• Title/Summary/Keyword: 레일표면 요철

Search Result 16, Processing Time 0.034 seconds

The Prediction Equation for Bending Stress of Rail in Concrete Track by the Linear Multiple Regression Analysis (중회귀분석을 통한 콘크리트궤도 레일 휨응력 예측식)

  • Sung, Deok-Yong;Lim, Hyoung-Jun;Lee, Dong-Wook;Kim, Bag-Jin;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.315-323
    • /
    • 2010
  • It is suggested that the service life of the continuous welded rail(CWR) is estimated by the relationship between the rail surface irregularity according to the accumulated passing tonnage and bending fatigue of welded part in CWR. In this study, it measured bending stress of rail according to the rail surface irregularity in the concrete track on the Seoul Metro. In addition, the relationship between rail surface irregularity and bending stress in concrete track is analyzed by results of the field test. Finally, this study clarified the relationship among bending stress(Y) of rail, train speed(U), rail surface irregularity(v, w) in concrete track. The result of this study is able to use the basis data to establishing the periodic replacements criterion of CWR.

  • PDF

Experimental Study to analyze Effect of Rail Corrugation Reduction according to Rail Grinding (레일연마에 따른 레일 파상마모 저감 효과 분석을 위한 실험적 연구)

  • Choi, Jung-Youl;Jeong, Cheon-Man;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.801-806
    • /
    • 2021
  • Rail corrugation is continuously increasing due to the lack of maintenance regulations for the amount of rail irregularities. Rail corrugation is causing various problems, such as a decrease in ride comfort and an increase in the amount of track maintenance. In this paper, the effect of rail corrugation on the track force was analyzed by measuring the rail irregularities before and after rail grinding and the track measurements (dynamic wheel load, displacement, and acceleration) for the section where the rail corrugation occurred. In addition, it was experimentally proven that the rail grinding performed to reduce the corrugation of the rail was very effective in reducing the additional forces on the track.

Investigation of the Maintenance Criteria for the Rail Surface Defects in High-Speed Railways (고속철도 레일 표면 결함 관리기준에 관한 연구)

  • Yang, Sin-Chu;Jang, Seung-Yup
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.6
    • /
    • pp.535-544
    • /
    • 2011
  • The rail surface defects can cause the high impact load on the track and lead to the progress of the rail fatigue damage and the rail break. In case of the rail break, there is a great deal of risk for derailment, and thus the maintenance criteria for the rail surface defects are of great importance. In this study, using the dynamic train-track interaction analysis program, the impact wheel loads and rail bending stresses according to the depths of the surface defects have been calculated with the input data of the rail surface irregularities measured at 43 spots with surface defects in the ballasted track of high-speed railway. Considering the irregularity of track geometry, the allowable limits of wheel load and rail bending stress have been set, and the maintenance criteria for the rail surface defects was suggested by analyzing the relationship of the maximum values of wheel load and rail bending stress versus depth and width of rail surface defect. The analysis results suggest that the allowable depth of the surface defect is determined approximately 0.2mm from the limit of the impact wheel load.

Evaluation of Rail Fatigue and Bending Fatigue Considering Concrete Track Condition (콘크리트도상(STEDEF)의 선로조건을 고려한 레일휨응력 예측과 피로수명 산출)

  • Lee, Soo-hyung;Kang, You-song;Park, Yong-gul
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.5
    • /
    • pp.658-667
    • /
    • 2017
  • Rail is the main track component, playing the most important role in safe railways. For the sake of safety, it is strictly required to secure reliability against fatigue and destruction of rail. In this paper, by field measurement on concrete track, it is confirmed that the rail surface roughness and rail bending stress are linearly correlated with each other; the bending stress of rail can be presented as a function of train speed, track support stiffness, and rail surface roughness. The fatigue life of rail can be estimated by deriving the S-N curve through the fatigue test.

The Fatigue Life Evaluation of CWR based on the Rail Grinding (레일연마를 고려한 장대레일의 피로수명 평가)

  • Kong, Sun-Young;Sung, Deok-Yong;Park, Yong-Gul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.5
    • /
    • pp.1191-1198
    • /
    • 2015
  • In this study, vehicle/track interaction analysis by the Saemaul powered vehicle was carried out. The prediction equation for the bending stress of rail was estimated using the rail bending stress by the rail surface irregularities at welds. Also, the fatigue analysis using a S-N curve of welds in the conventional railway was carried out. We estimated the fatigue life of CWR by the fracture probability. By the rail grinding, the fatigue life of CWR was evaluated in consideration to reduce the rail bending stress through removing the rail surface irregularities. Therefore, it presented the fatigue life of CWR according to the rail grinding execution plan in the conventional railway.

Experimental Study for Establishing Rail Grinding Period in the Urban Railway (도시철도 레일연마주기 산정을 위한 시험적 연구)

  • Sung, Deok-Yong;Go, Dong-Chun;Park, Yong-Gul;Kong, Sun-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.4
    • /
    • pp.447-454
    • /
    • 2010
  • The defects of rail head induced by fatigue and deterioration are mainly classified by two types ; one occurred on the surface of rail head the another occurred on the inner rail head. This study performed the surface irregularity measurement of rail head according to the passing tonnage in the urban railway. Also, we carried out microscopic structure test, chemical component test and micro-hardness test for the specimen which is the used rail on metro line by accumulated passing tonnage. As a result of this study, for new rail, it should be performed initial grinding in order to remove 0.3mm of de-carbonized layer. The preventive-cyclic grinding for preventing RCF defects is proposed two options : grinding by the whole line and grinding by specified sections.

