Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.15
no.1
/
pp.75-80
/
1997
In other to construct a subway, we have to consider the position of the subway and acquisition of a topography, profile-map, cross-map, underground facilities map. All information of underground is demanded accurate location in other to prevent of accident of underground in subway construction. We must think about water lines, sewer lines, electronic lines, telephone lines, all urban gas-line because these are needed construction the subway. And attributes of underground facilities recorded on topography are characteristics. length, width. number, position, and depth of the lines. We have to record these attributes because these are very important to design map on subway construction. If we develop GIS (Geographic Information System) to use the exact in-formation of the underground facilities, we can be management safely and prevent very dangerous accident as fast as possible. In this study, attribute informations are linked geographic informations about underground facilities and we can develop Underground Facilities Management System(UFMS) to analysis dangerous region through dangerous degreed and predict accident range with these informations.
Journal of the Earthquake Engineering Society of Korea
/
v.10
no.4
s.50
/
pp.15-24
/
2006
This work reports the results of our study on the dynamic response of various buried pipelines depending on their boundary conditions. We have studied behavior of the buried pipelines both along the axial and the transverse direction. The buried pipelines are modeled as beams on elastic foundation while the seismic wave as a ground displacement in the form of a sinusoidal wave. The natural frequency, its mode, and the effect of parameters have been interpreted in terms of free vibration. In order to investigate the response on the ground wave, the resulting frequency and the mode shape obtained from the free vibration have been utilized to derive the mathematical formula for the forced vibration. The natural frequency varies most significantly by the soil stiffness and the length of the buried pipelines in the case of free vibration. The effects of the propagation direction and velocity and the frequency of ground wave on the dynamic responses of concrete, steel, and FRP pipes have been analyzed and then dynamic responses depending on the type of pipes have been compared. Through performing dynamic analyser for various boundary conditions and estimation of the location of maximum strain has been estimated for the type of pipes and boundary conditions.
Korean Journal of Air-Conditioning and Refrigeration Engineering
/
v.26
no.12
/
pp.553-558
/
2014
Geothermal energy can be used with a geothermal heat pump or an earth-to-air heat exchange system (EAHES), which is referred to as a "cooling tube" in Korea. In this study, we suggest EAHES burial guidelines in terms of the parameters of buried pipe length and air velocity regarding the exit air temperature of EAHES. The exit air temperature for EAHES in three regions (Changwon, Busan and Seoul) was calculated with variation in buried pipe length and air velocity at ${\Phi}100mm$ and ${\Phi}200mm$. In conclusion, variation in the buried pipe length is more effective than that of air velocity to achieve the required exit air temperature.
Kim, Mi-Seung;Won, Jong-Hwa;Kim, Moon-Kyum;Kim, Jeong-Soo
Journal of the Korean Institute of Gas
/
v.13
no.2
/
pp.30-35
/
2009
The result of this research explains an interactive behavior of buried steel pipe located below hume pipe using concept of effective depth and effective length against their intersection angle and burial distance. The cover depth of upper rigid (hume) pipe is 1.0m and depth range of flexible (steel) pipe is 0.5m to 5m from beneath bottom of hume pipe. And one more variable is their intersection angle in this study, it was considered from $0^{\circ}$ to $90^{\circ}$. From the results of this study, the effective depth is proportionally increasing with its intersection angle and decreasing with distance increment between two pipes. Finally, the relationship between effective length and summation of occurred bending stress is defined.
This work reports results of our study on the dynamic response of buried pipelines depending on their boundary conditions. We have studied behavior of the buried pipelines both along the axial and the transverse direction with a boundary condition of free ends. The buried pipelines are modeled as beams on elastic foundation while the seismic wave as a ground displacement in the form of a sinusoidal wave. The natural frequency, its mode, and the effect of parameters have been interpreted in terms of the free vibration. In order to investigate the response on the earthquake, the resulting frequency and the mode shape obtained from the free vibration have been utilized to derive the mathematical formula for the farced vibration. We have also completed the computer program to simulate the time-displacement graphs of the pipe lines with free ends for both cases of vibrations.
