Evaluation of the blast-restriction zone to secure tunnel lining safety (터널라이닝 안전관리를 위한 발파제한영역 평가)

  • Shin, Jong-Ho;Moon, Hoon-Ki;Choi, Kyu-Cheol;Kim, Tae-Kyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.1
    • /
    • pp.85-95
    • /
    • 2009
  • In urban areas, blast excavation adjacent to tunnels is carried out frequently. It is generally required to secure static and dynamic stability of nearby tunnel structures for any such activities. Although there is some national guidelines for static safety, there is little guides to risk zoning controling the dynamic behavior of the underground structures. In this study, impacts on the blast-induced vibration are investigated using numerical study. An attempt to define the restricted area of blast adjacent to subway tunnels was also made. Particular concerns were given to tunnel depth and ground types. By carrying out the parametric study on depth and ground patterns, the envelope of blast distance of which dynamic response on the lining is controlled under 1 cm/sec, is established. It is shown that the increase in depth has increased the required safety distance slightly until the distance of 3.5 times of the tunnel diameter. Despite small changes in safety distance, it can be generally said that the effects of depth and stiffness of the ground is not significant in controlling the particle velocity of the tunnel linings.

Analysis of the Propagation Characteristics of Blast Vibrations in Pasir Coal Mine (파시르 탄광에서의 발파진동의 전파특성 분석)

  • Choi, Byung-Hee;Ryu, Dong-Woo;SunWoo, Choon
    • Explosives and Blasting
    • /
    • v.24 no.2
    • /
    • pp.51-63
    • /
    • 2006
  • The typical blasting method adopted in Pasir Coal Mine is a surface blasting technique with a single free face. It means that there is only one free face, which is usually the ground surface. This kind of blasting method is easy to use but inevitably causes enormous ground vibrations, which, in turn, can affect the stability of the slopes comprising the various boundaries of the open pit mine. In addition, the method also has the problem of lowering the overall blast efficiency compared to other methods such as bench blasting methods or ones with more than two free faces. In this respect, a project was launched to develop a new blasting method that is suitable for both controling the ground vibration and enhancing the blast efficiency. As a part of the project, we investigated the current blasting method of the mine, and have conducted field measurements of the ground vibrations from 12 biasts. This Paper presents the details of the typical blasting pattern and the Propagation characteristics of the ground vibration from the surface blasting in the mine. Especially, various predictive equations for peak Particle velocities that can be used to estimate the ground vibration level in the mine area were derived from the regression analyses using the measured ground vibration data.

Probabilistic estimation of fully coupled blasting pressure transmitted to rock mass II - Estimation of rise time - (암반에 전달된 밀장전 발파입력의 획률론적 예측 II - 최대압력 도달시간 예측을 중심으로 -)

  • Park, Bong-Ki;Lee, In-Mo;Kim, Sang-Gyun;Lee, Sang-Don;Cho, Kook-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.1
    • /
    • pp.25-40
    • /
    • 2004
  • The supersonic shock wave generated by fully coupled explosion will change into subsonic shock wave, plastic wave, and elastic wave consecutively as the wave propagates through rock mass. While the estimation of the blast-induced peak pressure was the main aim of the companion paper, this paper will concentrate on the estimation of the rise time of blast-induced pressure. The rise time can be expressed as a function of explosive density, isentropic exponent, detonation velocity, exponential coefficient of the peak pressure attenuation, dynamic yield stress, plastic wave velocity, elastic wave velocity, rock density, Hugoniot parameters, etc. Parametric analysis was performed to pinpoint the most influential parameter that affects the rise time and it was found that rock properties are more sensitive than explosive properties. The probabilistic distribution of the rise time is evaluated by the Rosenblueth'S point estimate method from the probabilistic distributions of explosive properties and rock properties. Numerical analysis was performed to figure out the effect of rock properties and explosive properties on the uncertainty of blast-induced vibration. Uncertainty analysis showed that uncertainty of rock properties constitutes the main portion of blast-induced vibration uncertainty rather than that of explosive properties. Numerical analysis also showed that the loading rate, which is the ratio of the peak blasting pressure to the rise time, is the main influential factor on blast-induced vibration. The loading rate is again more influenced by rock properties than by explosive properties.

