Improvement of Public Construction Delivery System & Award Method in Korea;Comparison with Cases of U.S., U.K., Japan (국내 공공공사 발주 및 낙찰제도 개선방안;미국, 영국, 일본 사례와의 비교를 중심으로)

  • Ji, Sae-Hyun;Lee, Hyun-Soo;Park, Moon-Seo;Song, Sang-Hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.367-372
    • /
    • 2006
  • Government is not only the biggest owner in public sector, but also the leader responsible for improving and fostering construction industry. Delivery systems and award methods are enacted as laws via government's strong will for construction innovation. In addition to establishing relationships between government and contractor, delivery systems and award methods affect every aspect of industry. Therefore, the government should keep trying to remove inefficiency and achieve Best Value. This paper analyzes the delivery systems and award methods of advanced countries to extract lessons for Korean industry focusing on leading parties, direction, and change in owner's awareness of their respective innovative movements for construction. The prerequisites for improvement in delivery systems and award methods are suggested as partnership between public and private sectors, consistent innovation, enhancement in efficiency, and reinforcement of owner's capability.

  • PDF

The Legal Proposal of Improvement for S/W Acquisition & Management System (S/W 발주 ${\cdot}$ 관리 감독의 개선을 위한 입법적 과제)

  • Kim, Byung-Il
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2005.05a
    • /
    • pp.451-457
    • /
    • 2005
  • 공공부문의 정보화 사업의 중요성에도 불구하고, 공공기관의 정보시스템을 효율적으로 발주 ${\cdot}$ 관리할 수 있는 체계가 정립되어 있지 못할 뿐만 아니라, 정보화사업은 계획 ${\cdot}$ 심의 ${\cdot}$ 사업기획 ${\cdot}$ 사업발주 ${\cdot}$ 사업관리 ${\cdot}$ 성과평가 동의 일련의 발주체계의 전문성 미흡으로 발주자의 사업수행상의 어려움뿐만 아니라 이를 실질적으로 수행하는 수주업체에도 커다란 영향을 미치고 있어 발주기관과 수주업체간의 절차상의 문제발생 사업결과에 대한 책임 한계 불분명 둥으로 법적인 문제가 발생되고 있다. 또한, 국가, 공공기관 등은 모든 사업의 절차가 법과 제도에 근거하여 수행되고 있는데 소프트웨어 등 지식기반사업의 경우에는 법과 제도가 사업의 특성을 반영하지 않아 S/W사업 수행에 어려움이 상존하고 있어, 기술적인 발주 ${\cdot}$ 체계 개선과 더불어 법 ${\cdot}$ 제도의 개선이 요청되고 있다.

  • PDF

A Study on Improvement of Order System for Survey Service (측량용역 발주제도 개선에 관한 연구)

  • Park, Tai-Sik;Han, Soung-Man
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2008.10a
    • /
    • pp.236-242
    • /
    • 2008
  • 설계용역과 통합하여 발주되는 측량용역의 입찰 제도를 보면 계획기관에서 설계예산서를 작성하여 해당 부처 분임경리관을 경유하여 공개경쟁입찰 또는 입찰참가자격제도(PQ) 등으로 발주하게 된다. 이 과정에서 측량용역과 설계용역을 분리하지 않고 측량용역 비를 설계용역비에 통합예산으로 발주 처리하고 있어 측량회사는 설계용역사로부터 불법으로 하도급 받고 있다. 설계용역회사는 엔지니어링등록과 측량업(공공측량)을 동시에 등록하여 용역수주를 하므로 기술력이 부족한 측량용역을 당연히 저가하도급으로 처리하는 커다란 모순이 발생하고 있다. 따라서 저가하도급으로 인한 측량성과의 부실은 건설공사의 부실시공으로 이어져 커다란 공사비손실과 안전 및 유지관리에 큰 문제점을 야기하고 있다. 이와 같은 문제점을 해결하기 위하여 본 연구에서는 측량용역 등록업체의 현황 및 현행 발주제도 방법 등의 분석을 통하여 발주제도의 개선방안을 제안하고자 한다.