Proceedings of the Korean Institute of Surface Engineering Conference
/
1999.05a
/
pp.38-38
/
1999
매설배관은 도로 혹은 철길올 횡단하는 경우와 같이 굴착에 의한 시공이 불가능한 경우에 압업관을 사용하여 시공하며 이러한 압업관은 배관이 토양의 하중으로부터 안 전하게 유지되도록 하는 기능도 한다. 압엽관은 배관과 접촉이 되지 않도록 절연체 를 배관과의 사이에 삽업올 하도록 규정되어 있는데 여러 가지 이유로 배관과 접촉이 되기도 한디 배관과 압업관이 전기적으로 접촉되면 배관을 방식하기 위한 방식전류 를 압입관에 빼앗기게 되고 압업관 내부의 배관은 비방식 상태에 놓이게 되어 부석이 일어날 가능성이 높다. 본 연구는 실제 매설배관 현장에서 배관과 압입관의 접촉여부 에 대하여 조사한 방법 및 결과에 대한 것이다. 본 연구에서는 압업관의 접촉여부를 확인하기 위하여 다음과 같은 방법을 사용하 였다. 첫째. 배관과 압입관의 방식선위를 단순하게 측정하는 것이다. 배관과 압업관 의 전위가 같은가 다른가를 측정하는 방법이다. 둘째, 배관의 방식전류를 on, off하면서 배관과 압입판의 전위거동을 살펴보는 것이다. 셋째, 배관과 압업관을 언위적으로 접촉시켜 흐르는 전류량을 확인함으로써 접촉여부를 확인할 수 있었다. 넷째 배관을 따라 흐르는 방삭전류량을 측정하였다. 이상과 같은 방법을 사용하여 배판과 접촉된 압압관을 확인할 수 있었다. 접촉된 압입관에서 접촉지점을 확인하기 위하여 배관과 압입관 사이에 전류를 인가하고 압입 관의 양단의 배판 사이의 전위 변화를 측정하여 그 전위변화값과 인가한 전류값을 통 하여 계산된 저항올 배관의 길이로 환산하여 대략적인 접촉지점을 확인할 수 있었다.
This work reports results of our study on the dynamic responses of the buried pipelines both along the axial and the transverse directions under various boundary end conditions. In order to investigate the effect of the boundary end conditions for the dynamic responses of the buried pipeline, we have devised a computer program to find the solutions of the formulae on the dynamic responses (displacements, axial strains, and bending strains) under the various boundary end conditions considered in this study, The dynamic behavior of the buried pipelines for the forced vibration is found to exhibit two different forms, a transient response and a steady state response, depending on the time before and after the transfer of a seismic wave on the end of the buried pipeline. We have observed a resonance when the mode wavelength matches the wavelength of the seismic wave, where the mode number(k) of resonance f3r the axial direction. On the other hand, we have not been able to observe a resonance in the analysis of the transverse direction, because the dynamic responses are found to vanish after the seventh mode. From the results of the dynamic responses at many points of the pipeline, we have found that the responses appeared to be dependent critically on the boundary end conditions. Such effects are found to be most prominent especially for the maximum values of the displacement, the strain and its position.
This study presents the behavior characteristics of buried three-layered pipeline subjected to pile driving loads corresponding to its cover depth. The analysis considered the driving energy caused by 7 tonf of ram weight and 1.2m of stroke with 20m distance from buried pipeline for all the analysis cases. A cover depth of pipe is varied 0.6m to 3.8m for this research. Vibration Velocity and stress are investigated at the center section in longitudinal direction. With same distance from pile, attenuation ratio of vibration velocity for increment of cover depth has shown an increasing trend. Also, Stress attenuation ratio of inner pipe is increased with cover depth.
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.29
no.1
/
pp.61-67
/
2018
The effects of subsurface inhomogeneities on the detection of buried metal pipes in ground-penetrating radar(GPR) signals are investigated numerically. To model the electrical properties of the subsurface inhomogeneities, the continuous random media(CRM) generation technique is introduced. For the electromagnetic simulation of GPR signals, the finite-difference time-domain(FDTD) method is implemented. As a function of the standard deviation and the correlation length of the relative permittivity distribution for a randomly inhomogeneous ground, the GPR signals of the buried metal pipes are compared using numerical simulations. As the subsurface inhomogeneities increase, the GPR signals of the buried pipes are distorted because of the effect of the subsurface clutter.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.