  • PDF

A Study on Excavation Method According to Passage under Adjacent Structure (인접구조물 하부통과에 따른 굴착공법에 대한 고찰)

  • Kim Tai-Hyun;Ko Chin-Surk;Cho Young-Dong
    • Explosives and Blasting
    • /
    • v.23 no.1
    • /
    • pp.31-39
    • /
    • 2005
  • This study is based on the reseach about conte. track$(Dugso\~wonju)$ double line electric railway tunnel. Authors conducted test blasting to examine the effect of blasting pollution. To be conducted safe and effective work by using this result studies sailable substitution excavation method. No-vibration section generates continuously the vibration of breaker working to go abreast necessarily secondary fragmentation working and according to judging that application is actually difficult in case of the condition of study site, the period of construction, the cost of construction, the efficiency of construction, pre-heavy caliber horizontally boring working + line drilling method + vibration control secondary blasting method excavation working is possible from level within blast vibration standard.

A Numerical Study on the Effective Dimension in Slot-drilling Method (슬롯드릴링공법의 유효제원에 관한 수치해석적 연구)

  • Yoon, Ji-Sun;Lee, Jee-Hoon;Son, Sung-Hoon
    • Explosives and Blasting
    • /
    • v.28 no.2
    • /
    • pp.50-58
    • /
    • 2010
  • This study explores the slot-drilling method that has not yet enough been studied in Korea and intends to provide a theoretical framework for putting the method into practice in a construction site. The possible reduction of ground vibration by implementing slot-drilling methods is addressed. Two main subjects dealt with include the variation of vibration velocity that is based on the distance between the slot-drilling and the epicenter of blasting and the analysis of appropriate effective dimension of slot-drilling width and height to control blasting vibration. This study shows that effect of vibration reduction decreases when distance of the slot-drilling and the epicenter of blasting is getting larger and also reveals that there is a correlation between the slot size and the vibration velocity at any point.

Influence of Delay Time and Priming Location on the Blast-Induced Ground Vibration (발파공 사이의 지연시차와 기폭위치가 지반진동에 미치는 영향)

  • Kang, Choo Won;Ryu, Bok Hyun;Choi, Tae Hong
    • Tunnel and Underground Space
    • /
    • v.24 no.1
    • /
    • pp.97-109
    • /
    • 2014
  • In order to identify the characteristics of the propagation depending on delay time (20, 25 ms) and priming location (top priming, middle priming, bottom priming), test blasts were carried out a total of 4 times using different spacing, burden, drilling length, charge per delay and was derived the formula to predict blast vibration. This study investigated the characteristics of vibration by analysis of the nomogram and prediction of Peak Particle Velocity (PPV) from delay time and priming location by the formula to predict ground vibration. And it analyzed the trends of vibration increase by standards charge 0.5, 1.6, 5, 15 kg. Standards charge is "Blasting design and construction guidelines to road construction" by the Ministry of Land, Infrastructure and Transport. Depending on the charge in favor of vibration control method is proposed. Thus, when the design was to be used as a variable.

Estimation of Shear Wave Velocity of Earth Dam Materials Using Artificial Blasting Vibration Test (인공발파진동실험을 이용한 흙댐 축조재료의 전단파속도 산정)

