• Title/Summary/Keyword: 리스크 중요도

Search Result 251, Processing Time 0.022 seconds

Evaluation of Tension of PSC Box Girder Bridges Using Risk Matrix (리스크 매트릭스를 활용한 PSC박스 거더교의 긴장재 평가)

  • Kim, Hyungjo;Ji, Seunggu;Kim, Hunkyom;Kim, Pilsoo;Kim, Hunkyom;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.53-60
    • /
    • 2018
  • In particular, the investigation of tendons in PSC Box Girder Bridge should be done in a systematic way. It is important to identify preventative maintenance activities that should be carried out in order to analyze the risk factors by type of representative tensions and to reduce risks in the long term. However, in the current maintenance system, various methodologies for investigating and repairing tensions have been studied, but it is difficult to investigate precisely tensions. Therefore, to apply the risk assessment for screening of tensions to the domestic PSC Box Bridge, we presented a risk matrix evaluation index that is consistent with the state assessment and maintenance system.

Standard Work Process to Reduce a Risk of Track Exchange Work for Railroad (철도 운행선 변경작업의 리스크 저감을 위한 표준작업 프로세스 도출)

  • Yoon, Chang Geun;Park, Su Yeul;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.131-137
    • /
    • 2021
  • Since many resources are put into the work of changing the railway operation within limited time, it is important to have a specific work plan and safety management. For this reason, the work schedule is shared in advance, and parallel work is being carried out simultaneously by rail system, such as tracks, trolly wires, and signals. However, due to the nature of the transfer work, the work is carried out at night when the railway operation is finished, and many resources are put into the limited area of the operating line, so the risk of safety accidents and failure to change the operating line is recognized as high. Nevertheless, there is still not enough research done in korea regarding the operation line change construction. Therefore, this study is conducted a survey on the track exchange work of railroad for working people, and analyzed the results of the survey. Finally, a standard work process was suggested to reduce the risk of track exchange work.

Risk Factor Analysis of Penetrating Fragile States' Construction Market : Focusing on the North Korean Case (취약국가(Fragile State) 건설시장 진입 시 리스크 대응을 위한 요인분석 : 북한 사례를 중심으로)

  • Hong, Eunbin;Yi, June-Seong;Son, JeongWook;Jang, YeEun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.5
    • /
    • pp.17-28
    • /
    • 2021
  • The construction industry has challenges and opportunities for Sustainable Development Goals (SDGs). The task of the construction industry is to improve the quality of construction, which is particularly necessary for the Fragile State. The construction industry's primary role is to provide jobs and maintain and improve the construction environment that affects the quality of life. Using the Delphi method and EFA in this study, [Pre-Execution] and [Execution] were derived as risk areas that require intensive hedge when penetrating the construction market in fragile states. It was concluded that the risk hedge to the master plan for the business conditions and infrastructure is the most important.

Modeling of Real-time Concrete Compressive Strength Reduction Management System According to Water Reducing Ratio (감수율에 따른 실시간 콘크리트 압축강도 저하 관리시스템 모델링)

  • Kim, Joon-Yong
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2022.07a
    • /
    • pp.107-109
    • /
    • 2022
  • 본 논문은 건설구조물 안전의 가장 중요한 요소 중 하나인 콘크리트 압축강도 안정성을 확보하기 위한 시스템으로, 콘크리트 구조물을 만들 재료인 레미콘의 수분 감소율에 따른 압축강도 감소 리스크를 관리할 수 있는 모델을 제시하였다. 동일한 물,시멘트비(W/C)로 생산된 레미콘은 현장타설시까지 교통환경으로 인한 도착시간 지연 및 강우, 강설 등 외부적인 요건으로 감수율이 발생하는 리스크가 발생한다. 이로 인해 콘크리트의 압축강도가 저감하는 중대한 문제가 발생한다. 본 연구에서 제시한 알고리즘을 이용하여 현장 타설전 콘크리트 시료의 함수율을 측정하여 감수율이 발생한 제품 발견시, 실시간으로 Operator로 GCM 기반의 Push Alarm을 전송하여 감수율이 반영된 제품을 제공함으로써 구조물의 안전성을 확보할 수 있는 시스템을 모델링하였다. 본 연구는 기존시스템의 문제점을 실시간으로 개선할 수 있는 것으로 건설현장의 구조물 안정성 확보에 효과가 클 것으로 기대된다.