Estimation of Bending Fatigue Life of CWR in Concrete Track (콘크리트궤도 장대레일의 휨 피로수명 평가)

  • Sung, Deok-Yong;Tae, Sung-Sik;Park, Kwang-Hwa;Kong, Sun-Yong;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.64-71
    • /
    • 2010
  • It is suggested that the service life of the continuous welded rail(CWR) is estimated by the relationship between the rail surface irregularity according to the accumulated passing tonnage and bending fatigue of welded part in CWR. In this study, based on the results of bending fatigue tests of rail and results of measuring tests in situ of rail bending stress, this study estimated the bending fatigue life of welded rail in concrete track, adopting a Haibach's rule. The bending fatigue life of CWR considered the rail surface irregularity, train speed and the S-N curve by types of rail welding. In addition, this study estimated it for the fracture probability 1%, 0.1%, 0.01%. Therefore, this study proposed bending fatigue life of CWR in concrete track.

  • PDF

The Study on the location-based realtime measurement system for the road surface using Laser Displacement Sensor and GPS (레이저 변위센서와 GPS를 이용한 위치기반 실시간 도로표면 측정 시스템에 관한 연구)

  • Hwang, Seon-Deok;Kim, Ho-Seong
    • Proceedings of the KIEE Conference
    • /
    • 2005.07c
    • /
    • pp.2351-2353
    • /
    • 2005
  • 본 논문은 포장도로의 표면 상태를 고성능의 레이저 변위 센서를 사용하여 정밀하게 측정하고, GPS(Global Positioning System)를 사용하여 측정 위치 데이터를 획득하는 도로 표면 측정 장비 개발에 관한 논문이다. 본 연구에서는 전체 시스템을 설계하고, 차량 주행을 모사한 실험 모형을 제작하여 실내 실험을 실시하였으며, GPS 단말기로부터 실시간으로 위치 신호를 수신하여 도로면 데이터와 연동할 수 있도록 하였다. 그리고 평가 차량의 전면에 레일(rail)을 장착하여 레이저 변위 센서가 좌우로 왕복운동이 가능하도록 하였으며, 레일을 작동시킨 상태에서 도로면을 측정해 보았다. 실험 모형의 측정 곁과는 차량이 80km/h로 주행할 때 도로 표지 타이닝(tinning)의 폭 오차 3.24%, 깊이 오차 5%였다. 차량이 정지된 상태에서 레일을 작동시켜 요철을 측정하였을 경우 레일 방향에 대한 폭 오차는 0.07%였다.

  • PDF

Correlation Analysis between Dynamic Wheel-Rail Force and Rail Grinding (차륜-레일 상호작용력과 레일연마의 상관관계 분석)

  • Park, Joon-Woo;Sung, Deok-Yong;Park, Yong-Gul
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.2
    • /
    • pp.234-240
    • /
    • 2017
  • In this study, the influences of rail surface roughness on dynamic wheel-rail forces currently employed in conventional lines were assessed by performing field measurements according to grinding of rail surface roughness. The influence of the grinding effect was evaluated using a previous empirical prediction model for dynamic wheel-rail forces; model includes first-order derivatives of QI (Quality Index) and vehicle velocity. The theoretical dynamic wheel-rail force determined using the previous prediction equation was analyzed using the QI, which decreased due to rail grinding as determined through field measurements. At a constant track support stiffness, an increase in the QI caused an increase in dynamic wheel-rail forces. Further, it can be inferred that the results of dynamic wheel-rail analysis obtained using the measured data, such as the variation of QI due to rail grinding, can be used to predict the peak dynamic forces. Therefore, it is obvious that the optimum amount of rail grinding can be determined by considering the QI, that was regarding an operation characteristics of the target track (vehicle velocity and wheel load).

The Growth friend Analysis of Rail Surface Irregularity according to the Types of Track (궤도구조별 레일두부 표면요철의 성장 경향 분석)

  • Sung, Deok-Yong;Kong, Sun-Yong;Kim, Bag-Jin;Shin, Hyo-Jeong;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.369-375
    • /
    • 2009
  • The Periodic replacements criterion of rail is calculated on the basis of the research result of RTRI in Japan. It is suggested that the service life of the continuous welded rail(CWR) is estimated by the relationship between the rail surface irregularity according to the accumulated passing tonnage and bending fatigue of welded part in CWR. In order to establish the periodic replacements criterion of CWR, this study measured the rail surface irregularity according to the accumulated passing tonnage, the types of track system and welding. Therefore, it is analyzed that the gas pressure welding is the worst one of the others. In addition, it is analyzed that the rail surface irregularity growth rate in ballast track is about $0.02{\sim}0.03mm$/100MGT and its in concrete track is about $0.005{\sim}0.02mm$/100MGT Finally, the result of this study is able to use the basis data to establishing the periodic replacements criterion of CWR considering rail grinding.

  • PDF