소배관용 고질소 스테인리스강의 내수소취성 평가 연구)

  • Dong-won, Shin;Min-kyung, Lee;Jeong Hwan, Kim;Ho-seong, Seo;Jae-hun, Lee
    • Journal of the Korean Institute of Gas
    • /
    • v.26 no.6
    • /
    • pp.16-23
    • /
    • 2022
  • In this study, characteristics of effect on hydrogen gas was investigated to hydrogen embrittlement by disk and tensile tests. The developed and commercial alloy was fabricated to a plate material made from an alloy ingot. The prepared materials were processed in the form of a disk to measure rupture pressure by hydrogen and helium gas at a rate of 0.1 to 1,000 bar/min. In the hydrogen pre-charged tensile test, a specimen was hydrogenated using an anode charging method, and the yield strength, ultimate tensile strength, elongation, and reduction in area rate were carried by a strain rate test. Also, the microstructure was observed to the fracture surface of the tensile test specimen. As a result, the developed materials satisfied endurable hydrogen embrittlement, and the fractured surface showed a brittleness fracture surface with a depth of several ㎛, but dimple due to ductile fracture could be observed.

Optimum Management Plan for Soil Contamination Facilities (특정토양오염관리대상시설의 최적 관리방안에 관한 연구)

  • Park, Jae-Soo;Kim, Ki-Ho;Kim, Hae-Keum;Choi, Sang-Il
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.45 no.2
    • /
    • pp.293-300
    • /
    • 2012
  • This study was to investigate the unsuitable rate of the storage facilities, the changes in corrosion process over time after installation according to the status, the time to install the facilities, years elapsed after facilities installation, inspection of methods and motivation, and so on, based on the results of the inspection at the petroleum storage facilities conducted by domestic soil-relate specialized agency to derive optimal management plans which meet the status of soil contamination facilities. The results showed that the facilities more than 5 years after the initial leak test at the time of the installation need to be inspected periodically by considering costs of leak test and remediation of polluted soil. The inspection period can be decided by cost and leak test methods showing discrepancies for the results obtained from individual test whether it was direct or indirect. To compensate these matters, we suggested that the direct inspection method on regular schedule is recommended. On the other hand, the inspection can be voluntarily completed to ease burden of the results by inspection or equivalent level to this inspection method. Also, it may need improved construction supervision and performance test system to minimize the occurrence of the nature defects in installing the facilities as well as the upgrade program for the facilities during intervals of inspection period.

Characterization of Acoustic Emission Signal for Welding Flaw and Stress Corrosion of SPPH Steels (SPPH강의 용접결함과 응력부식에 따른 음향 방출 신호의 특성)

  • Kim, Sung-Dai;Jung, Woo-Gwang;Lee, Jong-O;Jung, Yu-Jin
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.27 no.2
    • /
    • pp.97-104
    • /
    • 2007
  • An investigation has been made on the relationship between characteristics of Acoustic Emission (AE) signal in welding flaw and the stress corrosion defect in-service for the high pressure pipe steel. In order to tackle the problem of welding flaw in high pressure pipe, specimens were made by the aid of the application of both corrosion liquid usage and a quenching method after local heating. The amplitude of signal was $60{\sim}75\;dB$ in the territory which is suspected for defect, and the specimens which only have welding flaw showed gradients of 0.034, 0.034, 0.035. Moreover, there is a certain increase in gradient even though the differences are very slight. That is, corrosion specimens showed new gradients of 0.040, 0.039, 0.041 which put welding flaw and corrosion mechanism together. After pressurizing 3 minutes, AE signal has been detected from welding flaw easily in each part of the section. It is possible to predict the occurrence and also prevent the damage of stress corrosion crack which has characteristics of cleavage fracture.

