• Title/Summary/Keyword: 리스크 분석기법

Search Result 144, Processing Time 0.035 seconds

Predicting Project Performance by Analyzing Key Success Factors on Project Fiancing(PF) Development (건설 프로젝트 파이낸스(PF) 사업의 성공영향요인(KSF) 분석을 통한 사업성과 예측 모델)

  • Lee, Dong-Gun;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.127-137
    • /
    • 2014
  • Project Financing (PF) development project is the type which influences national economy and building industry largely because it is exerted by using borrowed money from many kinds of investors and huge amount of financial raising. Many domestic PF projects are focused mainly on the profit maximization lacking in a sufficient feasibility study. Nowadays many projects are suspending due to the global finance debacle and stagnation of real estate industry. Therefore, in this paper, risk factors of PF project are deducted and Key Success Factors (KSFs) are derived through Factor-Analysis and qualified using Fuzzy-AHP method. And through the evaluation of the derived success factors in real projects, a strong correlationship has been identified between the score of each PF success factor and the level of success and/or expected rate of return (ROR). So, the result of this paper can help decision makers of the PF projects make a better decision and give a meaningful guidance in achieving successful PF projects.

The Study on the System to Estimate the Cost by Using Regression in the Early Stage of the Project (공사 초기단계에서의 회귀분석을 이용한 최종공사비(EAC) 추정 방법)

  • Lee, Youn-Mi;Lee, Man-Hee;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.274-277
    • /
    • 2006
  • The EAC(Estimate at Completion) among existing methods, which estimate cost and time effectively, help managers anticipate changeable several results at the point of $15{\sim}30%$ in the project progress. However, this method may cause such some problems as not to consider the periodically changing circumstances caused by construction risks or uncertainties which can affect the cost and time in the project, and to regard collected and accumulated data only as a single value when predicting the results on the progress. Accordingly, it is very difficult to accept the even small range of variability based on the anticipation of EAC. Consequently, the study focuses on the possibility methodology to anticipate time and cost accurately on the way to utilize EVMS(Earned Value Management System), and also suggest the way to perform the right estimation of EAC as considering various risks and uncertainties in construction projects.

  • PDF

A Research of Risk Assessment for Urethane Fire Based on Fire Toxicity (연소 독성 기반 우레탄 화재의 위험성 평가 연구)

  • Kim, Sung-Soo;Cho, Nam-Wook;Rie, Dong-Ho
    • Fire Science and Engineering
    • /
    • v.29 no.2
    • /
    • pp.73-78
    • /
    • 2015
  • Fire in the risk management subject belongs to high risk disaster which accompanies personnel and materiel loss. So, management of disaster and safety is required to include fire prevention activities, fire risk prediction and investment of safety management expense. Combustion toxicity is required by gas toxicity test (KS F 2271), to minimize human damage. In this study, gas toxicity test were experimented with regard to urethane sample (Depth 5~25 mm) to obtain basic data. Fire effluent exposing to experimental animal were analyzed by FT-IR (Fourier transform infrared spectroscopy). Combustion toxicity index Lethal Fractional Effective Dose ($L_{FED}$) of ISO 13344 was calculated. According to the result of calculating Lethal Concentration 50% ($LC_{50}$) based on $L_{FED}$, $LC_{50}$ of urethane sample containing certain level of fire load is confirmed as $118{\sim}129g/m^3$. Through this study, applicability of this method was confirmed for fire risk assessment. This method can provide information to predict human damage by toxicity combustion gas for securing safety.

