• Title/Summary/Keyword: 도로구조 안정성

Search Result 135, Processing Time 0.023 seconds

Support Modular System for Sustainable-Perpetual-Modular Road (지속가능한 장수명 모듈러 도로를 위한 지지 모듈러 시스템)

  • Donggyou Kim
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.1
    • /
    • pp.37-44
    • /
    • 2023
  • In this study, the performance of the support modular system, as substructure of the proposed sustainable-perpetual modular road system to reduce road construction time and maintenance costs was evaluated. A modular road system consisting of 4 support modular cross-beams with a lower curved surface was constructed on the test-bed. Six load cells and eight LVDTs were installed in the center part of two cross-beam support modular systems. Two loads, 50kN and 100kN, were applied to 15 points on the pavement slab to measure the load and displacement occurring in the modular road system. The measured displacements were less than 1 mm, so it is considered that there was no problem in the stability of the actual road. When comparing the two applied loads and the measured loads in the field test, it was considered that the load transmitted to the ground under the support modular system is very small. It is considered that the modular road system with the support modular system is applicable to the actual road site.

고속도로 절토사면 자료관리 프로그램 개발

  • 유병옥;황영철
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2001.03a
    • /
    • pp.204-218
    • /
    • 2001
  • 절토사면은 토층, 풍화토, 풍화암, 연암, 경암 등의 풍화도가 다른 물질로 구성되어 있어 지반구성 물질에 대한 공학적인 판단이 쉽지 않으며 시공 중 또는 후에 사면의 안정성 문제가 대두되고 있는 실정이다. 사면의 안정성 문제는 과거 30여 년 동안 고속도로의 많은 절토사면에서 경험되어 왔으며 현재에도 계속적으로 사면붕괴 및 복구를 경험하고 있으나 체계적인 관리 및 조사가 이루어지지 않고 있다. 따라서, 본 연구는 절토사면의 체계적인 관리체계의 구축과 효율적인 자료분석을 위하여 사면관리용 데이터베이스 프로그램을 개발하였다. 이들 관리프로그램을 활용한다면 국내에 분포하는 암반의 내적 요인들에 대한 지질 공학적인 특성을 파악할 수 있으며 지역에 따라 분포하는 암석종류, 지질시대 및 지질구조에 따라 붕괴유형 및 발생빈도 등을 분석함으로써 도로 및 주택단지의 개설시 예비적인 사면안정문제를 예견할 수 있을 것으로 판단된다.

  • PDF

A Experimental Study on the Structural Performance of Precast Bracket under Precast Road Deck Slab of Double Deck Tunnel (복층터널에서 도로용 중간슬래브와 연결되는 조립식 브라켓의 구조성능에 관한 실험연구)

  • Kim, Bo Yeon;Lee, Doo Sung;Kim, Tae Kyun;Kim, Young Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.4
    • /
    • pp.647-657
    • /
    • 2017
  • The main purpose of this study is to investigate the static & dynamic behavior of a precast bracket under precast road deck slab of double deck tunnel. In order to improve the construction speed, the field prefabricated bracket to connect the intermediate slab to the precast shield tunnel lining structure has been developed in the 'SPC (Steel Precast Concrete) bracket'. The experiments were performed for the full scale model in order to evaluate the performance of the 'SPC bracket', the structural stability was verified through the FEM analysis. The result of static loading test, no deformations or cracks of the bracket undergo the ultimate load was investigated. In addition, no pulling or deformation of the chemical anchor for fixing the bracket was measured. As a result of dynamic loading test, it was investigated that there is no problem in the chemical anchor for fixing the bracket. FEM analysis showed similar behavior to static load test and it was determined that there is no problem in serviceability and structural safety.

