• Title/Summary/Keyword: 발주

Search Result 1,353, Processing Time 0.023 seconds

Analyzing Site Reliability for Residential, Civil and Plant Projects using Lean Construction Principles (린 건설에 기초한 국내 건설 공사의 시공 계획 신뢰도 평가 및 분석)

  • Koo, Bonsang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.655-664
    • /
    • 2008
  • Lean Construction recommends implementing site production management by measuring the reliability of daily production tasks, collecting the causes for failure of incomplete tasks, and identifying problems in the existing process based on the collected data. Although many research projects have been performed to introduce Lean Construction in Korea, there are not many cases in which day-to-day site production operations has been stringently evaluated based on such methods. This paper introduces three cases in which such techniques were implemented on a residential, civil infrastructure and plant project. On each project, process maps were created with the superintendents and daily production meetings were held for two weeks. Consequently, the average PPC for the three projects was 79% for PPC and 16% for PAT. In addition, the majority of the failures were due to 'Directive/Plan' and 'Prerequisites.' The results show that project stakeholders (owners, contractors, etc.) lack the ability to plan ahead and keep to their plans, and also lack the capability to synchronize workflow between themselves. The results also reveal that project participants need to be more proactive in solving process problems on site and also need to be better educated in Lean concepts and methodologies.

A Case Study on the Establishment of a Strategy System through the BSC of SMEs (중소기업의 BSC를 통한 전략체계 구축 사례연구)

  • Lim HeonWook;Kim WooSu
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.4
    • /
    • pp.303-308
    • /
    • 2023
  • The purpose of this study is to provide a practical guide for establishing BSC that can be practically applied by SMEs. To this end, a case study was conducted to establish a performance evaluation system through a field-required Balanced Scorecard (BSC) for company J, a tent pole manufacturer, and to provide a management strategy system map. As a survey method, the requirements of the ordering organization were organized through a comparison of the BSC-related proposal requests in the first stage. The BSC establishment method was organized through the arrangement of the second stage result report. The 3rd stage BSC derived KPI indicators for SMEs for each of the 4 perspectives. A corporate vision was derived through a 4-step SWOT analysis. A strategy map was developed through 5-step field-required KPI, weight setting, and BSC. The 6-step final strategy system was also drawn up. As a result of the study, the four perspectives of the BSC were reconstructed by department. That is, the financial (financial) perspective is from the executives' perspective, the customer's perspective is from the sales department's perspective, the internal process perspective is from the design department/production quality department's perspective, and the learning/innovation perspective is from the management department's perspective. In addition, a total of 11 CSFs and a total of 49 KPIs of J company were derived. The limitation of the study is that the final strategy system through the company's BSC has only been carried out, and it needs to be linked with the company's compensation system in the future.

Quantification of Schedule Delay Risk of Rain via Text Mining of a Construction Log (공사일지의 텍스트 마이닝을 통한 우천 공기지연 리스크 정량화)

  • Park, Jongho;Cho, Mingeon;Eom, Sae Ho;Park, Sun-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.109-117
    • /
    • 2023
  • Schedule delays present a major risk factor, as they can adversely affect construction projects, such as through increasing construction costs, claims from a client, and/or a decrease in construction quality due to trims to stages to catch up on lost time. Risk management has been conducted according to the importance and priority of schedule delay risk, but quantification of risk on the depth of schedule delay tends to be inadequate due to limitations in data collection. Therefore, this research used the BERT (Bidirectional Encoder Representations from Transformers) language model to convert the contents of aconstruction log, which comprised unstructured data, into WBS (Work Breakdown Structure)-based structured data, and to form a model of classification and quantification of risk. A process was applied to eight highway construction sites, and 75 cases of rain schedule delay risk were obtained from 8 out of 39 detailed work kinds. Through a K-S test, a significant probability distribution was derived for fourkinds of work, and the risk impact was compared. The process presented in this study can be used to derive various schedule delay risks in construction projects and to quantify their depth.