Introduction of the Best Practices in the Pakistan Gulpur HEPP (파키스탄 Gulpur 수력발전 현장의 Best Practices 소개)

  • JANG, Ock Jae;HONG, Won Pyo;CHAE, Hee Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF

Uniform Hazard Spectrum Evaluation Method for Nuclear Power Plants on Soil Sites based on the Hazard Spectra of Bedrock Sites (암반 지반의 재해도 스펙트럼에 기반한 토사지반 원전 부지의 등재해도 스펙트럼 평가 기법)

  • Hahm, Dae-Gi;Seo, Jeong-Moon;Choi, In-Kil;Rhee, Hyun-Me
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.16 no.3
    • /
    • pp.35-42
    • /
    • 2012
  • We propose a probabilistic method to evaluate the uniform hazard spectra (UHS) of the soil of nuclear power plant(NPP) sites corresponding to that of a bedrock site. To do this, amplification factors on the surface of soil sites were estimated through site response analysis while considering the uncertainty in the earthquake ground motion and soil deposit characteristics. The amplification factors were calculated by regression analysis with spectral acceleration because these two factors are mostly correlated. The proposed method was applied to the evaluation of UHS for the KNGR (Korean Next Generation Reactor) and the APR1400 (Advanced Power Reactor 1400) nuclear power plant sites of B1, B4, C1 and C3. The most dominant frequency range with respect to the annual frequency of earthquakes was evaluated from the UHS analysis. It can be expected that the proposed method will improve the results of integrated risk assessments of NPPs rationally. We expect also that the proposed method will be applied to the evaluation of the UHS and of many other kinds of soil sites.

T&E Process for Safety-Critical CNS/ATM Systems (안전필수항행시스템의 시험평가 프로세스)

  • Kang, Ja-Young;Kim, Mu-Geun;Kim, Young-Hoon;Lim, In-Kyu
    • Journal of Advanced Navigation Technology
    • /
    • v.21 no.1
    • /
    • pp.50-57
    • /
    • 2017
  • Recently, safety-critical aviation system development programs promoted domestically have been terminated in the middle stage or they have not been put to practical use at the final stage. The program failure may be caused by various factors, but this study focused on imperfect test and evaluation(T&E) procedures. In general, T&E process of a safety-critical system must be distributed throughout the entire life-cycle of the system, have a continuity in phases, and can be implemented in a variety of ways depending on the maturity of the system development and acquisition strategy. This paper aims to present a new strategy by analyzing the domestic and overseas T&E processes to reduce the risk of domestic safety-critical CNS/ATM system development program and increase the success rate of program. First, we discuss the verification and validation techniques for safety-critical systems, analyze the T&E procedures of advanced institutes and the domestic situation, and then compare the domestic and overseas T&E processes to complement the imperfect testing procedure.

A Study on Establishing Entry Strategies of Private Engineering Firms in the Overseas Urban Development Market (기업의 해외 도시개발 시장진출을 위한 전략수립에 관한 연구 - IPA 기법을 중심으로 -)

  • Song, Hokyoung;Yu, Youngsu;Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.86-95
    • /
    • 2019
  • As the urban development economy is stagnating due to the reduction of the budget for Social Overhead Capital (SOC) and the stabilization policy of the real estate market, there is a steady increase in the interest of domestic construction companies to enter the overseas market. However, domestic construction companies are showing a decline in overseas urban development market as compared with advanced foreign companies having excellent financial management and overseas project management ability. Therefore, it is necessary for domestic companies to select an urban development model that meets the environment and the level of the country of entry, and to establish an advance strategy to manage the risks of overseas business. For this purpose, the factors of entry into the overseas urban development market through the existing research, literature analysis, and FGI were derived, and survey strategy and IPA analysis were conducted to develop strategies for entering the overseas urban development market. As a result, we have established a strategy for private companies to enter the overseas urban development market.

Development of Priority Assessment Model for Recovery from Urban Flooding considering Lifelines with Resilience (도심지 라이프라인을 고려한 도시침수피해 복구우선순위 산정모델 개발)

