• Title/Summary/Keyword: 방수공사

Search Result 50, Processing Time 0.024 seconds

Study on Construction-Standard-Production-Rate for Waterproof Work Based on Site Construction Status (현장시공실태에 따른 방수공사 표준품셈 개정 연구)

  • Oh, Jae-Hoon;Tae, Yong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.304-305
    • /
    • 2018
  • Development of waterproof methods and materials resulted in the huge changes in waterproof construction materials. In consequence, the construction-standard-production-rate underwent overall revision in 2018. Especially, from the development of the specification standard and construction methods, the waterproof construction which had lower applicability in the existing construction production rate was revised. The construction methods which did not have applicability were removed. In addition, as there was a material difference based on parts, the constructionstandard-production-rate was revised by distinguishing vertical part and floor. Furthermore, by suggesting more clear work extent, the practicability in creating the standard for calculation of the estimated price in the construction field will increase.

  • PDF

A Study for Analyzing Life Cycle Cost of Membrane Water-proofing of Roof - Focused on precaution for securing quality - (건축공사 옥상 도막방수 공법의 LCC 분석 - 품질확보를 위한 사전대책을 중심으로 -)

  • Bae, Jae-Wook;Shin, Seung-Moon;Kim, Sang-Gap;Koo, Choong-Wan;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.57-65
    • /
    • 2008
  • As the society is being developed, the desire about life quality is also growing. Even though the process of waterproof work has very close relation with these life quality, we always focus on management after problem than the precaution of problem. So this process has the highest rate of mengel. We develop LCC analysis model considering the precaution and try to show the necessity of the precaution by comparing and analyzing every alternative proposal during LCC. By studying of the previous work and the result of questionnaire, we deduce the problem of waterproof work in construction area. By discussion with an expert in this process and research, we make solutions about precaution and set the cost items in every alternative proposal about these solutions. We understand the effect of each elements through sensitive analysis of the cost items, and find the economically best suited solution.

Analysis of Actual Labor and Productivity for Based Work Crew Standard of Cement Liquid Watertight Construction (시멘트 액체방수 공사의 작업조 기반 품셈을 위한 생산량 및 노무량 분석)

  • Ha, Gee-Joo;Choi, Min-Kwon;Yi, Dong-Ryul;Ha, Min-Su;Ha, Jae-Hoon;Kim, Oe-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.171-174
    • /
    • 2009
  • The standard estimation system, used to estimate the predetermined cost of construction work, is measured by the standard and typical construction methods and field conditions. And the standard estimation system is applied to basic data for the measuring of construction cost, such as the consumed quantity of material, labor hours, and machinery cost. However it does not reflect sufficiently for the diversity and reality of constructions work Therefore, this study is recognized the necessity of new cost estimation models for the rational construction cost estimation. To improve estimation technique and construction ability, it was analyzed labor hours, production volume based on the work crew in construction work.

  • PDF

Study on the measurement of the cylinder lengths of an underwater robot for harbour construction using a pressure sensor (압력센서를 이용한 수중항만공사 로봇의 실린더 길이 측정에 관한 연구)

  • Kim, Chi-Hyo;Kim, Tae-Sung;Lee, Min-Ki
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2012.06a
    • /
    • pp.9-10
    • /
    • 2012
  • This paper presents an observer to measure the lengths of cylinders of an underwater robot for harbour construction using a pressure sensor. In harbour constructing, we place heavy armour stones weighing over 2~3 tons on the surface of the bank to protect it from storming wave. This work typically done by a diver is difficult and dangerous so that we have developed Stone Diver which is the underwater robot for harbour construction. The robot needs a position sensor to control the hydraulic cylinder. The position sensors mounted outside the cylinders cause poor durability in construction site where shock and dust usually occur. However, the pressure sensor mounted inside a waterproof box improves the durability. Based on the dynamic parameters and the pressures in the cylinder, the observer measures the cylinder's position. This paper presents the positional accuracy of the pressure based observer and the performance of the underwater robot to assemble the armour stones.

