Korean Journal of Construction Engineering and Management
/
v.11
no.5
/
pp.15-23
/
2010
Construction management(CM) in the private building sector has been leading the growth of the CM market in Korea. The use of CM services during pre-construction stages has been recognized as a critical factor to succeed in construction projects. Understanding clients' needs of pre-construction CM services is important for CM fedms to strategically prepare and cope with market needs. The objective of this paper is to investigate the level of use of CM services in private building projects during pre-construction stages, and to identify key characteristics and implications. The most distinctive characteristics include the high demand and use of cost management and time management services during pre-construction stages.
Korean Journal of Construction Engineering and Management
/
v.12
no.3
/
pp.112-120
/
2011
Since early 2000s, the use of construction management(CM) in the public and private building sectors has rapidly grown in Korea. In addition, the use of CM services during pre-construction stages has been increasingly recognized as a critical factor to succeed in construction projects. Understanding clients' needs of pre-construction CM services is important for CM firms to strategically prepare and cope with market needs. The objective of the paper is to investigate and compare the usage level of CM services in public and private building projects during pre-construction stages, and to identify key characteristics and implications for CM firms. The paper identified that although there are some differences in CM service needs between public and private sectors, time management and cost management commonly showed the higher usage level.
Kim, Seong-Hwan;Mun, Kyung-Jick;Woo, Yu-Mi;Koo, Kyo-Jin;Hyun, Chang-Taek
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.305-309
/
2006
Construction management system has been needed to be anchored and revitalize in these days, since it was entered into a domestic market. We could consider application of CM services as a challenge of construction project system and a way to get to an advanced nation in construction field. Application of CM services could be possible in public projects by a regime. However, in case of private construction projects, it is hard to apply it without understanding of substantial necessity and propriety. so in this study, we find a application method of CM services to private small-midium construction projects, and make CM services item table of CM services for revitalization by examining the cases that applied to in private small-medium construction projects.
Korean Journal of Construction Engineering and Management
/
v.17
no.5
/
pp.97-107
/
2016
CM services have been focused on the advancement of the CM industry and expansion to overseas market based on CM capabilities. However, there has been lack of quantitative and comprehensive research to investigate current CM trends and prospects for improving competitiveness. In this sense, the purpose of this study is to statistically analyze total of 3,453 CM service contracts over the past 18 years (between 1997 and 2014) in term of market type, contract size, owner's type, commodity type. Finding of this research reveal that 1) compared to 2005, CM market size in 2015 increased as much as 2.5 times, and that 2) domestic CM projects count for 87.5%, architectural project 88.4%, less than 1 billion won small contracts 75%, respectively. Also, recently as CM company are developing capability and competitiveness, 1) overseas CM market share has grown up to 20% among total CM contract amount, and 2) CM contracts by private owners has increased 3 times demanding the total management services based on high technical capability. Additionally, the result of this paper supports the growth path model proposed by Jung et al. (2014), where a path from Domestic Public (DP3) and Domestic Private (DC2) CM projects towards the expansion to International Private (IC5) contracts was quantitatively analyzed. Implications for other practical issues are also briefly discussed.
Proceedings of the Korean Institute of Building Construction Conference
/
2009.05b
/
pp.181-184
/
2009
The technical expert standing system of our construction industry is operated by the Ministry of Labor subjective national technical qualification law, as the professional engineer, architect and architect-engineer and so on. The construction management(CM) which is introduced on middle 1990 activates a building industry the condition of the essential indispensability for is becoming, is not officially recognized with is judged as the nostril people for qualification of the civil CM educational institutions ha the certification which is a each educational program and a separate way and it is the actual condition which is become accomplished, In this research, it observes the capital increase reserve problem point which is a domestic CM and the certification integration which is a report and system anger it leads and with national certified qualification it develops to present the improvement program for, it does to sleep.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.79-86
/
2004
The technical expert standing system of our const겨ction industry is operated by the Ministry of Labor subjective national technical qualification law, as the professional engineer, architect and architect-engineer and so on. The construction management(CM) which is introduced on middle 1990 activates a building industry the condition of the essential indispensability for is becoming, is not officially recognized with national qualification to be, that as pending issue it is most urgent, the specialty manpower positivity which is judged as the nostril poop]e for qualification of the civil CM educational institutions has the certification which is a each educational program and a separate way and it is the actual condition which is become accomplished. The problem when as international certification the CMAA which is only it secures a reliability certification which is a CCM and SAVE seeing in the certified which is a CVS, compares in the foreign nation and the CM certification is excessive, it does not secure a reliability and an efficient characteristic to give a confusion to the capital increase lattices which in a condition are, it is mass produced it is a point. It saw from, it observes the capital increase reserve problem point which is a domestic CM and the certification integration which is a report and system anger it leads and with national certified qualification it develops to present the improvement program for, it does to sleep.
Proceedings of the Korean Institute of Building Construction Conference
/
2009.11a
/
pp.231-234
/
2009
Recently, the roles of the construction engineers become more important in all phases of construction project life cycle. Construction engineers' capabilities is one of the key factors to accomplish construction project objectives. After acquiring basic Knowledge and skills in colleges, the construction engineers have opportunities to develop their abilities through continuous education provided by companies, associations, colleges, and so on. The current eduction system is not sufficient enough to assist engineers to develop their potentials. The construction professionals training system that help career development, career management, education and training is need to raise excellent engineers in a long term perspective. In order to investigate the necessity and the element in the career development support, I perfromed the perception about the career deveolopment by doning question investigation.
Korean Journal of Construction Engineering and Management
/
v.20
no.3
/
pp.22-30
/
2019
The purpose of this study is to derive basic data of the Guaranteed Maximum Price(GMP) process and to present specimens that can be used at the time of execution of CM at Risk project in South Korea. CM at Risk project is issued in South Korea, but the actual data is lack. On the other hand, CM at Risk project is universalized and the market of the CM at Risk is steadily growing. Because of that, in this study, The United States cases was selected as a sample. GMP consists of CM's fee, CM contingency, project direct cost, project indirect cost, allowance. GMP negotiations are performed before the end of design completion, and after 3 rounds of estimation comparison, preliminary GMP is confirmed. GMP can be multiple contract and it is useful for Procurement of long lead materials and early construction. If the actual cost is lower than expected GMP, sharing of the saving is an option since the conflict of interests between the client and the contractor can occur.
Journal of the Korea Institute of Building Construction
/
v.19
no.6
/
pp.557-566
/
2019
The construction industry has the most safety accidents of any of the domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening their regulations on safety management. In particular, the OSHA (Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on the client's responsibility for safety management is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.