• Title/Summary/Keyword: 리스크 분석

Search Result 695, Processing Time 0.039 seconds

Analysis and Reduction for Risk factors of Construction Projects (건설공사의 리스크인자 분석 및 경감에 관한 연구)

  • Chung Byoung-Hwa;Chung Young-Shik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.62-68
    • /
    • 2001
  • The purpose of this study was to Identification the Risk of construction method to protect and reduce of construction period. Risk management is one of the key project management process. Numerous tools are available to support the various phases of the risk management process. We present the results of a study designed to identify the tools that are most widely used and those that are associated with successful project management in general, and with effective project risk management in particular. The study is based on a questionnaire administered to a sample of project managers from construction enterprises. The response data was analyzed in order to find which tools are more likely to be used in the those organizations that report better project management performance and in those that value the contribution of risk management processes.

  • PDF

A Case Study on Risk Analysis of Large Construction Projects (대형건설공사의 리스크 분석에 관한 사례적용연구)

  • Kang In-Seok;Kim Chang-Hak;Son Chang-Baek;Park Hong-Tae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.98-108
    • /
    • 2001
  • This research proposes a new risk analysis model in order to guarantee successful performance of construction projects. The risk analysis model, called Construction Risk Analysis System(CRAS), is introduced to help contractors Identify project risks through RBS and through the procedures in risk analysis model. The proposed CRAS model consists of three phases. First step, CRAS model can help contractors decide whether or not they bid for a project by analysing risks involved in the project. Second step, the influence diagraming, decision tree and Monte Carlo simulation are used as tools to analyze and evaluate project risks quantitatively. Third step, Monte Carlo simulation is used to assess risk for groups of activities with probabilistic branching and calendars. Consequently, it will help contractors identify risk elements in their projects and quantify the impact of risk on project time and cost.

  • PDF

An Investigation Study on the Risk Management Systems (리스크경영시스템에 관한 국제규격 (비교분석))

  • Kim Jong-Gurl;Um Sang-Joon
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.797-803
    • /
    • 2002
  • 다양한 리스크 문제가 발생하고 있는 기업 환경 속에서 세계선도 기업들은 이미 효과적인 리스크 관리시스템의 운영을 통하여 개업의 손실을 최소화함으로써 이윤을 극대화하고 있으나 우리 기업들은 아직 그렇지 못한 실정이다. 본 연구에서는 국제규격인 ISO14971과 IEC62198, JIS Q2001의 리스크 경영 규격을 중심으로 리스크 경영 시스템(Risk Management System :RMS)의 구성을 분석 비교한다. 각각의 규격에서 사용되는 적용범위, 용어 및 정의 리스크 경영의 개념과 절차, 경영 시스템에 적용되는 기법들을 비교, 분석하여 우리 기업들이 가지고있는 리스크 문제를 효과적으로 관리할 수 있는 대안 모색을 가능하도록 하는 기초 자료를 제시하고자 한다.

  • PDF

A Study of Risk Analysis on Apartment Reconstruction Projects (공동주택 재건축사업의 리스크 분석에 관한 연구)

  • Lee Lo-Na;Woo Kwang-Min;Lee Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.232-235
    • /
    • 2004
  • The apartment reconstruction project is making some problems, such as delay of lack specialty, conflict between project owners and cost increasing etc. The enforcement process of project are very complicated, the term of project is long and too many project owners are participating. For this reasons. it is always in the face of uncertainty. To promote the reconstructing project successfully. we need to make risk management process to get rid of uncertain factors which occur in forwarding the reconstructing project This study has for its objects. First, suggest the best way of risk analysis to manage risk factors systematically and efficiently recognized in The Apartment reconstruction protect. Second, furnish basic data to build the risk managing system of The apartment reconstructing project.

  • PDF

A Study on Countermeasures for Risk Factors Through Risk Analysis of Earthwork (흙막이공의 리스크 분석을 통한 리스크 요인별 대응 방안에 관한 연구)

  • Jeon, Byung Ju;Isah, Muritala Adebayo;Kim, Hyun Bee;Lee, Yang Gyu;Kim, Byung Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.5
    • /
    • pp.681-688
    • /
    • 2022
  • According to a recent study, most construction companies in Korea do not manage risk effectively, and it is judged that the risk management system needs to be improved. In addition, most risk-related studies deal with risks from a macroscopic perspective, and there are few studies dealing with process risks at the project construction stage. Therefore, this study tried to suggest a risk response plan through analysis and classification of risk factors that may occur in retaining work among process risks. To this end, a workshop was held for risk experts to identify and analyze risks that may occur during the construction of retaining work for apartments. As a result of the study, it was expected that savings of KRW 4.97 billion would be possible in the 95 % confidence interval, and the maximum possible cost was reduced from KRW 15 billion to about KRW 10 billion. Based on the risk reduction ratio, it was found that risks that can be reduced without any special input cost, risks with large effects in response to risks, and risks with insignificant effects were found. Therefore, using the types and risk factors presented in this study as guides, it is expected that it will be helpful in successfully operating the project if an appropriate response strategy is prepared and systematically responded to the site conditions.