Revision of Repair Materials Performance Requirement for Concrete Structures (콘크리트 구조물 단면복구공사 보수재료 품질기준개선)

  • Lee, Il Keun;Kim, Ki Hwan;Kim, Hong Sam;Yun, Sung Hwan;Kim, Woo Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.9-20
    • /
    • 2023
  • For highway concrete structures, the deterioration of the structure is accelerated due to the increase in the use of deicing materials, and sectional repair work is being frequently carried out to restore performance. However, after the repair work, re-damage such as cracks, delamination, and poor bond performance is exhibited in the repaired sectional area. In this study, overseas repair material requirements were first analyzed, and present domestic requirements were improved repair material performance through field surveys of common concrete structures, laboratory experiments, and test construction on a disused concrete bridge. In addition, performancebased quality requirements were presented so that all materials that meet the required performance can be applied, and different test methods for each material were unified into concrete test methods for consistent test results analysis. The considered performance requirements were compression strength, bending strength, and bond strength for structural properties, and length change rate, crack resistance, thermal expansion coefficient, and elasticity coefficient were for dimensional behavior. For resistance to chloride penetration resistance and freeze-thaw resistance were presented as durability. The proposed requirements for concrete repair materials are expected to contribute to the improvement of the quality of concrete sectional repair work in Korea.

A comparative study on the stability evaluation of double deck tunnel in terms of excavation (대심도 복층터널에 대한 굴착 안정성 평가 비교 연구)

  • Jang, Namju;Gang, Han-gil;Kim, Kihwan;Choi, Chang-rim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.155-166
    • /
    • 2019
  • It is necessary to construct underground in the metropolis. Road traffic has reached saturation point. The city has several underground road construction projects. In abroad, double deck tunnels are planned and constructed. It is attained a high level of underground development technology. In case the double deck tunnel (2 lane) is planed instead of the bidirectional tunnel (2 lane), excavation area is similar. But tunnel width is decreased. The reduced width can cut cost for the tunnel reinforcement. This study evaluates the stability of excavation on double deck tunnel. By the assessment of the strength-stress ratio and strength reduction method, quantitative analysis is conducted between double deck tunnel and the bidirectional tunnel.

A Study on Digital Road Map for Vehicle Navigation(I) (자동차 항법용 수치도로지도에 관한 연구(I))

  • Kim, Yong-Il;Pyeon, Mu-Wook
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.2 no.2 s.4
    • /
    • pp.89-98
    • /
    • 1994
  • Digital road map - which plays an essential role in giving accurate location of the vehicle, optimum route guidance, destination searching, and topographic feature query functions - is the most fundamental element of the vehicle navigation system. Unfortunately, there is not a nation-wide digital map in Korea such as U.S. TIGER fie, that is easily applied to digital road database production. Therefore, producing new digital road map is inevitable in Korea For establishing digital road map for vehicle navigation, this paper puts forth the necessary condition to stabilize the digital road map qualify, and to keep up the compatibility and the economical use. As a result, the standards of coordinate and map accuracy arc presented, and the Items and the structures of database arc decided.

  • PDF

Performance Based Design codes and Examples (성능 기반 설계 코드와 예시)

  • Kong, Jung-Sik;Lee, Hak;Lee, Do-Hyung;Park, Sun-Kyoo;Park, Dae-Hyo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.11a
    • /
    • pp.921-924
    • /
    • 2006
  • 현재 국내에서는 기존에 사용되었던 안정성 위주인 사양중심의 설계(prescriptive code)에서 구조물의 성능을 고려하여, 인명피해 뿐 아니라 구조물의 기능도 설계의 감안요소로 하는 성능 기반 설계기준(Performance-based design)이 도입되고 있는 추세이다. 본 연구에서는 일본 토목학회(JSCE), 캘리포니아 도로연방국(Caltrans), 유럽코드(Eurocode 8), 뉴질랜드 교량설계(NZ code)에서 어떤 식으로 성능기반 설계기준을 제시하고 있으며, 각 국가 간의 성능(performance)과 레벨(performance level)에 대한 접근 방식을 비교하고 국내의 성능기반 설계 도입의 필요성에 대해 논하는데 그 목적이 있다.