  • PDF

A Study on the Establishment of Industrial Security Education Programs in Korea (한국 산업보안교육 프로그램의 정립에 관한 연구)

  • Choi, Sun-Tae;Yu, Hyeong-Chang
    • Korean Security Journal
    • /
    • no.25
    • /
    • pp.185-208
    • /
    • 2010
  • This study is to suggest the current security education programs and improvement of industrial security curriculums in Korea. We live in a world of insecurity; the world is changing at an ever accelerating pace. Life, society, economics, international relations, and security risk are becoming more and more complex. The nature of work, travel, recreation, and communication is radically changing. We live in a world where, seemingly with each passing year, the past is less and less's guide to the future. Security is involved in on one way or another in virtually every decision we make and every activity we undertake. The global environment has never been more volatile, and societal expectations for industrial security and increasing if anything. The complexities of globalization, public expectation, regulatory requirements, transnational issues, jurisdictional risks, crime, terrorism, advances in information technology, cyber attacks, and pandemics have created a security risk environment that has never been more challenging. We had to educate industrial security professional to cope with new security risk. But, how relevant is a college education to the security professional? A college degree will not guarantee a job or advancement opportunities. But, with a college and professional training, a person has improved chances for obtaining a favored position. Commonly, Security education and experience are top considerations to find a job so far, also training is important. Today, Security is good source to gain competitive advantage in global business. The future of security education is prospect when one considers the growth evident in the field. Modern people are very security-conscious today, so now we had to set up close relevant industrial security programs to cope with new security risk being offered in colleges or several security professional educational courses.

  • PDF

A Study for New Paradigm Settlement on Business Security Management: Focus on Global Business (산업보안관리에 관한 뉴패러다임의 정립: 글로벌 비즈니스를 중심으로)

  • Yu, Hyung-Chang
    • Korean Security Journal
    • /
    • no.39
    • /
    • pp.355-386
    • /
    • 2014
  • Current business environment asks the fundamental changes about business security. The essences of these changes are that the security management of today's global business is important task of managers and the security practitioner is professional who needs very specialized education and training with business thinking. Rapid process of globalization of global village tore down the business limit that was restricted on the geological areas' limitation. Rapid business environments' change that is driving depends on development of science and technology with globalization needs new paradigm to keep business continuity. With the process of globalization, Korea, which importance is gradually increasing in the national economy, has trade dependent economic system, which keeps power of national economy through trade, so Korean economic tendency is accelerating. To keep competitiveness in global market, new strategy that is different with existing domestic business management is necessary. That is, capacity of coping with outside risk in domestic business management is established in some degree, but business activities in foreign countries faces at numerous unexpected risks that differ from country to country such as difference with the custom, changes of corporate governance etc. To cope with these new risks effectively, new paradigm for business risk is necessary. Especially, flexibility of thinking like new paradigm is necessary to cope with new security risk effectively. To cope with security risk that occurs in the new business environment effectively and competes against international company in global market, company management and members' changes of cognition about security and innovative changes in security policy is necessary. In the basement of these changes, there is expansion of business security tasks, improvement of report line, enhancement of professionalism and status of security officers, variation of hands-on workers and increasing of investment to the security etc.

  • PDF

Risk Assessment Model for the Delay Protocol in the Conditions of Contract of International Construction Projects (해외 건설공사 공기지연사건의 합리적 대응을 위한 계약조건 리스크 평가 방법)

  • Lee, Hwangku;Shin, Dongwoo;Kim, Kyungrai;Cha, Heesung;Kim, Youngjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.65-77
    • /
    • 2017
  • Recently, many Korean major construction companies are suffering from profit loss mainly due to a direct impact from delays in their overseas projects. In general, changes are inevitable in a large-scale project, and most of changes are directly linked to construction delay. Therefore, in the event that an extension of time is necessary due to a change, the contractor must manage the delay based on the condition of the contract to effectively manage risks from delay to the completion date. Thus it is important to understand delay protocol defined in the condition of the contract early in the project, but there have been few or no study to propose methodology or tool to support this effort. This paper presents a review on the project planning and controling practices of major Korean construction companies along with the issues on delay claims and disputes in mega-international projects and suggests a tool to assess delay risk in the condition of the contract. To propose a delay risk assessment model for international construction projects, major standard conditions of contract have been reviewed including FIDIC Red Book(1999), PSSCOC(2014) and SIA 9th Edition(2010). To reflect recent trend of major international owners, standard conditions which they are utilizing for their projects also have been reviewed including those of ARAMCO and QP. The model provides a categories of risks to be reviewed on the condition of the contract along with standard level of the risk which is common in the international standard form of the contracts. This study also performed a case study on an actual international project to confirm the effectiveness of proposed model to identify and respond to a delay risk of a project.

