• 제목/요약/키워드: 물량 정보

검색결과 246건 처리시간 0.503초

A Study On The Communication Network System Against Marine Disasters (해상재해방지를 위한 안전통신망 네트워크 구축에 관한 연구)

  • 신현식
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 한국해양정보통신학회 2004년도 춘계종합학술대회
    • /
    • pp.695-700
    • /
    • 2004
  • There have a lot of marine arrident doe to the increasing transportation by sea in accordance with economy growth. Accordingly, We are fully aware of the importance of the development of safety control system so that may prevent the sacrifice of life and disasters on the sea. The objective of this research in to investigate the more effective system by establishing the prevention of safety accident and marine information system as a national project.

  • PDF

A Study on the Automatic Recognition of AI-based Port Documents Using OCR - Based on the application of KNN algorithm- (OCR을 이용한 AI기반 항만서류 자동인식에 관한 연구 -KNN 알고리즘 적용을 중심으로-)

  • Kim, Jong-Eun
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 한국정보처리학회 2019년도 추계학술발표대회
    • /
    • pp.872-875
    • /
    • 2019
  • 우리나라의 수출입 화물 물량의 대부분은 항만을 통해 처리되고 있으며, 취급화물의 다양성과 선박의 대형화로 주변 국가들의 항만간 경쟁으로 심화되면서 항만 비용의 증가로 발생되고 있다. 이는 항만업무의 효율화와 생산성의 증가로 비용 감소효과를 바라볼 수 있는데, 4차 산업혁명의 주요 기술인 인공지능(OCR, AI알고리즘, 머신러닝, RPA등)의 기술 적용으로 개선할 수 있다. 본 연구에서는 이와 관련된 실질적 항만업무와 관련된 기술을 적용하여 업무의 효율화와 생산성 증가의 기술적 검증을 통해 항만의 경쟁력 강화와 국가 물류발전의 기술적 향상을 도모하고자 한다.

A Method for Optimized Supervised Learning in Recyclable-PET Sorting based on Vision AI (비전 인공지능 기반의 Recyclable-PET 선별에서 최적의 감독학습 기법)

  • Kim, Ji Young;Ji, Min-Gu;Jung, Joong-Eun
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 한국정보처리학회 2021년도 추계학술발표대회
    • /
    • pp.640-642
    • /
    • 2021
  • 비전 기반의 재활용-PET 선별공정에서, PET 외 물체와의 식별 성능은 물론 PET 용기 내 포함된 이물질 및 라벨, 뚜껑의 존재 여부, 색상에 대한 검출 성능은 재활용 소재 품질에 중요한 영향을 미친다. 본 연구에서는 비전 인공지능 기반의 재활용-PET 자동 선별 시스템을 제안하고, 인공지능 모델의 제작에서 감독학습의 학습 효과를 최적화하기 위한 데이터 레이블링 기법을 제안한다. 재활용대상 PET 와 이물질 파트가 포함된 용기의 컨베이어벨트 선별공정 혼입을 재현한 실험을 통해서, 재활용 소재화 물량과 순도를 최대화하기 위한 인공지능 모델 생성 방법에 대해 고찰한다.

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • 제12권5호
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

GIS Application for Planning Roadway Construction (도로 공사의 시공계획을 위한 GIS의 적용)

  • Kang Sang-Hyeok;Seo Jong-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.565-568
    • /
    • 2003
  • Roadway construction planning processes involve a large amount of information on design, construction methods, quantities, unit costs, and production rates. GIS (Geographic Information System) is a strong tool for integration and managing various types of information such as spatial and non-spatial data required for roadway construction planning. This paper proposes a GIS-based system for improving roadway construction planning with its 'Spatial Analysis' and 'Visualization' functions. The proposed system cail help construction planner make a proper decision in a unique way by integrating design information and construction information within the system and creating design element modules for space scheduling purposes in real-time with its 'Interactive Planning' function.

  • PDF

A Study on Development of BIM-based Engineering Management System for Temporary Work (BIM기반 가설공사 업무지원시스템 개발에 관한 연구)

  • Choi, Changhoon;Han, Choonghee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • 제21권1호
    • /
    • pp.61-69
    • /
    • 2020
  • As the amount of information generated in the construction project increases exponentially, design and construction review have a serious impact on the success of the site. For this reason, academic and business circles have been expanding the use of BIM at the whole life, and BIM is now accepted as one of the standards used in the construction industry. However, the BIM-based design for the temporary work is used as an aid to the 2D design because there is no specialized software and there is absolutely lack of a professional engineer. The objective of this research is to develop BIM-based temporary work support system. This system minimizes human errors in BIM-based design, quantity takeoff and inspection and shortens working hours.