An Analysis on the Effect of Pressure System Installation on the Pipeline to Identify Pressurized Water and Self-inspection Ease in Apartment Building (아파트에 설치하는 옥내소화전 압력계 설치가 배관의 가압수 식별 및 자체점검 용이성 간의 영향 분석)

  • Son, Joo-Dal;Kong, Ha-Sung
    • Journal of the Korea Safety Management & Science
    • /
    • v.22 no.1
    • /
    • pp.33-44
    • /
    • 2020
  • This study analyzed how the installation of a pressure gauge in the indoor fire hydrant of an apartment building affected identifying pressurized water in the pipe, making it easier to conduct internal inspection on the fire suppression system, and ensuring reliability of fire suppression. The following are the study's results: First, identifying pressurized water in the indoor firefighting pipe had a positive effect on the installation of a pressure gauge in the indoor fire hydrant. This implies that a higher level of identification of pressurized water in the indoor firefighting pipe had a positive impact on improving the installation and use of a pressure gauge in the indoor fire hydrant. Second, making it easier for the fire safety officer to inspect the fire suppression system had a positive effect on the installation of a pressure gauge in the indoor fire hydrant. This suggests that if it becomes easier for the apartment building's stakeholder to conduct internal inspection or the firefighting facility manager to carry out inspection on the fire suppression system, it would have a positive effect on the installation of a pressure gauge in the indoor fire hydrant. Finally, ensuring reliability in fire suppression had a positive effect on the installation of a pressure gauge in the indoor fire hydrant. This implies that if it becomes easier to identify pressurized water in the indoor firefighting pipe, for the fire safety officer to conduct internal inspection, or for the firefighting facility manager to carry out inspection in accordance with the fire suppression system's internal inspection requirements, it would increase reliability in fire suppression, making it more necessary to install a pressure gauge in the indoor fire hydrant.

An Experimental Study on Characteristics of Sprinkler Head Activation in Low Growth Rate Fire (저성장속도 화재에서의 스프링클러 헤드 동작특성에 관한 실험적 연구)

  • Choi, Yong-Seob;Yoon, Jong-Chil
    • Fire Science and Engineering
    • /
    • v.30 no.5
    • /
    • pp.26-35
    • /
    • 2016
  • Sprinkler installations shall be operated at normal operating temperature of the atmosphere as a fire sprinkler head in any facility to control and extinguish the fire when the fire initially. Recently, however, some flush type quick response automatic sprinkler heads in slow fire place is a problem that can not be normal operation are raised. In this paper, by using the experimental model of the Apartment house of Commons and Cabinet burner size bedrooms fire conditions to form a slow growth rate and can supply more than 0.2 MPa pressure is the minimum pressure that can be applied inside the pipe in the field experiment was conducted. In the majority of experiments lush type quick response automatic sprinkler heads which is used in the country it was confirmed to be incompletely opened as the Cold Soldering occur. This phenomenon is likely to fail early fire suppression and control because they can cause the spread of fire and casualties needed to complement domestic product testing and type approval standards through additional research.

Explosive Accidents and Safe Handling of an Experimental Liquid Rocket Engine Using Nitrous Oxide as Oxidizer (아산화질소를 산화제로 사용하는 실험용 액체로켓의 폭발사례 및 안전사용방안)

  • Choi, Songyi;Park, Sukyoung;Lee, Donggun;Kim, Dohun;Koo, Jaye
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.19 no.2
    • /
    • pp.46-54
    • /
    • 2015
  • Nitrous oxide is known as green and safe propellant, and can be supplied by its own vapor pressure. So, many liquid propulsion research institutes and university laboratories use nitrous oxide as oxidizer of experimental liquid rocket engine. However, the unknown explosions occurred twice during hot fire experiments using subscale ethanol/nitrous oxide thruster. In this paper, we surmised that the explosions were caused by the decomposition of nitrous oxide in the injector body and the recondensation of nitrous oxide. Improvement and the safe handling methods are suggested.

