• Title/Summary/Keyword: 민간 건축 CM사업

Search Result 9, Processing Time 0.018 seconds

Level of Use of Construction Management Services in Private Building Projects during Pre-construction Stages (민간 건축 CM사업 시공이전단계의 CM서비스 활용도 분석에 관한 연구)

  • Cho, Hong-Keun;Kim, Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.15-23
    • /
    • 2010
  • Construction management(CM) in the private building sector has been leading the growth of the CM market in Korea. The use of CM services during pre-construction stages has been recognized as a critical factor to succeed in construction projects. Understanding clients' needs of pre-construction CM services is important for CM fedms to strategically prepare and cope with market needs. The objective of this paper is to investigate the level of use of CM services in private building projects during pre-construction stages, and to identify key characteristics and implications. The most distinctive characteristics include the high demand and use of cost management and time management services during pre-construction stages.

A Comparative Study on the Usage Level of Construction Management Services during Pre-Construction Stages - Focused on Public and Private Building Projects - (시공이전단계 CM서비스 활용수준 비교에 관한 연구 - 공공 및 민간 건축CM사업을 중심으로-)

  • Cho, Hong-Keun;Kim, Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.112-120
    • /
    • 2011
  • Since early 2000s, the use of construction management(CM) in the public and private building sectors has rapidly grown in Korea. In addition, the use of CM services during pre-construction stages has been increasingly recognized as a critical factor to succeed in construction projects. Understanding clients' needs of pre-construction CM services is important for CM firms to strategically prepare and cope with market needs. The objective of the paper is to investigate and compare the usage level of CM services in public and private building projects during pre-construction stages, and to identify key characteristics and implications for CM firms. The paper identified that although there are some differences in CM service needs between public and private sectors, time management and cost management commonly showed the higher usage level.

Application of Selective Construction Management Services to Private Small-Medium Construction Projects (${\cdot}$ 소규모 건축공사의 선택적 건설사업관리 적용 방안)

  • Kim, Seong-Hwan;Mun, Kyung-Jick;Woo, Yu-Mi;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.305-309
    • /
    • 2006
  • Construction management system has been needed to be anchored and revitalize in these days, since it was entered into a domestic market. We could consider application of CM services as a challenge of construction project system and a way to get to an advanced nation in construction field. Application of CM services could be possible in public projects by a regime. However, in case of private construction projects, it is hard to apply it without understanding of substantial necessity and propriety. so in this study, we find a application method of CM services to private small-midium construction projects, and make CM services item table of CM services for revitalization by examining the cases that applied to in private small-medium construction projects.

  • PDF

CM Prospects and Strategies Based on Contract Statistics : 1997 through 2014 (CM산업 수주실적 분석을 통한 CM기업의 발전 방안 - 1997년 ~ 2014년 실적자료 기반 -)

  • Ha, Jiwon;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.97-107
    • /
    • 2016
  • CM services have been focused on the advancement of the CM industry and expansion to overseas market based on CM capabilities. However, there has been lack of quantitative and comprehensive research to investigate current CM trends and prospects for improving competitiveness. In this sense, the purpose of this study is to statistically analyze total of 3,453 CM service contracts over the past 18 years (between 1997 and 2014) in term of market type, contract size, owner's type, commodity type. Finding of this research reveal that 1) compared to 2005, CM market size in 2015 increased as much as 2.5 times, and that 2) domestic CM projects count for 87.5%, architectural project 88.4%, less than 1 billion won small contracts 75%, respectively. Also, recently as CM company are developing capability and competitiveness, 1) overseas CM market share has grown up to 20% among total CM contract amount, and 2) CM contracts by private owners has increased 3 times demanding the total management services based on high technical capability. Additionally, the result of this paper supports the growth path model proposed by Jung et al. (2014), where a path from Domestic Public (DP3) and Domestic Private (DC2) CM projects towards the expansion to International Private (IC5) contracts was quantitatively analyzed. Implications for other practical issues are also briefly discussed.