A Study on the Analysis of Delay Claim Risk in Apartment Housing Projects (공동주택공사에서의 공기지연 리스크분석에 관한 연구)

  • Kim Jae-Wook;Woo Kwang-Min;Lee Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.217-221
    • /
    • 2003
  • This study proposes a new classification system and analysis methodology for time delay risk of apartment projects. And this study proposes the classification of major trades and risk level and risk index by performing expert-oriented interview and survey report on a national scale. The purpose of this study is to present basic data for time delay risk management system through the analysis of risk level, risk index and rank of major 5 trades(earth work, structure work, masonry work, window and door/glass work, and interior finish work) in apartment projects.

  • PDF

A Risk Management Method Using Fuzzy Theory for Early Construction Stage (퍼지이론을 이용한 초기 건설공사의 리스크 관리 방법)

  • Hwang Ji-Sun;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.136-143
    • /
    • 2004
  • This study presents a risk management methodology using fuzzy theory for early construction stage and is focused on risk identification and risk analysis. This study identifies various risk factors associated with activities clearly construction stage, then establishes the Risk Breakdown Structure(RBS) by classifying the risks into the three groups; Common risks, risks for Earth works, and risks for Foundation works. The risk analysis method presented in this study is based on the RBS that has two levels such as upper level and lower level. The risk exposure of lower level risk factors is assessed by fuzzy inference. The weight of risks is estimated by fuzzy measure. Then, the estimated risk exposures and weights are aggregated to assess the risk exposure of upper level risks by Choquet fuzzy integral. The risk exposure of upper level risks determine the priority of risk factors in view of risk management. This study performs case study to validate the proposed method. The result of case study shows that the methodology suggested in this thesis would be utilized well in evaluating risk exposure.

A Comparative Analysis of Risk Assessment Depending on International Project Types (플랜트, 건축, 토목 공종별 해외건설 리스크평가 비교분석)

  • Baek, Seungwon;Han, Seung-Heon;Jung, Wooyong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.125-136
    • /
    • 2019
  • This study investigated checked risk level before bid, actual risk level after award, contingency, and cost growth rate in the 124 international construction projects executed by Korean major companies. This study conducted comparative analysis by product type using rank analysis, ANOVA and correlation analysis. As a result, plant and civil projects have worse risk level than architecture projects not only in before bid but also in after award. Especially, country risk is the worst risk in both plant and civil projects, followed by project risk and capability risk. Also, although plant and civil projects reflect more contingency than architecture projects, contingency is not correlated with the checked risk level before bid. Lastly, the cost growth rate is correlated with the actual risk level in all product types. This study is expected to support in planning better practical risk management for international construction projects.

The Analysis of the Weights of Country Risk by Participants of Overseas Construction Projects (건설사업 참여주체 별 해외건설공사 국가리스크 핵심요인 도출 및 비교분석)

  • An, Byung-Ho;Kim, Jin-Eon;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.150-159
    • /
    • 2013
  • The government has focused on activation of overseas construction projects and strengthening competitiveness in the long term. In recent years Public construction contract as well as design, engineering, construction management(CM) are gradually expanding into other countries, but risk analysis cases in the field are slight. In this study, We utilized PI scale and drew a conclusion about the importance of overseas risk by participants. We compared its features from the risk factor based on Risk Matrix. As a result of this study total of 6 section 31 Country Risk factors for the importance of overseas risk by participants were drawn, and the key risk factors (17 constructor, 14 designers, 17 CMr) based on Risk Matrix were derived. By utilizing the result of this study will be used as the basic data for establishing risk management strategy to meet each business and planning evaluation model.

Development of Standard Systems through Analysis of Business Process the Risk Factors for the Korean Construction Management Firms (국내 CM기업의 리스크 인자별 관리 업무 프로세스 분석을 통한 표준업무체계 개발)

  • Park, Kyungmo;Kim, Changduk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.73-83
    • /
    • 2015
  • Construction management firms in Korea have mainly focused on the key management areas of time, cost, quality and safety management in line with a rapid change of construction industry recently. However, a risk management is considered comparatively less important found from our research on an investment by the firms for training, system establishment. This has been identified that the construction management firms have taken an approach of dealing with risks with their experience, insight rather than managing risks with a systemized principles or proper tools. Therefore, the current system for risk management was identified by analyzing risk factors and work process in this research and systemized process for risk management of the identified risk factors was suggested. This research is expected to be a basis on establishing standard gudiance for risk management and risk management tools.