• Title/Summary/Keyword: 도로타당성

Search Result 253, Processing Time 0.027 seconds

Estimation of Induced Highway Travel Demand (도로교통의 유발통행수요 추정에 관한 연구)

  • Lee, Gyu-Jin;Choe, Gi-Ju
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.7 s.93
    • /
    • pp.91-100
    • /
    • 2006
  • Travel Demand Forecasting (TDF) is an essential and critical process in the evaluation of the highway improvement Project. The four-step TDF Process has generally been used to forecast travel demand and analyze the effects of diverted travel demand based on the given Origin-Destination trips in the future. Transportation system improvements, however, generate more travel, Induced Travel Demand (ITD) or latent travel demand, which has not been considered in the project evaluation. The Purpose of this study Is to develop a model which can forecast the ITD applied theory of economics and the Program(I.D.A) which can be widely applied to project evaluation analysis. The Kang-Byun-Book-Ro expansion scenario is used to apply and analyze a real-world situation. The result highlights that as much as 15% of diverted travel demand is generated as ITD. The results of this study are expected to improve reliability of the project evaluation of the highway improvement Project.

A fundamental study on the development of feasibility assessment system for utility tunnel by urban patterns (도심지 유형별 공동구 설치 타당성 평가시스템 개발에 관한 기초 연구)

  • Lee, Seong-Won;Sim, Young-Jong;Na, Gwi-Tae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.1
    • /
    • pp.11-27
    • /
    • 2017
  • The road network system of major domestic urban areas such as city of Seoul was rapidly developed and regionally expanded. In addition, many kinds of life-lines such as electrical cables, telephone cables, water&sewerage lines, heat&cold conduits and gas lines were needed in order for urban residents to live comfortably. Therefore, most of the life-lines were individually buried in underground and individually managed. The utility tunnel is defined as the urban planning facilities for commonly installing life-lines in the National Land Planning Act. Expectation effectiveness of urban utility tunnels is reducing repeated excavation of roads, improvement of urban landscape; road pavement durability; driving performance and traffic flow. It can also be expected that ensuring disaster safety for earthquakes and sinkholes, smart-grind and electric vehicle supply, rapid response to changes in future living environment and etc. Therefore, necessity of urban utility tunnels has recently increased. However, all of the constructed utility tunnels are cut-and-cover tunnels domestically, which is included in development of new-town areas. Since urban areas can not accommodate all buried life-lines, it is necessary to study the feasibility assessment system for utility tunnel by urban patterns and capacity optimization for urban utility tunnels. In this study, we break away from the new-town utility tunnels and suggest a quantitative assessment model based on the evaluation index for urban areas. In addition, we also develop a program that can implement a quantitative evaluation system by subdividing the feasibility assessment system of urban patterns. Ultimately, this study can contribute to be activated the urban utility tunnel.

Estimation of K-factor according to Road Type and Economic Evaluation on National Highway (일반국도의 도로 유형별 설계시간계수 산정 및 경제성 평가)

  • Kim, Tae-woon;Oh, Ju-sam
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.11
    • /
    • pp.582-590
    • /
    • 2015
  • Road type classification and K-factors are important role when design of number of lane. In this study not only classifies road type and estimating of K-factor but also economic evaluation tries for feasibility verification. Road type analysis results, time of day traffic volume variation, weekend-factor and vacation-factor are large in recreation roads. Weekday traffic volume and weekend traffic volume are similar patterns in provincial roads. AADT is high and time of day traffic volume variation is small in urban roads. In this study compares with economic analysis that designing of number of lane between KHCM's K-factor and this study K-factor. Economic analysis results, designed roads by this study's K-factor reduce cost about 4,708 hundred million won. So this study's K-factor is economical on provincial 4 lane roads.