Improvement of the Evaluation Method for VE Alternatives using the Risk Assessment Process (리스크 평가절차 도입을 통한 VE 대안 평가방법 개선)

  • Park, Jin-Ho;Jin, Zheng-xun;Hyun, Chang-taek;Kim, Hyun-joo;Kwon, Suk-hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.32-42
    • /
    • 2018
  • Since the success or failure of VE projects depends on the capabilities of participants, including owners, construction managers, architects, general contractors and VE experts, it is important to follow systematic procedures. However, it is often the case that only a rough evaluation is performed, or the rough and detailed evaluations are integrated in actual VE tasks. In this case, it is difficult to analyze and evaluate the alternatives in terms of risk, even for the important alternatives. This in turn leads to the so-called returning alternatives where the alternatives proposed in the preceding stage are returned to the original plans in the following stage, and thus the repetitive work for the alternatives often decreases the efficiency of the VE task. In this regard, this study proposed a risk assessment process for VE alternatives in order to minimize the occurrence of returning alternatives based on the systematic analysis and evaluation of VE alternatives. It will increase the efficiency of VE tasks by reduces the number of regression alternatives.

An Analysis on the Investment Determinants for Insolvent Housing Development Projects (건설회사의 공동주택 PF 부실사업장에 대한 투자결정요인 분석)

  • An, Kukjin;Cho, Yongkyung;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.112-121
    • /
    • 2014
  • After IMF bailout crisis in Korea, project financing has been employed as a major funding vehicle for the housing development. In 2008, the recession of housing market due to the global financial crisis had an significant impact on the increasing insolvent site of PF based housing development project, resulting in serious impact to whole economy as a chain effect. In order to resolve this vicious circle of bankruptcy, the major construction companies were urged to take over the insolvent sites and invest to them for normal project exit, and finally play a critical role in normalization of market. Therefore, this study aims to define the core factors for decision making to invest to insolvent site and find out differences among constructors, developers, financial lenders. The results from AHP analysis, the profitability was the most important factor to constructors. Moreover, even though the location merit is little less, through competitive price, we can assure that stable profitability is most important factor to decide to invest in insolvent site. In conclusion, the price is cheap, is highly feasible, if the land secured, major construction company will participate in a PF business investment. These findings were verified by the investment case of major construction company.

Actuarial analysis of a reverse mortgage applying a modified Lee-Carter model based on the projection of the skewness of the mortality (왜도 예측을 이용한 Lee-Carter 모형의 주택연금 리스크 분석)

  • Lee, Hangsuck;Park, Sangdae;Baek, Hyeyoun
    • The Korean Journal of Applied Statistics
    • /
    • v.31 no.1
    • /
    • pp.77-96
    • /
    • 2018
  • A reverse mortgage provides a pension until the death for the insured or last survivor. Long-term risk management is important to estimate the contractual period of a reverse mortgage. It is also necessary to study prediction methods of mortality rates that appropriately reflect the improvement trend of the mortality rate since the extension of the life expectancy, which is the main cause of aging, can have a serious impact on the pension financial soundness. In this study, the Lee-Carter (LC) model reflects the improvement in mortality rates; in addition, multiple life model are also applied to a reverse mortgage. The mortality prediction method by the traditional LC model has shown a dramatic improvement in the mortality rate; therefore, this study suggests mortality projection based on the projection of the skewness for the mortality that has been applied to appropriately reflect the improvement trend of the mortality rate. This paper calculates monthly payments using future mortality rates based on the projection of the skewness of the mortality. As a result, the mortality rates based on this method less reflect the mortality improvement effect than the mortality rates based on a traditional LC model and a larger pension amount is calculated. In conclusion, this method is useful to forecast future mortality trend results in a significant reduction of longevity risk. It can also be used as a risk management method to pay appropriate monthly payments and prevent insufficient payment due to overpayment by the issuing institution and the guarantee institution of the reverse mortgage.