• Title/Summary/Keyword: 발주처

Search Result 98, Processing Time 0.041 seconds

Analysis of Substitutability of 2D Electronic Drawing Using the BIM Model -Focusing on the Electronic Delivery System in Road Field- (BIM 모델을 활용한 2D 전자도면 대체 가능성 분석 -도로분야 전자납품체계를 대상으로-)

  • Seo, Myoung-Bae;Ju, Ki-Beom;Kim, Nam-Gon
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.11
    • /
    • pp.441-450
    • /
    • 2013
  • With the recent increase in BIM orders in civil engineering, project owners are supplied with BIM-based products. Due to the lack of related guidelines, however, and the vague regulations on the creation and level of drawings as well as on the products list, many owners receive BIM-based products along with the existing 2D products. This can lead to task overlapping by designers or contractors and can cause the owners to have more data to maintain. If the existing 2D-based electronic supply system is changed to a BIM ordering system to reduce such a burden, it is necessary to examine the 2D products that can be extracted from or substituted for the BIM model so as to minimize the overlapping products. Therefore, in this study, BIM modeling of road construction projects whose enforcement plan by the Ministry of Land and Transportation has been completed was conducted, and based on the study results, the possibility of extracting 2D drawings from a total of 3,767 drawing items was determined. The results showed that 2,549 drawing items (67%) could be extracted as 2D drawings from the BIM model, and in particular, drawing items related to general connection work, earthwork, and amenities work could be most effectively substituted. The results of this study can be used as the base data for reducing the number of 2D drawings or substituting them in developing a BIM-based product supply system in the future.

A Study on the Improvement of Safety and Health Activities in the Construction Contractor (Public Institutions) (건설공사 발주처(공공기관) 안전보건활동 수준향상에 관한 연구)

  • Ji-Hwan Moon
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.3
    • /
    • pp.624-633
    • /
    • 2023
  • Purpose: It Vas intended to identify problems and derive improvement plans by grasping the current status of safety management of public institutions among construction Vork orders. Method: By comparing the disaster status of public institutions compared to the total construction Vork, the analysis Vas conducted based on the results of the evaluation of the level of safety activities of public institutions Vith a high disaster rate and the results of actual consulting. Result: As a result of comparing and analyzing the current status of safety management of public institutions, the current status and problems of safety management in public institutions Vith a high accident rate Vere similarly discovered. Safety management organizations, document management systems, safety management systems, and risk assessment activities are operated Vithout reflecting the size and characteristics of the organization, so improvement in the relevant field is needed. Conclusion: Safety-related professionals and organizations should be formed according to the size of construction orders, and responsibility and authority should be clearly assigned. Since risk assessment is conducted formally to prepare a safety and health ledger, it is necessary to derive risk factors to prevent safety accidents for the actual construction. It is expected that the level of safety activities can be improved if it is improved by reflecting the size and characteristics of public institutions.

기획 - 마켓팅 차원 인쇄홍보물 위상 점점 높아 진다

  • Kim, Sang-Ho
    • 프린팅코리아
    • /
    • v.8 no.8
    • /
    • pp.42-49
    • /
    • 2009
  • 인쇄물을 가장 많이 발주하는 산업부문은 출판업계라고 한다. 그 뒤를 따르고 있는 부문으로는 정부부문과 민간 및 공기업을 들 수 있다. 이 가운데 출판업계 및 정부부문의 인쇄물 발주가 비교적으로 명확한데 비해서 기업부문에서의 발주는 정확한 자료 및 통계를 찾기가 쉽지 않은 상황이다. 이는 기업에서 발주하는 인쇄물의 종류가 다양하고 부서에 따라 예산이 별도로 편성되는 경우가 많다는데서 그 이유를 찾을 수 있다. 뿐만 아니라 항목별로 다르게 편성되기 때문에 똑같은 인쇄물이고 해도 마케팅 부문으로 잡히지 않는 경우도 적지 않다. 이런 저런 어려운 요소들을 감안하고 나서 인쇄물에 관련된 예산을 추정해 본다고 해도 정확한 수치를 잡아내기란 여전히 어려운 일이 되고 있다. 각 기업들이 마케팅과 관련된 예산이다 보니 정확한 수치를 공개하는 것을 꺼리는 경우가 많고 하나의 항목으로 회계 처리되는 것이 아니기 때문이다. 그렇지만 경제의 성장과 함께 광고산업의 규모가 커지고 있으며 이에 따른 기업들의 마케팅도 활발하게 전개되면서 마케팅 도구의 하나인 인쇄홍보물의 사용도 함께 증가하는 경향을 보이고 있다. 비록 마케팅과정에서 사용되는 마케팅 도구로서의 인쇄홍보물의 파악이 어렵고, 1회적인 경우가 많기는 하지만 점차적으로 정기적인 마케팅의 하나라는 인식이 확산되면서 한 번의 인쇄물 수주가 꾸준한 거래관계로 발전하는 사례가 점자 증가하고 있다. 또한 광고 및 마케팅 부문을 대행사에 위탁하는 대기업의 물량을 수주하는 경우가 생긴다면 예상외로 우량한 거래처를 확보할 수 있다는 점이 업계의 관심을 끌기에 충분한 매력이 되고 있다. 아직까지 물량면이나 인지도면에서 상대적으로 낮게 평가되고 있지만 앞으로의 성장이 예견되고 있는 민간과 공기업 부문의 마케팅에서 인쇄홍보물이 갖고 있는 위상과 고객사들의 인식에 대해 알아본다.