Analyzing Planning Performance of Road Construction Projects Using Preliminary Feasibility Analysis Data (예비타당성조사 결과를 활용한 도로건설사업의 계획단계 성과 분석 연구)

  • Mun, Junbu;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.3-11
    • /
    • 2023
  • According to the post evaluation scheme in Korea of a public construction project which is more than 30 Billion KRW, project performance is evaluated by investigating outcomes and effects of the construction after the completion of the project. The current post evaluation results can be used for planning and estimating a construction project in the future. However, it is not easy to utilized for an on-going project because the system does not provide the phase-based performance of a project. Although project planning performance is important for project initiation, few attempt has been made to evaluate planning performance in Korea. The purpose of this study is to provide a conceptual performance evaluation of planning performance using preliminary feasibility study conducted by Korea Development Institute. This study developed a planning performance database using data extracted from preliminary feasibility study reports of the completed 354 road construction projects. This study analyzed the performance of the planning stage of road projects by developing absolute metrics such as standard construction cost and standard construction schedule based on a Lane-Km. Using the standard construction cost and schedule metrics, the planning performance was analyzed by project characteristics. The results of this study can be used for phase-based performance evaluation from planning phase to construction phase.

Economic Feasibility Analysis for Introducing Integrated Management System for Supporting Underground Construction (지하구조물건설 현장지원 통합관리시스템 도입을 위한 경제적 타당성 분석)

  • Baek, Hyeon Gi;Jang, Yong Gu;Seo, Jong Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.5D
    • /
    • pp.513-522
    • /
    • 2010
  • Underground construction for traffic networks, complexes, and storage facilities has risen as an effective land use plan for dealing with emerging problems such as overcrowded urban cities and traffic jams. This paper performed an economic feasibility analysis of the development of the integrated field management system which provides field workers and managers with 3D-based location tracking and clear communication during underground construction works. To conduct the analysis, processes and problems of field management for underground construction were analyzed and deduction in accidents and field management costs and productivity improvement were estimated as expected benefits. Based on computed benefits and costs, an economic analysis was conducted using Benefit/Cost ratio(B/C), Net Present Value(NPV), and Internal Rate of Return(IRR) and then sensitivity analysis was performed to cope with the uncertainty of assumed variables.

Thermal Effect of Guss Asphalt on Upper Steel Deck of Youngjong Grand Bridge (영종대교 상로도로 강상판의 구스아스팔트 열영향)

  • Lee, Wan-Hoon;Lee, Myeong-Jae
    • International Journal of Highway Engineering
    • /
    • v.4 no.1 s.11
    • /
    • pp.171-181
    • /
    • 2002
  • Guss asphalt used in pavement of a steel deck bridge may cause severe stress and displacement on the bridge as it is treated using very high temperatures ranging from 220oC to 260cC. Therefore, it is critical to estimate the thermal effect of Guss asphalt on the steel deck bridge before the width and pattern of the unit portion are decided in order to minimize impact. In this study, we have conducted a series of numerical analysis of the upper road of Youngjong Grand Bridge, verified the feasibility of numerical value analysis by comparing the results with the data measured, and studied the thermal effects of Guss asphalt on the steel deck bridge according to temperature changes.

  • PDF

The Measurement and Analysis Techniques of Total Project Productivity on Transportation Projects (도로 건설 공사의 총 프로젝트 생산성 측정 및 분석 기법)

  • Lee Seung-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.95-100
    • /
    • 2004
  • 본 논문은 도로 건설 공사 프로젝트들의 전 공정에 걸쳐 수행되는 모든 작업들을 대상으로 총 프로젝트 생산성 (Total Project Productivity)을 측정하고 분석하기 위한 방법을 소개한다. 측정 방법의 주안점은 복합적으로 병행되는 작업들의 생산량을 통합하여, 프로젝트 전체에 대한 포괄적인 생산성 값들을 구하는 방법을 개발하는데 두고 있다. 이 방법을 통해 Florida Department of Transportation (FDOT)로부터 발주된 세 개의 실제 고속도로 건설 공사 프로젝트들로부터 수천 개의 총 프로젝트 생산성 데이터 값들이 얻어졌으며. 이를 바탕으로 프로젝트 생산성을 분석하기 위한 방법의 타당성 검증이 이루어졌다. 그 결과로, 프로젝트 레벨에서의 총 생산성은 건설 작업들에 관한 현장 자료를 바탕으로 측정과 분석이 이루어질 수 있음이 입증되었다.