  • Hyung Jun Park;Chan Jin Jung;Dong Hyun Kim;Seung Oh Lee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.21-21
    • /
    • 2023
  • 현재 구축되어있는 방재시설의 능력은 기후위기로 인해 수용가능한 극한강우량의 범위를 넘어서고 있어 대형화된 홍수로 인한 피해가 꾸준히 발생하고 있다. 이로 인해 잠재적 홍수로 인한 도시회복도 관리와 홍수로 수반되는 피해에 대한 복구의 중요도가 높아지고 있다. 회복도는 도시의 재해 취약성, 저항, 적응, 복구, 완화에 대한 능력을 포괄하는 개념으로써 최근 주목받고 있는 개념이지만 대부분의 연구는 주로 시설에 대한 회복도 평가가 이루어지고 있다 (Sen et al.,2021). 또한 재해 후 도시복구에 관한 연구는 다수 존재하지만 복구에 따른 지역의 회복도 변화와 라이프라인과 같은 주요 시설의 복구에 따른 회복도 차이를 고려한 연구는 미비한 실정이다. 따라서 본 연구에서는 도시침수 발생 후 라이프라인을 고려한 도시복구 우선순위 산정모델을 개발하고 재해관리의 효율성 향상측면에서 도시의 기능적 회복도를 평가하였다. 이를 위해 라이프라인 중 도로 복구결과의 평가를 위하여 리스크 매트릭스 기법을 이용한 도로위험도평가를 수행하였으며 도시의 회복도를 측정하였다. 회복도를 크게 홍수로부터 도시가 받은 영향과 재해복구역량으로 구성하였으며 정량적인 평가를 위해 각각 손상함수와 재해재난목적예비비를 활용하여 산정하였다. 이후 복구우선순위를 산정하였으며 복구와 도시회복도와의 관계를 분석하기 위하여 재해연보 자료를 기초로 회귀분석을 통해 복구비용을 추정하였다 (유순영 등.,2014). 시범지역에 적용한 결과 시설 및 도로 복구에 따른 도시영향의 변화보다 복구비사용으로 인한 재해복구역량의 변화가 더욱 크다는 것을 확인하였다. 이는 재해재난목적예비비의 중요성이 크다는 것을 의미하며 향후 추가적인 인문학적, 법제적 요소가 회복도에 미치는 영향을 연구한다면 도시회복도 향상 및 도시복구에 관한 정책적 의사결정에 큰 도움이 될 것이다.

  • PDF

Derivation of Components for Feasibility Study of Smart City Public and Private Partnership Projects (스마트시티 민관합동사업의 타당성분석 구성요소 도출)

  • Hyun, Kilyong;Jin, Chengquan;Lee, Sanghoon;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.98-110
    • /
    • 2023
  • The smart city public and private partnership project is a project to build and operate a sustainable city by investing land and capital in public-private partnership to build urban infrastructure and providing various urban services. It highly depends on the precise feasibility study and the projection of the various factors affecting the project during the planning stage to get the project successful. However, it is very difficult to predict the possibility of the project success in advance due to various physical and social factors. It is necessary to derive factors affecting the project at the planning stage and respond with appropriate analysis in order to solve these problems and to carry out a successful project. Therefore, this study derived preliminary components for feasibility study through previous studies and order status analysis and presented feasibility study components such as five-step processes, 10 process items, 19 analysis items, and 54 detailed analysis items through the Delphi method. It can be expected that this research is to contribute corresponding to diversified possible risks and facilitate the projects during the promotion.

A study on improvement of Trade Finance under international financial markets regulations (금융시장에 대한 국제적 규제 강화에 따른 무역금융제도의 개선방안)

  • Hong, Gil-Jong;La, Kong-Woo
    • International Commerce and Information Review
    • /
    • v.15 no.3
    • /
    • pp.289-310
    • /
    • 2013
  • In the past, an policy measures for the promotion of the export has actively used trade finance, but also in its effect there is no doubt. However, in 2008 the bankruptcy of Lehman Brothers triggered the global financial crisis. As a result, the need to effectively manage liquidity risk posed, and was a debut for Basel III. Focusing on trade finance banks are being made. Domestic commercial banks have not been able not utilize various trade finance techniques. In these situations, the introduction of Basel III can discourage trade finance. Therefore, responses should be prepared for it. Therefore, this study analyzes the status of trade finance system. And international regulation of the financial market are investigated for changes. Based on this, the development direction of Korea's trade finance is proposed.

  • PDF