A Study on The Analysis of Present Condition and Problems of Construction Management Certification Qualification in Korea (국내 건설사업관리 (CM) 인증자격의 현황 및 문제점 분석에 관한 연구)

  • Yu, Hoe-Chan;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.181-184
    • /
    • 2009
  • The technical expert standing system of our construction industry is operated by the Ministry of Labor subjective national technical qualification law, as the professional engineer, architect and architect-engineer and so on. The construction management(CM) which is introduced on middle 1990 activates a building industry the condition of the essential indispensability for is becoming, is not officially recognized with is judged as the nostril people for qualification of the civil CM educational institutions ha the certification which is a each educational program and a separate way and it is the actual condition which is become accomplished, In this research, it observes the capital increase reserve problem point which is a domestic CM and the certification integration which is a report and system anger it leads and with national certified qualification it develops to present the improvement program for, it does to sleep.

  • PDF

Improvement for the Point at Issue of National Construction Management Professional Certified in Korea - in view of Compararive Analysis for CM Certification of Korea vs US - (국내 건설사업관리(CM) 인증자격의 문제점 및 개선방안 - 한국과 미국의 인증자격 비교분석을 중심으로 -)

  • Kim Chang-Gyo;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.79-86
    • /
    • 2004
  • The technical expert standing system of our const겨ction industry is operated by the Ministry of Labor subjective national technical qualification law, as the professional engineer, architect and architect-engineer and so on. The construction management(CM) which is introduced on middle 1990 activates a building industry the condition of the essential indispensability for is becoming, is not officially recognized with national qualification to be, that as pending issue it is most urgent, the specialty manpower positivity which is judged as the nostril poop]e for qualification of the civil CM educational institutions has the certification which is a each educational program and a separate way and it is the actual condition which is become accomplished. The problem when as international certification the CMAA which is only it secures a reliability certification which is a CCM and SAVE seeing in the certified which is a CVS, compares in the foreign nation and the CM certification is excessive, it does not secure a reliability and an efficient characteristic to give a confusion to the capital increase lattices which in a condition are, it is mass produced it is a point. It saw from, it observes the capital increase reserve problem point which is a domestic CM and the certification integration which is a report and system anger it leads and with national certified qualification it develops to present the improvement program for, it does to sleep.

  • PDF

The Perception Research on the Career Development of the Non-Certified Qualification Acquisitors of National Construction Management (국내 건설사업관리(CM) 민간자격 인증자들의 경력개발에 대한 인식조사)

  • Yu, Hoe-Chan;Ahn, Hyoung-Jun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.231-234
    • /
    • 2009
  • Recently, the roles of the construction engineers become more important in all phases of construction project life cycle. Construction engineers' capabilities is one of the key factors to accomplish construction project objectives. After acquiring basic Knowledge and skills in colleges, the construction engineers have opportunities to develop their abilities through continuous education provided by companies, associations, colleges, and so on. The current eduction system is not sufficient enough to assist engineers to develop their potentials. The construction professionals training system that help career development, career management, education and training is need to raise excellent engineers in a long term perspective. In order to investigate the necessity and the element in the career development support, I perfromed the perception about the career deveolopment by doning question investigation.

  • PDF

CM at Risk Case Study on Guaranteed Maximum Price Contract - Focused on Cases for USA - (책임형 CM 발주방식의 최대공사비보증계약 사례연구 - 미국 공공발주 프로젝트 사례 중심 -)

  • Jeong, Jinhak;Han, Jonghoon;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.22-30
    • /
    • 2019
  • The purpose of this study is to derive basic data of the Guaranteed Maximum Price(GMP) process and to present specimens that can be used at the time of execution of CM at Risk project in South Korea. CM at Risk project is issued in South Korea, but the actual data is lack. On the other hand, CM at Risk project is universalized and the market of the CM at Risk is steadily growing. Because of that, in this study, The United States cases was selected as a sample. GMP consists of CM's fee, CM contingency, project direct cost, project indirect cost, allowance. GMP negotiations are performed before the end of design completion, and after 3 rounds of estimation comparison, preliminary GMP is confirmed. GMP can be multiple contract and it is useful for Procurement of long lead materials and early construction. If the actual cost is lower than expected GMP, sharing of the saving is an option since the conflict of interests between the client and the contractor can occur.

A Study on the Determining Factors For Assessment Criteria of Project Performance Capability of CM(Construction Management) Considering Safety (안전을 고려한 건설사업관리용역업자(CM) 사업수행능력 평가기준 요인 도출 연구)

  • Kim, Do-Su;Kim, Baek-Joong;Shin, Yoon-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.6
    • /
    • pp.557-566
    • /
    • 2019
  • The construction industry has the most safety accidents of any of the domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening their regulations on safety management. In particular, the OSHA (Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on the client's responsibility for safety management is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.