  • PDF

Study on the estimation of the cylinder displacement of an underwater robot for harbor construction using a pressure sensor (압력센서를 이용한 수중항만공사 로봇의 실린더 변위 추정에 관한 연구)

  • Kim, Chi-Hyo;Kim, Tae-Sung;Lee, Min-Ki
    • Journal of Navigation and Port Research
    • /
    • v.36 no.10
    • /
    • pp.865-871
    • /
    • 2012
  • This paper presents an observer to estimate the displacement of hydraulic cylinders of an underwater robot for harbour construction using a pressure sensor. In harbour constructing, we place heavy armour stones weighing over 2~3 tons on the surface of the bank to protect it from storming wave. This work typically done by a diver is difficult and dangerous so that we have developed Stone Diver which is the underwater robot for harbour construction. The robot needs a displacement sensors to control the position of hydraulic cylinders. The position sensors mounted outside the cylinders cause poor durability in construction site where shock and dust usually occur. However, the pressure sensor mounted inside a waterproof box improves the durability. Based on the dynamic parameters and the pressures in the cylinder, the observer estimates the cylinder's position. This paper presents the positional accuracy of the pressure based observer and the performance of the underwater robot to assemble the armour stones.

Improvement of existing drainage system for leakage treatment in exiting underground structures (운영중인 지하구조물의 누수처리를 위한 유도배수공법의 개선)

  • Kim, Dong-Gyou;Yim, Min-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.4
    • /
    • pp.669-683
    • /
    • 2017
  • The objective of this study is to propose a modification of the previously proposed drainage system for catching the partial leakage of underground concrete structures. Two techniques were proposed for applying the drainage system only to the leaking parts. One was for conveying leaking groundwater to the collection point in the drainage system and the other was for conveying the collected groundwater to the primary drainage system of the underground concrete structure. Four waterproofing materials for conveying leaking groundwater to the catchment point of the drainage system, Durkflex made of porous rubber material, KE-45 silicone adhesive with super strong adhesion, Hotty-gel made of polymeric materials and general silicone adhesive were evaluated for waterproofing performance. Hotty-gel only showed perfect waterproof performance and the other three waterproof materials leaked. The modified drainage system with Hotty-gel and drainage pipe with fixed saddle to convey the leaking groundwater from the catchment point to the primary drainage system were tested on the concrete retaining wall. The waterproof performance and the drainage performance were evaluated by injecting 1,000 ml of water in the back of the modified drainage system at the 7-day, 14-day, 21-day, 28-day, 2-month and 3-month. There was no problem in waterproof performance and drainage performance of the modified drainage system during 3 months. In order to evaluate the construction period and construction cost of the modified drainage system, it was compared with the existing leaching repair method in surface cleaning stage, leakage treatment stage, and protective barrier stage. Total construction period and construction cost were compared in considering the contents of work, repair material, construction equipment, working time, and total number of workers. As a result of comparing and analyzing in each construction stage, it was concluded that the modified drainage system could save construction period and construction cost compared to the existing leaching repair method.

A Study on Improvement of Modular Specifications - Focused on technical specifying method in waterproof and mechanical works - (모듈러 공사시방서 개선방안에 관한 연구 - 방수 및 기계설비공사의 기술방안 개선을 중심으로 -)

  • Yoon, Jongsik;Shin, Dongwoo;Cha, Heesung;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.33-41
    • /
    • 2017
  • A modular specification is a contract document that specifies the requirements of production, transformation and installation in a modular construction. A problem of the currently used specification is that it does not guarantee the level of performance required by the modular construction and fails to accommodate unique characteristics of each construction because it widely uses the standard specification as it is. This study proposes a specification that reflects the unique feature of modular construction in order to improve the quality of modular construction. Research focuses on the leakage in waterproof and mechanical equipment because it is the area with the highest rate of defects. This study suggests ways to improve the modular specification as follows: 1)Descriptive specifying (following MasterFormat) 2)Propose leakage verification method and test clause 3) Reflect characteristic of modular construction. Proposed modifications to modular specification are reviewed by experts for validation and their opinion verifies suggested improvements as a way to secure the quality of modular construction and to promise characteristics of the modular specification. This improvement will be used for reference when writing construction project specification, which can be an important contract document, so that it could lower occurrence rate of the modular defects.