  • PDF

이슈 & 이슈 - 시설공사 물품구매 발주 관행 개선

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.269
    • /
    • pp.58-63
    • /
    • 2012
  • 국민권익위원회는 지난 11월 1일 공공기관이 물품구매와 관련한 계약을 할 때 생길 수 있는 불합리한 관행을 개선하기 위해 '물품구매 계약의 합리성 제고 방안'을 마련하여 관계 부처인 기획재정부 및 행정안전부에 제도개선을 권고했다. 권익위는 '국가를 당사자로 하는 계약에 관한 법률 시행령'에 시설공사와 물품구매 등에 대한 정의 규정을 신설하는 등의 발주방식 판단기준을 마련할 것을 권고했다. 또한 시설공사를 물품제조나 구매로 발주하지 못하도록 입찰공고 시에 발주방식 준수의무를 '정부 입찰계약 집행기준'과 '지방자치단체 입찰 및 계약집행 기준'에 포함하는 방안도 제시했다. 아울러 공사나 물품, 용역 등 계약 목적이 겹치거나 혼합될 경우에는 주된 목적으로 발주방식을 결정하도록 하는 내용을 계약법에 신설하는 방안도 권고안에 포함했다. 국민권익위 관계자는 "이번 개선안이 수용되면 물품구매계약 과정에서 발생하는 불합리한 관행 및 제도가 개선되어 물품구매 계약의 합리성이 제고될 것"이라고 밝혔다.

  • PDF

Derive an Improvement Scheme through surveying the Software Company Report System in Korea (SW사업자 신고제도 실태조사를 통한 신고제도 절차 및 활용 개선방안의 도출)

  • Lim, Gyoo-Gun;Kim, Joong-Han;Kim, Hyun-Soo;Kim, Byung-Il;Yang, Kyung-Sik
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2006.05a
    • /
    • pp.111-118
    • /
    • 2006
  • 현행 소프트웨어사업자 신고제도는 그 효과성과 활용성에 여러 문제점들이 지적되고 있다. 이에 본 논문에서는 소프트웨어사업자 신고제도의 실태를 수주자와 발주자를 대상으로 조사하여 그 현황 및 문제점을 파악하고, 수/발주자의 개선의견을 통합적으로 분석하여 그 개선방안을 도출하고자 한다. 이를 통해서 단기적 개선안으로 신고제도 절차 및 활용 개선안을 제시한다.

  • PDF

A Comparative Study on Korean Compulsory Multiple Prime Contract System (건설산업 제도개선을 위한 분할·분리 발주 제도의 선진화 방안 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.184-193
    • /
    • 2013
  • Procurement System for Korean construction industry has mainly been controlled by the complicated regulatory system which has been recognized as unflexible and remotely separated from the global standard. This has been identified by many Korean construction experts as one of the main reasons that hamper the Korean construction industry becoming the global leader. One commonly discussed regulatory system is the compulsory multiple contracting system that has been enforced for a long time. According to the Korean governmental contracting law 68-3, all construction projects cannot be divided into separate contracting packages with a few exceptions. Exceptions stated in the law include construction activities related electrical, Information communication, fire-fighting, and cultural assets which all are governed by the separate laws/acts controlled by the different governmental bodies. This research is to closely investigate multiple prime contracting system that has been compulsory in Korean construction industry and to provide policy recommendations to these restrictions. Although, there has been a long history of this compulsory contracting system, this study attempted to provide objective analysis on current status of the system as well as global standard on the issue. This study suggests main considerations when considering different contracting system such as rights of owners, flexibilities of regulatory systems, and efficiencies of conducting a construction project. It is envisioned that recommendations from this study, if accepted by the regulatory bodies, would improve the Korean construction contraction system by making it more compatible with global standard. Moreover, these would help making the Korean industry more effective in terms of regulatory restrictions.

