Evaluation of Tension of PSC Box Girder Bridges Using Risk Matrix |
Kim, Hyungjo
(R&D Division, Unicons Co. Ltd.)
Ji, Seunggu (Korea Infrastructure Safety Co) Kim, Hunkyom (Seoul Metropolitan Government Facility Division) Kim, Pilsoo (Seongnam City Hall Dept, of City Planning) Kim, Hunkyom (Department of Civil Engineering, Dong-yang University) Lee, Minjae (Department of Civil Engineering, Chungnam National University) |
1 | Kim, S. K., Kim, J. S., and Kim, H. J. (2017). "Probabilistic Risk Analysis of PSC Box Bridge Tension Based on Risk Matrix." Journal of the Korean Society of Civil Engineers, pp. 383-384. |
2 | Seoul Metropolitan Government Road Facilities Division (2015). "PSC box girder bridge maintenance plan establishment service." |
3 | FHWA (2013). "Guidelines for Sampling, Assessing, and Restoring Defective Grout in Prestressed Concrete Bridge Post-Tensioning Ducts." |
4 | FHWA (2013) "Recommendations for Assessing and Managing Long-Term Performance of Post-Tensioned Bridges having Tendons Installed with Grout Containing Elevated Levels of Chloride." |
5 | CEREMA1 (2014). "RISK ANALYSIS OF VULNERABLE BRIDGES ON THE NATIONAL ROAD NETWORK IN FRANCE." Division for Transportation Infrastructure and Materials, Technical Centre for Bridge Engineering. |
6 | Seoul Metropolitan City Safety Headquarters Road Facilities Division (2017). "PSC box girder bridge safety check manual." |
7 | ISO (2009). ISO 31000 : Risk Management. |
8 | He, Zhi (1995). "Risk management for overseas construction project." International Journal of Project Management, 13(4), pp. 231-237. DOI |
9 | He, Zhi (1995). "Risk management for overseas construction project." International Journal of Project Management, 13(4), pp. 231-237. DOI |
10 | Korea Occupational Safety and Health Agency (2010). "Guidance on how to analyze risks." |
11 | ASBI T-9 Committee (2014). "Grouted Post-Tensioning -State of the Practice (ASBI Presentation)." |