Browse > Article
http://dx.doi.org/10.5345/JKIBC.2022.22.5.451

Modeling of Precast Concrete Shear Walls BIM Program  

Mun, Ju-Hyun (Department of Architectural Engineering, Kyonggi University)
Yoon, Hyun-Sub (Department of Architectural Engineering, Kyonggi University)
Kim, Jong-Won (Department of Architectural Engineering, Graduate School, Kyonggi University)
Eom, Byung-Ho (CBT Solutions)
Publication Information
Journal of the Korea Institute of Building Construction / v.22, no.5, 2022 , pp. 451-462 More about this Journal
Abstract
The objective of the study is to establish a BIM modeling of precast concrete(PC) shear wall with various wall-to-base connections. The family library of PC shear wall was established in BIM program using component function in a IFC(Industry foundation classes) file format and SketchUp program. From the BIM program, the amounts of concrete, reinforcing bars and steel materials as well as the interference of arranged reinforcing bars can be accurately evaluated in the PC shear walls with spliced sleeves, bolt, or welding plate connection methods. Although the additional metallic materials such as steel plates, bolts, and nuts were used in the PC shear walls with welding plate connection method, their amounts of materials, economic efficiency, and environmental impact were similar to those with spliced sleeve connection. Consequently, the bolt or welding connection is a highly applicable method as wall-to-base connection of PC shear walls, and it was a more useful method than spliced sleeve method, particularly considering the constructability.
Keywords
building information modeling; precast concrete; shear wall; economic evaluation; life cycle assessment;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Choi BG. A study of the use of computer softwares in architectural design field. The Regional Association of Architecture Institute of Korea Annual Conference; 2012; Gwangju, Korea. Busan (Korea): The Regional Association of Architecture Institute of Korea; 2012. p. 7-8.
2 Yoo JE, Lee CS. Comparison of quantity take-off based on BIM and 2D. KICEM Annual Conference of Undergraduate. 2015 Nov 7; Suwon, Korea. Seoul (Korea): Korea Institute of Construction Engineering and Management; 2015. p. 127-30.
3 Kim SA, Park G, Song BS, Choi CH, Chin SY. A study on setting up work conditions for improving productivity of BIM-based cost estimation. Korea Journal of Construction Engineering and Management. 2016 Jan;17(1):56-65. https://doi.org/10.6106/KJCEM.2016.17.1.056   DOI
4 Oh EJ. A study on the application and a plan to improvement if estimated in construction [masters Thesis]. Dong-A University; 2000. 48 p.
5 Kim MG, Um DY. 3D architecture modeling and quantity estimation using SketchUp. Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology. 2017 Jun;7(6):701-8. http://dx.doi.org/10.14257/ajmahs.2017.06.90   DOI
6 Christenson M. Capabilities and limitations of autodesk revit in a construction technology course. Building Technology Educators' Symposium Proceedings. 2006 Aug; Maryland, US. University of Maryland (US): lulu.com; 2006. p. 55-62.
7 Korea Environmental Industry and Technology Institute. Seoul, Korea. Ministry of Environment. 2017 - [cited 2017 Jun 28]. Available from: http://www.epd.or.kr/lci/lci_db.asp
8 Kim CS. A study on the modeling method for material take-off of bim based framework [Masters Thesis]. [Jinju (Korea)]: Gyeongsang National University; 2011. 59 p.
9 Yoon MC. A BIM-based architectural model advantage of the estimate model process, automation in construction. Journal of the Architectural Institute of Korea Planning & Design. 2013 Sep;29(9):95-102. https://doi.org/10.5659/JAIK_PD.2013.29.9.95   DOI
10 Yang KH, Mun JH, Oh NK. Flexural behavior of precast lightweight aggregate concrete shear walls with different wall-to-base connections. Journal of Structural Engineering. 2022 Jan;148(1):1943. https://doi.org/10.1061/(ASCE)ST.1943-541X.0003221   DOI
11 Yoon JD, Cho HS, Lee JH, Kim ES. A comparison of quantity take-offs of RC stuctures based on BIM. Journal of the Computational Structural Engineering Institute of Korea. 2020 Feb;33(1):35-44. https://doi.org/10.7734/COSEIK.2020.33.1.35   DOI
12 Yang KH, Seo EA, Jung YB, Tae SH. Effect of ground granulated blast-furnace slag on life-cycle environmental impact of concrete. Journal of the Korea Concrete Institute. 2014 Feb;26(1):13-21. https://doi.org/10.4334/JKCI.2014.26.1.013   DOI
13 Onur AZ, Nouban F. BIM Software in Architectural Modelling. International Journal of Innovative Technology and Exploring Engineering (IJITEE). 2019 Sep;8(11):2089-93. https://doi.org/10.35940/ijitee.K1968.0981119   DOI
14 Yen YN, Weng KH, Huang HY. Study on information management for the conservation of traditional chinese architectural heritage-3D modelling and metadata representation. ISPRS Annals of Photogrammetry, Remote Sensing and Spatial Information Sciences. 2013 Jul;5(W1):331-6. https://doi.org/10.5194/isprsannals-II-5-W1-331-2013   DOI
15 ISO 14044:2006 Environmental management-life cycle assessment-requirements and guidelines. Geneva, Switzerland. ISO/TC 207/SC 5. 2006 - [cited 2022 Jan 28]. Available from: https://www.iso.org/standard/38498.html
16 Choi BS, Yoon HS, Moon HK, Yang KH. Environmental impact assessment of lightweight aggregate concrete according to replacement ratio of artificial lightweight fine aggregates. Journal of the Korea Concrete Institute. 2018 Jun;30(3):297-304. https://doi.org/10.4334/JKCI.2018.30.3.297   DOI