공청회

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.7 s.192
    • /
    • pp.39-43
    • /
    • 2006
  • 건설산업 선진화를 위한 건설생산체계 개선 공청회가 지난 6월 30일 국토연구원 강당에서 개최되었다. 국토연구원이 주최하고 대한건설협회, 대한설비건설협회, 대한전문건설협회가 후원한 이번 공청회는 향후 건설산업기본법의 개정(안)과 건설산업관련 제도개선에 활용 방안을 도출하기 위하여 마련된 것으로 김재영 국토연구원 선임연구위원이 주제발표를, 김수삼 한양대학교 대외협력부총장이 토론회 진행을 했으며, 최기원 삼건설비(주) 대표이사를 비롯하여 손태락 건설교통부 건설경제팀장, 김명수 가톨릭대학교 경제학과 교수, 유주현 (주)신한건설 대표, 이교선 한국건설기술연구원 수석연구위원, 이상호 한국건설산업연구원 건설정책연구실장, 천길주 현대건설(주) 상무, 황한석 (주)삼중엔지니어링 대표 등이 토론자로 참석하여 열띤 토론을 벌였다. 이날 토론회에서 대한설비건설협회 측 토론자로 나선 삼건설비(주) 최기원 대표는“겸업제한 폐지 등 기존 건설산업기본법의 틀을 근본적으로 바꾸는 것보다 현행법 내에서 제도개선 방안을 강구하는 것이 바람직하나, 정부방침에 의거 겸업제한제도를 폐지할 경우 상대적으로 약자인 설비건설업계를 위한 발주제도를 개선하는 방안 강구가 필요하다”고 강조했다. 최기원 대표는 또“기계설비공사의 경우 상호 실적을 인정해서는 안될 것이며, 실적인정과 관련한 혼선을 최소화하고 문제점 발생시 보완 및 조정을 위한 한시적 조정위원회 설치”를 제안했다. 이와 함께 건설공사 발주방식의 다양성 확보에 대한 의견으로 발주할 때 일반건설업자로 제한해서는 안되며, 다양한 공종과 업종의 건설공사는 통상적으로 전문분야 또는 업종에 따라서 분리발주를 의무화해야 한다고 강조했다. 이날 공청회에서 대한설비건설협회는 플로어 발언을 통해‘설비공사 분리발주를 원칙으로 하고 분리발주가 안될 경우 설비∙전문간의 공동도급으로 원도급시장 참여를 법적으로 보장할 것과 시공관리형 CM업을 신설하여 줄 것’을 건의했다. 건설교통부는 이날 공청회에서 논의된 방안을 중심으로 의견수렴을 거쳐 오는 12월 정기국회서 건설산업기본법을 개정하고 2007년 3월 시행령 등 정비안을 마련할 계획이다. 건교부는 또한 정비안을 바탕으로 다시 업계의 의견을 듣고 내년 상반기중 시행령 및 규칙 등을 개정한 뒤 5~6개월 유예기간을 거쳐 이르면 2008년부터 생산체계 개선방안을 시행한다는 방침이다. 본지는 이날 발표된 건설생산체계 개선방안과 대한설비건설협회의 의견을 게재한다.

  • PDF

The Problem Analysis and Improvement Plans to the Bidding System of Construction Works (건설공사 입 ${\cdot}$ 낙찰제도의 문제점 및 개선방안;대한주택공사의 발주공사를 중심으로)

  • Jeong, Jin-Pal;Park, Moon-Sun;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.704-709
    • /
    • 2007
  • The purpose of this study is to present both problems and improvement plans on the bidding system of the Korea National Housing Corporation, which orders apartment houses professionally. For data gathering, this study used data from electronic procurement system from 2001 to 2005. The research method of this study is to analyze the data categorized into four types: changes of ordering and contract price ration, the lowest-pricing bidding system, and permanent projects by grades. As a result of the analysis, the amount of ordering is biased in favor of particular level. Finally, this study present following improvement plans: 1) screening system and the lowest-pricing bidding system need to be supplemented, 2) the contract price ratio and the amount of ordering should be controlled, and 3) the improvement of PQ and the introduction of the list of Qualified companies by types need to be presented.

  • PDF

A Study on Legalization of Seperate Contracting System for Fire Facility Constructions (소방시설공사 분리발주제도 법제화 방안연구)

  • Lee, Su-Kyung;Lee, Sung-Kyu
    • Fire Science and Engineering
    • /
    • v.23 no.5
    • /
    • pp.43-49
    • /
    • 2009
  • The ultimate objective of research thesis is to introduce the 'Separate Contracting' system of fire facility construction, develop fire industries and stabilize citizen lives. And, this thesis is designed to analyze the ongoing situations of the 'Separate Contracting' system in national and international public constructions, and initiate the methods of introducing the 'Separate Contracting system' in fire facility constructions proper for Korean situations. In this regard, the research thesis studied of the property of the introduction of the 'Separate Contracting' system of fire facility constructions, through the comparative analysis on the existing 'Contract Bundling' system. And, the thesis established strategies to legalize this system and considered the revisions on the laws and items pursuant to fire facility constructions.

건설시장개방과 시장개방에 대응한 건설관련제도 개선방안

  • 대한설비공사협회
    • 월간 기계설비
    • /
    • s.66
    • /
    • pp.52-60
    • /
    • 1996
  • 우루과이라운드 협상에서 건설시장개방은 건설서비스로서 일반시장개방과 정부조달과 관련된 공공건설발주시장개방의 두 측면에서 이루어졌다. 정부는 건설시장과 함께 국내 건설관련 제도들을 계속해서 개선해 오고 있다. 제도 개선의 초점은 입찰, 면허제도 등과 같이 외국업체에 대한 영업자격부여방안이며 그밖에 감리제도 등도 부실공사방지대책과 맞물려 개선이 이루어지고 있다.

  • PDF