• Title/Summary/Keyword: 리모델링 기법

Search Result 54, Processing Time 0.02 seconds

An Efficient Economic Evaluation Method for Remodeling Project (리모델링 프로젝트의 효율적 경제성 평가방안)

  • Kim Kyoung-Joong;Woo Kyoung-Sub;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.261-266
    • /
    • 2001
  • Recently, remodeling has been introduced in the domestic construction industry as an alternative new construction. Its economic evaluation is the essential part of remodeling business. Therefore, this study has the purpose of presenting the method that is able to evaluate the actual value in the market. And this method can compare before & after value of remodeling in feasibility study. For this, this study reviews economic evaluation methods in construction and real estate fields and analysis their problem and merits & faults. With those facts, this study makes a mixed economic evaluation method that can be used in construction and real estate fields.

  • PDF

The Development of Assessment Method for Parking Lot Remodeling Alternative Adopted Asset Management Technique (자산관리 기법을 적용한 주차장 리모델링 대안평가 기법 개발)

  • Yu, Yongsin;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.52-62
    • /
    • 2017
  • The purpose of this study is to develope an assessment method for parking lot remodeling alternative by adopting the asset management technique. In order to identify the Level of Service(LOS) and the Evaluation Measurement(EM), literatures was implemented which documented the consideration of parking lot plan, needs of the apartments' tenant, and various design standards. In addition, the authors conducted a three-time delphi survey for the identified 5 LOS and 19 EM to evaluate suitability and necessity of them and to collect additional opinion of experts. The LOS of parking lot were categorized into 5 areas such as Environmental effect and Convenience, Accessibility and so on. The 19 EM were determined to estimate the LOS quantitatively. The researchers analyzed the degree of importance of LOS and EM by using the Analytic Hierarchy Process (AHP) method. But construction cost was excepted from the analysis, because it is used as an independent variable in alternative assessment. In conclusion, the authors proposed the estimation criteria for EM, and the method and process for alternative assessment be performed to benefit-cost analysis using the LOS variation and construction cost. The assessment method for parking lot remodeling alternative was demonstrated effective to assess the parking lot remodeling alternative by case-study. This study has a academic significance by adopting the asset management techniques in the area of the parking lot remodeling. And the assessment method is expected to help deciding a reasonable remodeling alternative of parking lot, as it ensures the diversity for remodeling of the parking lot and reflects the needs of the occupant.

Deducting the Critical Enhancement Task of Green Remodeling based on IPA Method (IPA 기법 기반 그린리모델링 중점 강화 업무 도출에 관한 연구)

  • Kwon, Young-In;Hwang, Doo-Won;Jung, Sung-Ho;Lee, Ki-Seok;Park, Jong-Il;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.58-69
    • /
    • 2016
  • As issue of global environment, Korea government sets the specific goal to reduce CO2 emission by 26.9% in construction industry up to 2020. Korea government is encouraging Greenremodeling and progressing the pilot to establish the guideline and instruction. However, There is a lack of the study on establishing process, tasks of Greenremodeling, and Greenremodeling guidelines and instructions are also insufficient, so the vitalization of Greenremodeling is difficult. Therefore, the purpose of this study is deducting Greenremodeling process and the critical enhancement task of Greenremodeling. For that, deducting the Greenremodeling tasks through analyzing of previous research and taking counsel from experts, and drawing the critical enhancement tasks of Greenremodeling using IPA method. From now on, It is conducted in Greenremodeling business and expected to contribute Greenremodeling market.

A Study on the Estimation of Remodeling Method by Focused on Apartment House User's Request (공동주택 사용자 중심의 리모델링 방법 평가에 관한 연구)

  • Yoo, In-Geun;Kim, Chun-Hag;Yoon, Yer-Wan;Yang, Keek-Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.4
    • /
    • pp.211-222
    • /
    • 2004
  • Lately construction industry tends to prefer remodeling of existing buildings rather than new construction or reconstruction of buildings due to strengthening of several restriction related to real estates along with prolonged depression. And also, remodeling of building costs less and creates less wastes compared to reconstruction and so it is more profitable in financial and environmental view. However remodeling is process of creating new environment with existing building. Therefor remodeling must follow the procedure realizing problem and fix the problem based on through investigation on existing building and users requirement must be faithfully reflected. Specially in case of apartment houses, since vagueness on ownership and management authority on common parts exists. Hereupon, in this study we are to present the procedure of analyzing apartment house remodeling method through user requirement by approaching to several considerable factors in user request side.

