• Title/Summary/Keyword: 발주 역량

Search Result 63, Processing Time 0.014 seconds

A Study on Evaluation of Construction Project Owner's Organizational Competency (건설사업 발주자 조직 역량 평가에 관한 연구)

  • Lee, Si-Wook;Woo, Sung-Kwon;Kim, Ok-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.146-155
    • /
    • 2009
  • In the construction industry, success or failure depends on the capability and role of the project owner's organization, which has an effect on the peoples' lives and national finance because of a lot of involvement from the project owner. Therefore, it is required that the project owner has the sufficient capability for the success of relevant industry and the further development of whole industry. Therefore, at the viewpoint of successful accomplishment of the construction industry, systematic and in-depth research that defines and evaluates the capability of the project owner's organization is necessary. As-Is and To-Be competency can be measured by the individual areas and elements through the survey. By evaluating these capabilities simultaneously, it is possible to assume not only the project owner's organizational competency but also constant other capabilities. It is become to make plans for strengthening the capabilities and to establish the strategy, by catching which capabilities are really necessary. It will result in positive effects on improving the capabilities of the project owner's organizational competency.

A Study on Definition of Owner's Organizational Competency Factors (발주 역량 구성 요소의 정의에 관한 연구)

  • Lee, Si-Wook;Kim, Ok-Ki;Woo, Sung-Kwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.525-530
    • /
    • 2008
  • Construction industry is based on receiving an order. So, it has a special feature that market and manufacture activity is formed by a user. For this reason, it has a great influence on other industry compare construction industry with other industry. Specially when build public structure as infrastructure, importance of owner is emphasized then private construction because the primary role of owner have a great effect on national finance. Inspite of that, the importance of a faculty and role of an owner and an ordering organ, it is weak that a study about objective and meaningful evaluation of the specially, common standard and ability of public ordering organ as a major user of domestic construction industry. So, this study define the evaluation sphere and an element of an ordering ability for develop an ordering ability evaluation guide which can evaluate objective ability of an ordering organ. Apply its evaluation sphere and element, judge a standard of an owner, thought the judgement, it can judge accurately of short ability and if it can make future oriented strategy, it can elevate the efficiency of an owner organization management.

  • PDF

Evaluation of the Owners' CM Functions (건설사업관리에 대한 발주자 업무기능 역량평가)

  • Jung Youngsoo;Woo Sungkwon;Park Jiho;Kang Seunghee;Lee Younghwan;Lee Bok-Nam
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.128-136
    • /
    • 2004
  • Since the Construction Management(CM) was introduced into the Korea construction industry, the efforts for acceleration of CM adaption have been continued. The fact that an owner organization has the essential key to successful application of CM delivery method is true, but there has been no study on owner's organization. An owner should decide their organization type and measure their current needs for several different construction business functions for successful application of CM. After the needs of CM business functions are measured, the owner should reinforce their required business functions through strengthening their in-house capability or outsourcing. Thus, this paper defines four kinds of owner organization type and suggest the form for evaluation of owner's CM ability and analyze about needs of each type's CM capability through a survey.

Assessment of Owner Organization's Business Function for Successful Application of CM (발주자 유형별 CM 업무기능 특성 분석)

  • Kang Seung-Hee;Jung Young-Soo;Woo Sung-Kwon;Park Ji-Ho;Lee Young-Hwan;Lee Bok-Nam
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.388-393
    • /
    • 2003
  • Since the Construction Management(CM) was introduced into the Korea construction industry, the efforts for acceleration of CM adaption have been continued. The fact that an owner organization has the essential key to successful application of CM delivery method is true, but there has been no study on owner's organization. An owner should decide their organization type and measure their current needs of each CM business functions for successful application of CM. After the needs of CM business functions are measured, the owner should reinforce their required business functions through strengthening their in-house capability or outsourcing. Thus, this paper defines four kinds of owner organization type and suggest the form for evaluation of owner's CM ability and analyze about needs of each type's CM ability through making up question.

  • PDF

Development of the Design Management Guidelines to Enhance the Capability of Public Clients (공공 발주자 역량 향상을 위한 설계관리 지침서 및 절차서 개발)

  • Shin, Kyoo-Chul;Park, Hyung-Keun;Lee, Young-Ho;Kwak, Jun-Hwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.143-151
    • /
    • 2011
  • The process of design management by public client has not performed effectively due to lack of the formal guidelines and procedures in domestic public projects. The purpose of this research is to develop the guidelines and procedures of design management for public clients. The research methodology is to analyze current status of design management process in domestic and overseas cases and to develop the guidelines based on the administrative stages of design process along the project. The guidelines of design management developed by the design stages of pre-contract, contract, and post-contract stages to classify administrative procedures. The outcome of this research is able to be utilized by the public clients and design firms to standardize the process of design management and minimize potential risk during the process of the project.