  • PDF

기획특집-쓰레기 자동집하시설 시스템

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.6 s.191
    • /
    • pp.36-48
    • /
    • 2006
  • 인구증가와 급속한 산업화에 따른 대량생산, 다량소비로 인해 쓰레기의 발생량은 지속적으로 증가하고 있으며 생활수준의 향상으로 쓰레기의 질적 특성도 변화되고 있다. 정부는 분리수거로 쓰레기 감량화 유도를 위해 지난 ’95년부터 쓰레기 종량제를 전국적으로 실시하고 있으나 수거∙운반단계에서 발생하는 문제는 크게 개선되지 못하고 있다. 따라서 쓰레기 방치에 따른 악취, 미관저해 등의 환경 위생적인 측면과 교통 안전 등의 문제를 해결할 수 있는 새로운 개념의 수거∙운반방식 도입의 필요성이 대두되고 있다. 쓰레기 자동집하시설은 지하관로를 통해 쓰레기를 수거하는 방식의 최첨단 시스템으로 지상에서 쓰레기를 볼 수 없는 쾌적한 주거환경 조성 및 기존의 수거∙운반 단계의 단점을 해결한 쓰레기 수거 시스템이다. 이미 유럽 및 일본 등에서 도입되어 운영되고 있는 쓰레기 자동집하시스템은 삶의 질 향상과 함께 에서 운영비 절감 등 경제적인 면에서 우수성이 검증된 바있다. 국내에 쓰레기 자동집하시설이 도입된지 10여년이 지났으나 그동안 주상복합 및 병원, 오피스텔 등에만 적용될 정도로 시장이 매우 미미했었다. 최근들어 쾌적한 주거환경에 대한 관심이 높아짐에 따라 지자체 및 발주처가 확대적용할 예정이어서 새로운 시장으로 떠오르고 있다. 최근 토지 공사가 성남 판교 집하시설과 용인흥덕지구 집하시설 입찰에 들어갔고, 주공도 광명소하지구 집하시설을 입찰에 붙였는데 건설업계의 관심이 집중되었다. 이와 관련 본지는 쓰레기자동집하시설 도입 필요성 및 원리, 국내 적용 현황 등에 관해 자세히 알아보고, 우양기건(주)(대표 강석대)가 인천광역시 도시개발공사로부터 분리발주 받은 송도4공구 1, 2단지 쓰레기관로수송설비공사의 시공사례를 알아본다. 향후 쓰레기 관로수송설비공사는 주택 단지 형성시 반드시 필요한 공사중의 하나이며 지자체로부터 분리발주될 가능성이 높은 공사 중의 하나이므로 우리 설비건설업계가 관심을 가져야할 분야이다.

  • PDF

The suggestion of tunneling information and detail requirements for EPB shield machine design (토압식 쉴드TBM 장비설계를 위한 설계항목과 세부 요구사양의 구성에 관한 제안)

  • Kim, Ki-Hwan;Kim, Hyouk;Kim, Seong-Cheol;Kang, Si-On;Mun, Cheol-Hwa
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.6
    • /
    • pp.611-622
    • /
    • 2020
  • Recently, tunneling projects using shield TBM are increasing in Korea, but the information of client for machine design and manufacturing considering the characteristics of the tunneling phase is not formal, and it is difficult to optimized machine for suitable tunneling works. This paper suggest as for reference the required terms that can be used in Korea on the design items and detailed requirements for ordering of EPB shield TBM based on overseas case study. It would be hope that the TBM user can request the overall tunneling plan and required machine specification when ordering TBM, and the TBM supplier can design and manufacturing that is clear condition and suitable machine for the successful project, so that there are no residential civil complaints and for safe tunneling as well, shield TBM tunneling method will be activated.

Domestic and Overseas TBM Production Specification and Professional Training Program (국내외 TBM 제작 사양 및 전문인력 양성 프로그램 분석)

  • Kim, Ki-Hwan;Kim, Seong-Cheol;Kang, Si-On;Mun, Cheol-Hwa;Jeong, Yun-Young;Kim, Hyouk
    • Tunnel and Underground Space
    • /
    • v.29 no.5
    • /
    • pp.281-291
    • /
    • 2019
  • In Overseas case, most tunnels in under are or through the river are constructed with shield TBM and the manufacturer orders of related equipment suitable for the project are mode. Accordingly, the client provides the specifications required for the equipment manufacture. In addition, TBM equipment has been operated by those who have completed the expert training program, which for minimizing the risk of equipment operation in construction field corresponding to the mechanized construction. However, in Korea, such a system related to above the program and specifications has not yet been built, which is causing a lot of difficulties in construction field. Therefore, this study investigated the differences in bidding guides provided by mechanized construction in domestic and abroad, and the professional education programs for expert training being conducted from overseas. Futhermore, we will propose the guidelines of essential equipment specification contained in domestic bidding and provide the necessary manual for the professional education program for TBM as the mechanized construction method.