  • PDF

Non-Contact Material Recognition from Test-bench using Reflected Signal from Active Sound Wave and Machine Learning (능동 음파의 반사 신호와 기계학습을 이용한 테스트 벤치에서의 비접촉기반 재질 인식)

  • Min-Hyun Kim;Jihoon Kang;Joongeun Jung
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2023.11a
    • /
    • pp.506-508
    • /
    • 2023
  • 비접촉 음파 센서와 기계학습을 결합하여 도로 표면의 투명한 블랙아이스 감지 및 노면 분류 97%의 정확도를 달성한 새로운 접근 방법을 제안한다. 개발된 시스템은 블랙아이스를 포함한 다양한 물질의 반사 특성을 분석하여 미끄러운 도로 상황을 실시간 감지 및 예측이 가능하여 도로 안정성을 향상한다. 본 연구에서는 테스트 벤치와 투명하고 미끄러운 물질을 이용하여 블랙아이스를 감지할 수 있는 기술의 정확도를 비교하며, 실험 결과를 통해 제안된 블랙아이스 감지 방법의 타당성을 입증하고자 한다.

Evaluation of Congestion-Reduction Benefits from ITS User Services in a Freeway Corridor near Seoul City (ITS를 통한 돌발적 교통정체 저감효과 분석 -경부고속도로를 중심으로-)

  • 이시복;이상건;박진호
    • Journal of Korean Society of Transportation
    • /
    • v.16 no.2
    • /
    • pp.37-51
    • /
    • 1998
  • 본 연구는 수도권 남부의 일부지역을 대상으로 시뮬레이션 기법을 이용하여 ITS 서비스 도입효과를 분석함으로써 그 잠재력을 타진해 보고, 특정 ITS 서비스 도입전의 타당성조사에 활용 가능한 시뮬레이션 분석의 사례를 제시하는 것이 목적이다. 본 연구에서는 ITS의 핵심분야인 교통관리(ATMS)와 교통정보제공(ATIS)의 일부 서비스를 중심으로 분석을 실시하였으며, 대상지역에 대한 분석결과에 의하면 ITS 서비스는 그 효과면에서 잠재력이 있는 것으로 파악되었다. 개별 서비스 중에서는 직접적으로 혼잡구간의 수요를 억제하는 램프미터링이 가장 높은 효과를 보였으며, 여러 서비스를 조합하여 실시하는 경우, 혼잡지점에 대한 정보제공은 선별적으로 실시하는 것이 효과적인 것으로 분석되었다. ITS 서비스가 보다 큰 효과를 발휘할 수 있는 경우는 첨두시와 같이 돌발상황이 발생하는 도로가 혼잡하되, 주변의 대안도로가 충분히 확보되어 있고 어느 정도 용량 여유분이 있을 때인 것으로 분석되었다. 본 연구에서 수행한 시뮬레이션 분석 과정은 특정지역의 ITS서비스 도입여부 결정, 도로시설 등의 구축/운영 여건 평가, 서비스 제공전략 도출 등에 활용 가능하므로 ITS 구축사업 착수 이전에 대상지역에 대한 타당성조사 작업의 일부로서 포함될 수 있을 것이다. 따라서 시뮬레이션 모형을 이용한 평가의 과정 및 각 과정별 분석기법을 체계화된 틀로 정립하는 것이 필요하다.

  • PDF

Validity Analysis of the Fine Particle Emission Calculating by Cars (자동차 미세먼지 배출량 산정의 타당성 분석)

  • Lee, Im Hack;Kim, Jin Sik;Lee, Seungjae;Kim, Shin Do
    • Applied Chemistry for Engineering
    • /
    • v.25 no.2
    • /
    • pp.222-226
    • /
    • 2014
  • In this study, the purposes are investigating and analyzing car emission factors for estimating road emissions and the legal framework for the control of particulate matters. At the result, when input emission data are not realistic, the modeling output concentration distributions can lead to a serious distortion of the results. So, the spatial analysis of the dust emission vehicles have to be based on the actual traffic volumes. Because dust emission factors used in the car by National Institute of Environmental Research Method (2010) are mainly targeted for 2003-2007 cars these could not reflect the effect of DPF and the dust emission of gasoline passenger car. So, the real dust emission factors of diesel and gasoline cars need to be developed.