Exploring Delays of The Mega Construction Project: The Case of Korea High Speed Railway (대형 건설사업의 공기지연분석: 경부고속철도 건설사업을 중심으로)

  • Han, Seung Heon;Yun, Sung Min;Lee, Sang Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.839-848
    • /
    • 2006
  • Korea has become the 5th country to own and operate the high speed railroad in 2004. However, there were many difficulties until Koreans enjoy the first bullet train service with the average hourly speed of 300km. The high speed railroad requires elevated quality standards differently from the traditional railways. In addition to the technical difficulties, the construction project itself was an unpleasant case with huge delays and cost overruns mainly due to the lack of experiences, deficiency of owner$^{\circ}{\O}$s role, and increase of public resistances triggered by environmental concerns. This paper analyzes the reasons for delays on this mega-project. With respect to the characteristics of the whole project level, it is very complicated/linear project, whose total length is around 412 km with the composition of various sections in the route of the railway which have basically different conditions. For that reason, the analysis is performed in both macro and micro level. First, macroscopic analysis is performed to find critical subdivisions in the railway route that induces the significant delay in the opening due date. Then, microscopic analysis is followed to quantify the causes and effects of delays focused on these critical subdivisions in more detailed way. Finally, this paper provides lessons learned from this project to avoid the decisive delays in performing the similar large-scaled projects.

Structural Safety Assessment of Tie-down for Securing Helicopter (헬리콥터 고정용 안전장치 구조 안전성 평가)

  • Myung Su Yi;Kwang-Chul Seo;Joo Shin Park
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.29 no.4
    • /
    • pp.372-379
    • /
    • 2023
  • International oil prices are expected to increase from $85 a barrel this year to up to $100 a barrel in the second half of the year; this is likely to increase orders for offshore plants in the global market. One main characteristic of offshore plants is that a large helideck is located on the top side, and aluminum alloys are used as the basic material of the structure for weight reduction and corrosion resistance. Shipowners are increasing the size of helicopters to quickly evacuate lives in the event of an emergency, and the safety use load of devices that can stably secure helicopters to the deck is also required to increase. Owing to the nature of the aluminum material, the structural strength caused by welding is greatly reduced; therefore, the fixing device must be designed by embedding it in the deck and fixing it with bolts. In this study, a model applying aluminum alloy 6082-T6 was developed to develop a helicopter fastening device that can be used for large helidecks (diameter = 28 m). The developed item was verified through nonlinear structural strength calculation to satisfy the load used for the actual fastening condition. The load condition with a 45° showed a lower ultimate strength than the 90° case owing to local plastic collapse. The nonlinear structural collapse behavior showed a result similar to that of the experimental test. The main contents derived from this study are considered to be reference materials when evaluating the structural strength of similar aluminum equipment.

Analysis of productivity and efficiency for mega container ships: Case of Busan Port (초대형 컨테이너 선박의 생산성 및 효율성 분석 -부산항을 중심으로-)

  • Jong-Hoon Kim;Won-Hyeong Ryu;Shin-Woo Park;Hyung-Sik Nam
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2023.05a
    • /
    • pp.121-122
    • /
    • 2023
  • As containerized maritime transport began in earnest, the size of container ships has steadily increased, and recently, the operation of 24,000 TEU-class vessels has become regular. However, concerns about the efficiency and productivity of such mega container ships from a port operational perspective have continued to be raised. The 10th Busan International Port Conference requested an in-depth study on the trends of container ship enlargement by analyzing the order status of ultra-large container ships from major global liners. Generally, the factor that drives the upsizing of ships is the realization of economies of scale that lowers transportation costs per TEU, which leads to a higher level of cost reduction per unit transportation compared to the increase in fuel consumption due to transporting large amounts of cargo with a single ship. However, it is necessary to examine whether this trend of container vessel enlargement is feasible for port operations. To this end, this study compares and analyzes the productivity and efficeiency of different ship sizes to evaluate the effect of ship size on port operations.

  • PDF

Methods for Quantitative Disassembly and Code Establishment of CBS in BIM for Program and Payment Management (BIM의 공정과 기성 관리 적용을 위한 CBS 수량 분개 및 코드 정립 방안)

  • Hando Kim;Jeongyong Nam;Yongju Kim;Inhye Ryu
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.36 no.6
    • /
    • pp.381-389
    • /
    • 2023
  • One of the crucial components in building information modeling (BIM) is data. To systematically manage these data, various research studies have focused on the creation of object breakdown structures and property sets. Specifically, crucial data for managing programs and payments involves work breakdown structures (WBSs) and cost breakdown structures (CBSs), which are indispensable for mapping BIM objects. Achieving this requires disassembling CBS quantities based on 3D objects and WBS. However, this task is highly tedious owing to the large volume of CBS and divergent coding practices employed by different organizations. Manual processes, such as those based on Excel, become nearly impossible for such extensive tasks. In response to the challenge of computing quantities that are difficult to derive from BIM objects, this study presents methods for disassembling length-based quantities, incorporating significant portions of the bill of quantities (BOQs). The proposed approach recommends suitable CBS by leveraging the accumulated history of WBS-CBS mapping databases. Additionally, it establishes a unified CBS code, facilitating the effective operation of CBS databases.