  • PDF

Study on Determination of Proper Pillar Width in Road Tunnel Design Stage (도로터널에서 적정한 필라폭 산정에 관한 연구)

  • Yang, Tae-Seon;Kim, Jae-Kyoung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.5
    • /
    • pp.187-194
    • /
    • 2010
  • As the design of the pillar width (PW) of the parallel tunnels in downtown area, in which are located in plains zone with deep alluvium compared with mountain tunnels, is directly related with pre-compensation payment and costs of the underground area, it has to be planned as to keep minimum distance while securing the stability of the parallel tunnels. Although PW of downtown road tunnel in Korea is standardized as 1.5D(D: diameter of the tunnels), PW sometimes has to be reduced within 1.5D to adjust the tunnel lines to the city plan in the cases of the inlet and outlet of the tunnels. In this paper, the design and the analyses of optimum PW of the NATM type road tunnel in the downtown area are introduced. The relationship among the tunnel line planning and underground compensation fee, and ground characteristics are evaluated. In the determination of PW distance, the numerical analyses of underground road tunnels were performed, including the use of the strength decrease method and strength/stress ratio method. In the cases of inlet and outlet part of the tunnels where the stability of the pillars is poor due to contiguous construction of the parallel tunnels, the reinforcement methods are recommended for securing the stability. Numerical verification was performed for the reinforcement proposed.

Effects of Geological Structures on Slope Stability : An Example from the Northwestern Part of Daegu, Korea (퇴적암 내의 지질구조가 비탈면 안정성에 미치는 영향 : 대구 북서부 지역의 예)

  • Ko, Kyoung-Tae;Choi, Jin-Hyuck;Kim, Young-Seog
    • The Journal of Engineering Geology
    • /
    • v.22 no.1
    • /
    • pp.1-13
    • /
    • 2012
  • The purpose of this work is to gain a better understanding of the interrelationships between geological structures and slope failure in sedimentary rocks. In the studied slopes, construction-related slope failure could only be observed on the south-dipping slopes. This indicates that slope stability may be dependent on the angular relationships between the dip direction of bedding and the orientation of the slope. Slope failure continued, post-construction, around large fault zones in the studied outcrop; these fault damage zones are, however, not easily recognized in the field. Here we suggest a new method that uses accumulated fracture density to precisely identify fault damage zones. Multiple-faced slopes are now increasingly being exposed during large-scale construction projects in South Korea. This multiple-faced slope analysis indicates that the stability of a slope should be evaluated by identifying domains, through the analysis of possible slopes and their angular relationships with bedding and other discontinuities, prior to construction. Therefore, careful consideration of geological structures such as bedding and other discontinuities, and their angular relationships during the design of cuttings through sedimentary rocks, will increase the efficiency of construction and enable the safe construction of more stable slopes that will retain their stability after construction.

Slope Stability Analysis and Suggestion of Stabilization Methods on Failed Cut-Slopes Interbedded with Weakness Layer (연약층이 협재된 절개면의 안정성 해석 및 대책)

  • 구호본;이대영;김학준
    • The Journal of Engineering Geology
    • /
    • v.13 no.2
    • /
    • pp.157-170
    • /
    • 2003
  • This study is performed to investigate the cause of slope failure and to suggest suitable stabilization methods for the failed rock slopes. The slope which is located along the national highway between Maesan and Kakok in Dangjin-gun failed during the construction of roads. Site investigation, drilling program, field measurements, rainfall records, and stability analyses are used to investigate the cause of the slope failure. The problem determining the cut-slope angle based on the existing design manual for the construction of roads is reviewed based on the case history given in this paper. If weakness layer and geological structures such as folds and faults are developed in a slope, slope failure is possible even though the direction of slope and the direction of discontinuities depart more than $30^{\circ}$.