An Analysis of Capability of CM at Risk in Major Construction Company (국내 대형건설회사의 책임형 건설사업관리 역량분석)

  • Yoo, Seung-Kyu;Choi, Seok-In;Son, Chang-Baek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.85-94
    • /
    • 2009
  • For the purpose of analysing the capability (knowledge, experience, and ability) of CM at Risk in the major construction company in korea, this study performed questionnaire survey with experts in the companies. Based on the analysis of the survey, the study was found as follows. 1) It is needed to increase the capability of preconstruction services, such as project management plan/manual, contract documents, value engineering, alternative analysis, time management, and claim. 2) Despite of gap of the capability between the present and the future CM services, the study concluded that the capability is sufficient to perform CM at Risk project in the major construction company.

Development of Management Systems based on IDEF3 Modeling to Improve Owner's Competency of Implementing Green building Certification (친환경건축물인증 발주자업무 수행역량 제고를 위한 IDEF3 모델기반 관리체계 구축)

  • Park, Kyung-Rog;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.52-62
    • /
    • 2013
  • Owners' efforts to acquire Green building certification, which started in 2002, have been rapidly increasing since 2006. The causes of the increased owners' interests are due to various incentives, legal obligation, and purpose of advertising. As project owners generally are deficient in capabilities and knowledge on how to deal with administrative works on certification, they tend to fulfill the minimum requirements for certification. However, effective administration process need capabilities of identifying individual making decision point and review information. The implementation of green building certification system is expected to provide comfort to both occupants and potential users. Furthermore it contributes to reducing energy costs throughout the phase of O&M. In addition, technology innovation in green industry can be obtained. Therefore, this study is intended to support owners in order that they can clarify certification tasks and make a rational decision-making in time. For this purpose, first of all, the major decision points were selected as the gateways of green building certification process. And then management system based on IDEF3 modeling was developed for supporting owners' decision-making performance. This management system will improve owners' overall capacity in handling all the tasks regarding the certification of Green building.

A Study on Method Activation of Construction Management through Investigation of Public Owners' Capability level (공공부문의 발주자 역량 수준 조사를 통한 건설사업관리 활성화 방안 연구)

  • Kim, Sun-Sik;Kim, Ju-Hyun;Lee, Yun-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.289-294
    • /
    • 2007
  • It has been 10 years Since December 1996 when CM method was institutionalized by Construction Industry Fundamental law. Even though construction market has been in stagnant of business activities till now, CM in Korea started to be activated by the introduction of CM method i.n public construction. In the end of 2005, the number of CM order's contract is 6.7 times , an amount of CM order's money is 9.2 times more than operation plan of CM system announced in 2001. Therefore, CM market has been dramatically growing. However, it is judged that the shortage of faith in CM project and necessity of CM method are not recognized and study on a owner who affects successful settlement of CM has not been performed. When considering those points, in introduction and practical use of CM, CM is suggested to the field which is necessary for a client through the task performance level research and analysis of a owner who act a important role to activate Construction Management. As result of studying pre-existing papers to i.nvestigate of owner's capability level, the task function of a client is classified into 10 types and a public opinion poll was performed based on the 10 types of function.

  • PDF

The Effect of Knowledge Complementarity and PMO Implementation System on Performance of IT Project (지식 상호보완성과 PMO수행체계가 IT 프로젝트 성과에 미치는 영향)

  • Kim, Choong-Nyoung;Jang, Ji-Yeon;Choi, Kyu-Jin
    • Management & Information Systems Review
    • /
    • v.37 no.4
    • /
    • pp.141-156
    • /
    • 2018
  • PMO(Project Management Office) has been considered as a general approach for the successful operation of IT project. The previous studies tended to emphasize on the roles and functions of PMO in a normative way. However, in practice, since PMO is operated as a joint structure in which client firms and professional PMOs work together, it seems to be important that the implementation system of PMO should be properly formed. In this paper, it is examined whether the competence of client firms and professional PMO influence on the setup of implementation system of PMO, and also whether implementation system of PMO influence of the performance of IT project. In addition, it is also analyzed if the competence of client firms and professional PMO influence differently on the setup of implementation system of PMO, according to the degree of knowledge complementarity. As a result of this study, it is found that the competence of client firms and professional PMO influence positively on the setup of implementation system of PMO, and governance factors such as clear definition of organizational roles, responsibility, and setup of standardized processes are also important in performance of IT project. It is also shown that, if knowledge complementarity is formed with a common knowledge base between client firms and professional PMOs, Project Management Office functions effectively. In summary, for the successful performance of IT project, it seems that it is required to approach from the view point of governance in forming the implementation system of PMO and it is also important to form knowledge complementarity between client firms and professional PMOs.