  • Ha, Ik-Soo;Kim, Nam-Ryong;Lim, Jeong-Yeul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.619-629
    • /
    • 2013
  • The objective of this study is to estimate shear wave velocity of earth dam materials using artificially generated vibration from blasting events and to verify its applicability. In this study, the artificial blasting and vibration monitoring were carried out at the site adjacent to Seongdeok dam, which is the first blasting test for an existing dam in Korea. The vibrations were induced by 4 different types of blasting with various depths of blasting boreholes and explosive charge weights. During the tests, the acceleration time histories were recorded at the bedrock adjacent to the explosion and the crest of the dam. From frequency analyses of acceleration histories measured at the crest, the fundamental frequency of the target dam could be evaluated. Numerical analyses varying shear moduli of earth fill zone were carried out using the acceleration histories measured at the bedrock as input ground motions. From the comparison between the fundamental frequencies calculated by numerical analyses and measured records, the shear wave velocities with depth, which are closely related to shear moduli, could be determined. It is found that the effect of different blasting types on shear wave velocity estimation for the target dam materials is negligible and the shear wave velocity can be consistently evaluated. Furthermore, comparing the shear wave velocity with the previous researchers' empirical relationships, the applicability of suggested method is verified. Therefore, in case that the earthquake record is not available, the shear wave velocity of earth dam materials can be reasonably evaluated if blasting vibration test is allowed at the site adjacent to the dam.

A Study on the Effect of Blasting Vibration on the road (터널발파 진동이 도로상부에 미치는 영향 분석)

  • Kim, Nagyoung
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.821-822
    • /
    • 2014
  • When performing the tunnel excavation blasting, the lower road structure can cause the damage of the structure caused by blasting vibration. In this case the existing structurel meet all of the static and the dynamic stability. But in the domestic management of building structures is presented vibration and is the only criteria, and the criteria for major civil engineering structures insufficient research situation. This study examined the influence of the road structure according to the blast vibration by utilizing the numerical analysis.

  • PDF

Analysis of Blasting Vibration at the Irregular Layered Structure Ground (불규칙한 층상구조 지반에서의 발파진동 분석)

  • Kim, Seung Hyun;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.5
    • /
    • pp.891-901
    • /
    • 2016
  • By comparing test blasting data experimented in three layered-structure polymorphic grounds to a geological profile, influence of blast vibration with respect to uncontrollable ground characteristics was analyzed. Inefficient blast have been performed without sufficient verifications or confirmations because insufficiencies with regard to experiments and data of blasting engineering on the layered structures to be irregularly repeated clinker layer consisted of volcanic clastic zones. It is difficult to quantify N values of clinkers within test blasting region because they have diverse ranges, or coverages. An absolute value of attenuation coefficient N in a field, estimated by blasting vibration predictive equation (SRSD), are lesser than criteria of a design instruction, meaning that vibrations caused by blast can spread far away, and the vibrational characteristics of blasting test No.1, indicating relatively small values, inferred by the geological profile, pressures of gas by the explosion may be lost into a widely distributed clinker layers by penetrating holes resulted from blast into vicinity of clinker layers located in bottom of soft rock layers at the moment of blast. As a result, amounts of spalling rocks are decreased by almost half. Also, ranges of primary frequencies in the fields are identified as similar to those of natural frequency of typical structures.

A Case Study on the Construction of Concrete Structures in Parallel with Tunnel Blasting (터널발파-구조물 병행시공을 위한 영향평가 연구)

  • 류창하;최병희;김양균;유정훈
    • Explosives and Blasting
    • /
    • v.21 no.4
    • /
    • pp.11-21
    • /
    • 2003
  • An experimental study was carried out in order to reduce the period and cost of construction of Missiryung tunnel, which is a relatively long one 3.6 km long. An allowable vibration level for curing concrete was established based on the extensive case studies done over the world. and assessment was performed on the possibility of constructing concrete structures like lining during tunnel blasting. Attenuation relationships were obtained by processing more than 130 measurement data from a series of tunnel blasting in the site. A Guideline for safe construction work was suggested. To verification, low small concrete blocks with a constant standoff distance were installed in the floor of the tunnel After the blocks were exposed to blast vibrations for 28 days, compressive strength tests were performed on 20 specimens taken from the blocks. It was shown that the suggested guideline was appropriate for the safe construction work at the site.