A Study on the Environmental Impact Assessment for Passive Apartment based on Life Cycle Assessment (LCA에 기초한 패시브 공동주택의 친환경성 평가에 관한 연구)

  • Gong, Yu-Ri;Tae, Sung-Ho;Song, Suwon;Roh, Seung-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • 제14권6호
    • /
    • pp.537-543
    • /
    • 2014
  • As environmental matters such as Green House Effect rise, many construction industries are putting an effort on minimizing environmental impact in terms of building life cycle throughout the world. However, in South Korea, evaluating the eco-friendly building based on life cycle assessment has been facing an academic ostracism while the most studies are focusing on assessing the 6 environmental impact assessments of passive apartment based on life cycle assessment. The theoretical consideration of the life cycle assessment and environmental impact category were performed and the direction of the study was set up. Also, existing apartment and passive apartment, which had same structure and same type were chosen and building materials per unit area were compared to find out the difference environmental impact for building life cycle. As a result, passive apartment was rated as low level among the 6 environmental impacts. Also, effect of building material on passive apartment was more important than its operational stage.

생산스케쥴링에서의 시뮬레이션 응용

  • 서대석;박흥선
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 한국시뮬레이션학회 1992년도 제2회 정기총회 및 추계학술 발표회 발표논문 초록
    • /
    • pp.4-4
    • /
    • 1992
  • 본 프로젝트는 수주 오더에 대한 납기 예측과 가공사 Delivery 체계의 전반적 향상을 목적으로 하며, 이에 따른 목표로는 로트 편성의 자동화, 월간, 주간 및 일간 단위의 생산 스케쥴 자동 작성, 원자재 소요량과 재공 및 재고 예측, 설비 부하 분석, 생산 사이클 타임 분석 및 단축이다. 상기의 목표 달성을 위한 가공사 Delivery Scheduling 시스템은 계획용 로트 편성 모델, 실행용 로트 편성 모델, 그리고 가공사 생산 스케쥴 작성을 위한 Simulation 모델로 구성된다. 계획용 로트 편성 모델은 현행의 로트 편성 기준에 따라 미가공 생산의뢰서 전체 물량을 대상으로 로트를 편성하여 이 로트를 염색기에 할당하는 모델이며, 실행용 로트 편성 모델에서는 일일 원사재고, 염색기 고장 등과 같은 실제 조업여건을 고려하여, 작업지시서 발행이 가능한 생산의뢰서 물량에 대하여만 로트 편성을 행한다. 가공사 생산 스케쥴 작성을 위한 Simulation 모델은 계획용 혹은 실행용 로트 편성 모델로부터 얻어지는 로트 편성 결과 또는 로트 번호가 부여된 최종 로트 편성 결과 (재공 로트 포함)를 입력으로 하여 이들 로트가 가공사 생산공정에서 처리되는 상세한 조업을 모의 생산하는 모델이다. 본 시스템은 영업부 및 기획부와 가공부의 사용 목적에 따라 크게 두가지로 사용될 수 있다. 영업부 및 기획부에서는 계획용 로트 편성 모델과 Simulation 모델을 사용하여 수주 오더에 대한 납기 예측 및 원사 수급 계획의 작성에 의사결정 지원을 받을 수 있으며, 가공부에서는 실행용 로트 편성 모델 및 Simulation 모델을 사용하여 상세 가공사 생산 스케쥴의 작성 및 긴급 오더의 처리 등에 관한 의사결정 지원을 받을 수 있다. 본 프로젝트를 통한 효과로는 정확한 생산 스케쥴의 자동 작성 및 스케쥴 작성시간 단축, 납기 예측 및 납기 준수율 향상, 실적관리 향상, 그리고 설비 가동율 분석, 현장관리 등을 위한 기타 유용한 정보제공 등이다.

  • PDF

Modeling of Precast Concrete Shear Walls BIM Program (BIM 프로그램을 이용한 프리캐스트 콘크리트 전단벽의 모델링)

  • Mun, Ju-Hyun;Yoon, Hyun-Sub;Kim, Jong-Won;Eom, Byung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • 제22권5호
    • /
    • pp.451-462
    • /
    • 2022
  • The objective of the study is to establish a BIM modeling of precast concrete(PC) shear wall with various wall-to-base connections. The family library of PC shear wall was established in BIM program using component function in a IFC(Industry foundation classes) file format and SketchUp program. From the BIM program, the amounts of concrete, reinforcing bars and steel materials as well as the interference of arranged reinforcing bars can be accurately evaluated in the PC shear walls with spliced sleeves, bolt, or welding plate connection methods. Although the additional metallic materials such as steel plates, bolts, and nuts were used in the PC shear walls with welding plate connection method, their amounts of materials, economic efficiency, and environmental impact were similar to those with spliced sleeve connection. Consequently, the bolt or welding connection is a highly applicable method as wall-to-base connection of PC shear walls, and it was a more useful method than spliced sleeve method, particularly considering the constructability.

A Study on the Automated Estimating System using BIM based Library (BIM 기반 토목 라이브러리를 통한 견적자동화시스템에 관한 연구)

  • Han, Jung-Hoon;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • 제1권2호
    • /
    • pp.12-18
    • /
    • 2011
  • The BIM techniques which manages information over the life cycle of construction project based on the 3-dimensional model are developing in the direction of integrated construction management including planning, design, analysis, estimation, 3D simulation and so on. The estimation model based on the BIM has different detail level and model information. In this study, the LOD of estimation model is catched for the bridge structures. The library classes are defined with construction information classification system, and the quantities of resources are calculated by class parameter using Microstation API. Finally, the automated estimation system using BIM based library is verified by the integrated model for adjustments of level of detail.