A Study on the Development of Unified Ball Valve and Polyethylene-Steel Pipe Via Virtual Manufacturing and Experimental Approach (가상생산 및 실험을 통한 폴리에틸렌관과 금속관 일체형 볼 밸브의 개발에 관한 연구)

  • Suh, Yeong-Sung;Yoo, Je-Hyuk;Ji, Min-Wuk;Song, Jeong-Hyun;Lee, Jae-Yoon
    • Journal of the Korean Institute of Gas
    • /
    • v.14 no.1
    • /
    • pp.47-54
    • /
    • 2010
  • In order to reduce the number of installation processes and the cost, a unified ball valve and polyethylene-steel pipe is proposed and tested. An integrated design approach is carried out such that a virtual manufacturing based on finite-element analysis is first performed in order to examine contact conditions under exaggerated temperature variations (${\Delta}T\;=\;60^{\circ}C$ and $-50^{\circ}C$ for summer and winter, respectively). From the final design configuration, it was predicted that the maximum contact pressures are 71 and 8.1 MPa for summer and winter, respectively, at relatively larger contact surface. Based on this observation, a prototype model is fabricated to go through an actual leakage test. The prototype pipe passed a hydrostatic strength test successfully, showing no leakage at even much higher (54 MPa) than the operational pressure (0.25 MPa).

Analysis of Source Terms at Domestic Nuclear Power Plant with CZT Semiconductor Detector (CZT 반도체 검출기를 이용한 국내 원전 내 선원항 분석)

  • Kang, Seo Kon;Kang, Hwayoon;Lee, Byoung-Il;Kim, Jeong-In
    • Journal of Radiation Protection and Research
    • /
    • v.39 no.1
    • /
    • pp.14-20
    • /
    • 2014
  • A lot of radiation exposure for radiation workers who are engaged in Nuclear Power Plants, especially PWRs, have been caused during the outage by CRUD, such as $^{58}Co$, $^{60}Co$, in Reactor Coolant System. And therefore we need to know source terms to achieve optimization of protection for the radiation workers from radiation exposure at Nuclear Power Plants efficiently. This study analyzed source terms at domestic NPPs (PWRs) nearby Steam Generator with CZT semiconductor detector using by IN-VIVO method during the outage for the first time in the country. We checked difference for the detected source terms between old and new NPP. It was performed especially to see a change of source terms by water chemistry process as well. There was not any difference by water chemistry process both NPPs. The main source terms are $^{58}Co$ and $^{60}Co$ at all NPPs. $^{59}Fe$ only appears in the new NPP. $^{137}Cs$ and $^{95}Zr$ are shown in the old NPP. The fraction of $^{58}Co/^{60}Co$ in the new NPP is higher than the old NPP for increasing the specific activity of $^{60}Co$.

Automatic Fire Extinguisher Having Flammable Pipes Inserted in a Cultural Assets Roof (가연성 파이프 시공에 의한 전통가옥지붕에 매설된 자동소화장치)

  • Cho, Taejun;Kim, Jae-Jun
    • The magazine of the Korean Society for Advanced Composite Structures
    • /
    • v.5 no.2
    • /
    • pp.26-31
    • /
    • 2014
  • This invention is purposed to provide an innovative solution for the inside of roof structures, which is cultural assets. The Asian old houses generally have several layered roofs on top of the structures. If a fire has started inside of the roof, it is hard to be extinguished before eliminating all the upper layers of the roof. This invention provides pre constructed embedded pipes, which is flammable and easy to be dissolved by the fire. The material of pipe is composed of rubbers, of which the combustion point is so low that the extinguishing of initial fire is possible without additional fire service. The inside of pipe is filled with halon gas. If the filled gas is consumed after ignited by fire, additional fire extinguishing water is supplied. If the flexible pipes are totally combusted by a big fire, the sprinkler at the end of inflexible pipe will work continuously, which is located between flexible and inflexible pipes. The extinguishing pipe network is suggested as dividing whole roof as multiple sections for a swift fire extinguishing in case of intentional or natural fire attack to our invaluable cultural assets.

  • PDF