Scheduling Technique for Remodeling Project of Inhabited Condition (재실 리모델링 특성을 반영한 공정계획 기법)

  • Paik, Hwa-Sook;Nam, Wook-Jin;Kim, Sung-Han;Kim, Hyung-Jin;Choi, Jong-Soo;Kim, Kyung-Hwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.141-149
    • /
    • 2013
  • This paper presents a scheduling technique that reflects various constraints in remodeling project of inhabited condition. The remodeling project of inhabited condition is required more detailed planning and control due to claims by noise, vibration, dust, smells, limited lift capacity, and limited temporary stock area. Because of the constraints, complexity in scheduling is increased and earlier completion is required to reduce the possibility of safety and environment accidents. Especially, in case of inhabited condition, the scheduling should be linked day-time/night-time/weekend work. This paper proposes a structured scheduling technique to incorporate those constraints in remodeling of inhabited condition. This scheduling technique considers not only remodeling process but also dismantling, newly-construction, and residents movement. Process expression method using MS-Project also presented to keep connectivity with existing scheduling system.

Decision Criterion in Military Apartment Remodeling Project (군인아파트 리모델링에 있어서 항목별 우선순위 결정에 관한 연구)

  • Ryu Kuk-Mu;Kim Gil-Su;Shin Chang-Hyun;Jung Yong- Sik;Chun Jae-You
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.277-280
    • /
    • 2004
  • Since the beginning of our military history, we are continuously interested in supplying apartment for military officers. So we possessed 72,361 households and used in 2002 however, $18\%$ of those are over 20years and need to be remodeled Department of Military has taken this fact seriously To solve the problems, they built more new buildings, rent public buildings and remodeled the old one But, The procedure of present military apartment remodeling has many problems at the stage of evaluating the priorities in various remodeling projects which have been caused from lots of corps. I've reviewed the study of military apartment business and applied the AHP(Analytic Hierarchy Process) method which is effective to evaluate the priority in various groups' decision.

  • PDF

Factors Determining the Price of Remodeled Multi-family Housing (리모델링 공동주택의 가격결정요인에 관한 연구)

  • Kim, JaeSung;Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.13-22
    • /
    • 2016
  • Remodeling of multi-family house (MFH) has emerged as a major issue in the construction industry. Many decision-makers are struggling to determine whether to conduct a remodeling because of insufficient information including standard or method for projecting the price of their facilities after remodeling works. In this context, this research has conducted for analyzing how the price of the MFH is shifted by remodeling works. To achieve this research goal, (i) fourteen MFH remodeling cases were collected and (ii) price variation for the collected cases was analyzed in order to figure out how remodeling work affects the price of MFH cases. Finally, this research suggested the factors determining price of the MFH, wherein remodeling work has been conducted. From the results of this research, it is expected that the decision-makers can understand what is the crucial factors for determining the price of their MFH when they plans remodeling, and further this research can be a corner stone for developing a model for predicting the price of MFH if remodeling would be performed.

Performance Criteria to Assess the Remodeling Feasibility of Office Buildings (업무용 건축물 리모델링 사업성 평가 성능기준)

  • Yang, Keek-Young;Yoon, Yer-Wan;Jeong, Dong-Whan
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.2
    • /
    • pp.142-151
    • /
    • 2012
  • Despite the changes to demands and perceptions according to building deterioration, most of the previous studies on remodeling have focused on apartment buildings, which are residential buildings. Few studies have been conducted on buildings for general commercial use, or office buildings. Accordingly, this study set out to prepare a set of performance criteria to assess the remodeling feasibility of office buildings. For that purpose, 23 assessment items were devised, their importance was tested, 13 were extracted, and a set of scoring criteria for each item was prepared. Case analysis was conducted to check the reliability of the assessment items and scoring criteria. Through this analysis, it was found that the criteria were reliable.