Guideline of Building Information Modeling(BIM) Service Application Level using Service Level Agreement(SLA) in the Procurement Phase (발주단계에서 SLA를 활용한 BIM 서비스 적용 수준에 관한 연구)

  • Kim, Ji-Yun;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.1
    • /
    • pp.83-90
    • /
    • 2017
  • Recently, BIM has been actively adopted in construction projects and industries, and also integrated with Information and Communications Technology(ICT) such as cloud computing technology, sensor technology, 3D scanning and printing technology etc. However, it is very difficult to efficiently utilize BIM services, technologies and collaborate with each other because of differences of usage and requirements of technologies. Every participant in the same construction project has their own needs, requirements and details of the model in each phase. In order to enhance utilization BIM model, BIM services and technologies required in their project have to be clearly defined in the initial stage of the project. In order to support the owner to define the BIM level, BIM service level and application technologies are identified and guidelines how to define the level and technologies for their project purpose are suggested in this study.

BIM based Construction Project Case Analysis for Facility Life Cycle Management from the Perspective of the Client (발주처 관점의 시설물 생애주기 관리를 위한 BIM 기반 건설 프로젝트 사례 분석)

  • Ham, Nam-Hyuk;Kim, Woong-Gi;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.10 no.3
    • /
    • pp.12-21
    • /
    • 2020
  • From the perspective of the client, the value of information for use in facility management is very low at the point of use. This is because the facility owner, who is a non-professional, cannot accurately request necessary information from the perspective of long-term facility life cycle management. The purpose of this study is to define the information necessary for facility management and to analyze the project operation method to procur this information to the client using BIM. To this end, this study analyzed the role of client and contractor, project delivery process, standards, and submissions in the BIM-based procurement area through USACE Air Force Hospital project case analysis. As a result of the analysis, if the client, who is the subject of facility operation, defines in advance the type and input method of necessary information in the operation stage, the client can receive the BIM optimized for operation from the contractor. The results of this study can be used to establish standards for receiving information necessary for establishment of procurement process and facility management of public institutions considering BIM introduction.

터널 콘크리트 라이닝 균열저감 방안 연구

  • Mun, Gyeong-Su;Kim, Min-Su;Park, Jun-Il
    • 한국도로학회지:도로
    • /
    • v.16 no.3
    • /
    • pp.54-63
    • /
    • 2014
  • 최근 터널에서 균열, 누수 등과 같은 현상이 많이 발생하고 있어 터널의 안정성 및 균열보수, 미관, 고객의 공용 중 심리적 불안감을 조성한다는 것을 쉽게 찾을 수 있다. 고속국도 제30호선 상주~안동간은 16개소/12km의 터널이 설계되어 있어 터널의 비중이 크다. 그러므로 본 연구에서는 터널 라이닝 균열발생 원인분석 및 기존사례 조사를 통하여 균열발생 최소화 방안을 검토 및 터널 라이닝의 유해한 균열방지를 위하여 공사관계자(발주처, 감리사, 시공사, 하도급사 등) 의견수렴을 통한 여러 가지 대책공법을 제안하였으며 제안공법의 효율성을 판단하기 위해 고속국도 제30호선 상주~안동간 제 8공구의 단촌 2터널, 단촌 3터널에 시험시공을 실시하여 각 공법별 균열율 및 시공성, 경제성을 고려하여 결과를 분석하고 최적의 공법을 파악, 전파하는데 그 목적이 있다.

  • PDF

Design and Implementation of Uppers Production Management System for Efficient Uppers production (효율적인 갑피생산을 위한 갑피생산관리시스템의 설계 및 구현)

  • 황용석;오암석
    • Proceedings of the Korea Multimedia Society Conference
    • /
    • 2002.11b
    • /
    • pp.335-338
    • /
    • 2002
  • 신발산업은 아직 표준화 되지 못한 부분이 많으며 현재 생산, 자재, 인사, 수/발주, 재고관리 등에 있어 각 회사마다 서로 다른 업무양식을 사용하고 있다. 그리고 동종 업계간에도 자료가 호환되지 못하고 있는 실정이다. 따라서 본 논문에서는 갑피생산을 위한 목록 표준화를 지원하는 시스템을 구현하였으며 특히 자재, 생산, 재고 관리를 웹 상에서도 유용하게 사용할 수 있는 생산관리 시스템을 구현하였다. 이 시스템은 ASP 기반의 신발 갑피 생산 웹솔루션으로서 거래처, 자재, 재고, 발주, 생산관리까지 일관된 관리체계를 지원해 통합정보인프라를 제공한다. 아울러 웹 기반으로 구축할 수 있도록 분산처리 구조를 가지며, 통합데이터베이스 기능을 사용하여 한번 입력된 데이터는 원하는 곳에서 반복 활용 가능 하도록 이루어져 있는 시스템으로 신발 갑피 생산 시스템에 효율성과 경쟁력을 극대화 시키는 시스템 이다.

  • PDF