Analysis of the ordering factors influencing the awarding price ratio of service contract in KONEPS

  • Jung-Sung Ha;Tae-Hong Choi;Wan-Sup Cho
    • Journal of the Korea Society of Computer and Information
    • /
    • v.28 no.12
    • /
    • pp.239-248
    • /
    • 2023
  • The purpose of this study is to analyze the factors for service contracts that affect the successful bid price rate, focusing on the case of the country market. In the study, ordering organizations and bidders differentiated themselves from existing studies by analyzing service contracts that affect the successful bid price rate in a wide range of country markets. Comparative analysis of the awarding price ratio for services, this work provides a comparable result to the existing results in the previous literature. The analytical model used five independent variables such as budget, contract method, the days of the public notice, the awarding method, and the lowest awarding ratio. In the survey and analysis, big data was collected using text mining for service bids for Nara Market over the past 18 years and data was analyzed in a multi-dimensional way. The results of the analysis are as follows, (1) if budget does not determine the awarding price ratio. This is not the case in small amounts. (2) The contract method affects the awarding price ratio. (3) The days of the public notice increase, the awarding price ratio decrease. (4) the awarding method affects the awarding price ratio. (5) The lowest awarding ratio determines the awarding price ratio. Based on the results of empirical analysis, policy implications were sought.

Analysis of productivity and efficiency for mega container ships: Case of Busan Port (부산항 터미널별 선박 규모에 따른 선석 생산성 및 항만 효율성 비교분석)

  • Jong-Hoon Kim;Won-Hyeong Ryu;Shin-Woo Park;Hyung-Sik Nam
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2023.11a
    • /
    • pp.72-73
    • /
    • 2023
  • As containerized maritime transport began in earnest, the size of container ships has steadily increased, and recently, the operation of 24,000 TEU-class vessels has become regular. However, concerns about the efficiency and productivity of such mega container ships from a port operational perspective have continued to be raised. The 10th Busan International Port Conference requested an in-depth study on the trends of container ship enlargement by analyzing the order status of ultra-large container ships from major global liners. Generally, the factor that drives the upsizing of ships is the realization of economies of scale that lowers transportation costs per TEU, which leads to a higher level of cost reduction per unit transportation compared to the increase in fuel consumption due to transporting large amounts of cargo with a single ship. However, it is necessary to examine whether this trend of container vessel enlargement is feasible for port operations. To this end, this study compares and analyzes the productivity and efficeiency of different ship sizes to evaluate the effect of ship size on port operations.

  • PDF

Design and Implementation of an Ethereum-Based Deliverables Management System for Public Information Software Project (이더리움 기반 공공정보 소프트웨어 사업산출물 관리 시스템 설계 및 구현)

  • Lee, Eun Ju;Kim, Jin Wook
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.11 no.6
    • /
    • pp.175-184
    • /
    • 2022
  • Blockchain is being studied in various fields such as logistics, fintech, medical care, and the public sector. In the public information software project, some deliverables are omitted because the developed deliverables and the deliverables requested by the project management methodology do not match, and an additional process is required for payment. In this paper, we propose the deliverables management system for public information software project which is configured a distributed environment using the Ethereum blockchain and which has an automatic payment system only when all deliverables are approved. This system can keep the service available in case of system failure, provide transparency and traceability of deliverables management, and can reduce conflicts between the ordering company and the contractor through automatic payment. In this system, the information of deliverables is stored in the blockchain, and the deliverables that their file name is the hash value calculated by using the version information and the hash value of the previous version deliverable, are stored in the SFTP server. Experimental results show that the hash value of the deliverables registered by the contractor is correct, the file name of the deliverables stored in the SFTP server is the same as the hash value registered in the Ethereum blockchain, and the payment is made automatically to the Ethereum address of the contractor when all deliverables are approved.