• Title/Summary/Keyword: 발전 출력

Search Result 1,266, Processing Time 0.034 seconds

Simulation of an Absorption Power Cycle for Maximizing the Power Output of Low-Temperature Geothermal Power Generation (저온 지열발전의 출력 극대화를 위한 흡수식 동력 사이클의 시뮬레이션)

  • Baik, Young-Jin;Kim, Min-Sung;Chang, Ki-Chang;Lee, Young-Soo;Yoon, Hyung-Kee
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.34 no.2
    • /
    • pp.145-151
    • /
    • 2010
  • In this study, an absorption power cycle, which can be used for a low-temperature heat source driven power cycle such as geothermal power generation, was investigated and optimized in terms of power by the simulation method. A steady-state simulation model was adopted to analyze and optimize its performance. Simulations were carried out for the given heat source and sink inlet temperatures, and the given flow rates were based on the typical power plant thermal-capacitance-rate ratio. The cycle performance was evaluated for two independent variables: the ammonia fraction at the separator inlet and the maximum cycle pressure. Results showed that the absorption power cycle can generate electricity up to about 14 kW per 1 kg/s of heat source when the heat source temperature, heat sink temperature, and thermal-capacitance-rate ratio are $100^{\circ}C$, $20^{\circ}C$, and 5, respectively.

Remote Sun Tracker for Small-Sized PV Solar Unit (소형 PV 유닛올 위한 원격 태양광 트레킹 시스템)

  • Kim, Ki-Wan;Kim, Ju-Man;Kim, Yeung-In;Kim, Byoung-Chul
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.12 no.3
    • /
    • pp.222-227
    • /
    • 2011
  • 2-axis tracking solar PV system applying a fixed-type unit than in the same area as the panel's power output to more than 140% can be obtained that have been identified. However, this approach compared with fixed or 1-axis control system and control the complexity of trekking equipment power the cursor comes to a relatively small output PV unit is called. In this paper, a small PV power units as a way to improve the economics of the small output of multiple PV units in the central control unit in enclosed places an intermittent manner by a remote control for each unit of the trek at the same time to simplify the control mechanism to reduce power that will be introduced. also the construction of large-scale PV development plans in difficult environments can be utilized in a manner appropriate to introduce.

An Isolated Power System Based on Variable Speed Engine Generator with Super-capacitor (슈퍼캐패시터와 가변속 엔진발전기를 이용한 독립형 전원 시스템)

  • Lee, Joon-Hwan;Lee, Seung-Hwan;Sul, Seung-Ki
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.13 no.2
    • /
    • pp.128-134
    • /
    • 2008
  • The variable speed engine generator set is interested for an isolated power system due to reduced fuel consumption and less emission. However, because of sluggish dynamic behavior of the internal combustion engine the power quality would be degraded during the sudden load power surge, where the power required by the load is not available by the engine due to the reduced engine speed. An isolated power system based on variable speed engine with a super-capacitor bank can improve dynamic characteristics under such a sudden load change, and power quality, fuel consumption, and pollutants can be improved remarkably. Also, it is verified by the computer simulation that the inverter of 3phase-4leg is compatible to the isolated power system with unbalanced load. In this paper, the feasibility of the system has been verified based on a 26kw commercial diesel engine system.

An Experimental Study for the Performance Analysis of a Vertical-type Wind Power Generation System with a Cross-flow Wind Turbine (횡류형 터빈을 적용한 수직축 풍력발전시스템의 성능평가를 위한 실험 연구)

  • Cho, Hyun-Sung;Chung, Kwang-Seop;Kim, Chul-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.3
    • /
    • pp.1272-1278
    • /
    • 2014
  • In this experimental study for the current growing offshore wind, a wind tunnel test was conducted to examine the performance of the vertical-type cross-flow wind turbine power generation system. Due to the limited size of the test section of the wind tunnel, the inlet guide vane of the original wind power generation was scaled down to about 1/5 and the turbine impeller diameter was also reduced to 1/2 of the prototype impeller. The number of the impeller blade is another important parameter to the output power of the wind power generation system and the number was varied 8 and 16. From the analysis of the experimental result, the output brake power of the model wind turbine was measured as 278watts with the 16-blade at 12 m/s of the rated wind speed and the rated brake power of the prototype wind turbine is calculated to 3.9kW at the rated operating condition.

Estimation of Washing Duration of Desulfurized Absorber in a Heavy Oil Power Plant (중유화력발전소 탈황 흡수탑 세정시기예측)

  • Jang, Yeong Gi;Yoo, Hoseon
    • Plant Journal
    • /
    • v.12 no.1
    • /
    • pp.24-28
    • /
    • 2016
  • In desulfurization facilities of oil-fired power plant, gypsum scale is attached in the absorber inner surface as the operating time increases. For this reason, the maximum possible load of the power generation is set down, resulting in further generation stop. Cleaning of absorber for scale removal can be determined at the time of setting down of the maximum possible load. In this study, 6 weeks before the maximum possible load of the power generation was down set, at the same time and desulfurization facilities outlet $SO_2$ concentration value was more than 130ppm, absorber differential pressure exceeded $380mmH_2O$, it was confirmed to be the time that has elapsed 44 weeks after the previous absorber cleaning. Cleaning time of the absorber was predicted to be a time which has elapsed 50 weeks from the previous cleaning time.

  • PDF