• Title/Summary/Keyword: 도로공사

Search Result 984, Processing Time 0.029 seconds

Efficient Construction Method of Topographic Data for Flood Mapping Using Digital Map (수치지형도를 활용한 홍수지도 제작용 지형자료의 효과적인 구축방법 연구)

  • Lee, Geun-Sang;Koh, Deuk-Koo;Kim, Woo-Gu
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.7 no.1
    • /
    • pp.52-61
    • /
    • 2004
  • Korea Water Resources Corporation carried out LiDAR survey to construct detailed terrain data for flood mapping and it is expected that much money is required in flood mapping of all over the country. Therefore, it is desirable to use NGIS digital map to construct preliminary modelling data for selection of flood mapping area. And the analysis of DEM error with respect to scale of digital map is necessary for the sake of applying digital map as the input data of flood mapping. We compared DEM from digital map with DEM from LiDAR survey. Especially we analyzed DEM error characteristics that is occurred with respect to the interpolation method that is used to construct DEM from TIN of digital map. As a result of analysis, digital map(1:1,000) showed smaller error than digital map(1:5,000) and DEM applying linear interpolation showed smaller error than DEM applying quintic interpolation. Especially, variation of DEM error by cell resolution was evaluated as very slight because urban district was composed of gentle slope.

  • PDF

An Effectiveness Analysis of Pilot Enforcement for Overweight Vehicles(Trucks) using High-Speed Weigh-In-Motion System (고속 축중기를 이용한 고속도로 과적 시범단속 시행효과 분석)

  • Choi, Yoon-Hyuk;Kwon, Soon-Min;Park, Min-Seok
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.15 no.2
    • /
    • pp.63-73
    • /
    • 2016
  • On January 16 to May 31, 2012, Korea Expressway Corporation was carried out an pilot overweight enforcement using high-speed weigh-in-motion at Gyeongbu expressway 195.0k (Gimcheon) and Jungbunaeryuk expressway 119.5k (Seonsan). In this study, it is attempted to analyze the practical effect of high-speed weigh-in-motion by comparing the average total weight and traffic volume of eight weeks before and after the these overweight enforcement, respectively. The main results are as follows: First, the result of analysis of the change in average total weight and traffic volume, it was found that it did not differ after as in previous traffic volume, and the total weight is reduced. This means that the total weight is not reduced by decreasing freight traffic, but by decreasing the total weight. Therefore, it can be seen that there is an effect of pilot overweight enforcement using high-speed weigh-in-motion. Second, the average total weight and total weekly traffic volume decreased rapidly starting from the start of the overweight enforcement, but there was showing a tendency to increase gradually again.

Application of Strength Reduction Method to Evaluation of Pillar Safety Factor in very Closely Spaced Tunnels (근접병설터널에서 필라부 안전율 평가를 위한 강도감소법의 적용성 연구)

  • Jun, Sung-Kwon;Yoon, Dong-Ho;Song, Jae-Joon;Kim, Se Hyung
    • Tunnel and Underground Space
    • /
    • v.29 no.5
    • /
    • pp.346-355
    • /
    • 2019
  • When evaluating pillar stability in very closely spaced tunnels, a local safety factor (strength/stress ratio) at the minimum width has been widely used. Tension bolts have been frequently applied as reinforcement for the cases where safety factors are less than 1.0 from FEM stress analysis. However, the local safety factor shows a constant value irrespective of the change in pillar width/tunnel diameter (PW/D) and the safety factor of the pillar is underestimated because the variation of deviation stress is relatively small even when the pre-stressing is applied to the tension bolt. In addition, the average safety factor proposed by Hoek and Brown(1980) was reviewed, but the pillar safety factor was relatively overestimated when the width of the pillar was increased. As an alternative, the SRM safety factor using shear strength reduction method shows the effect of changing the safety factor in the case of no reinforcement and tension bolt reinforcement as the pillar width/tunnel diameter(PW/D) changes. The failure shape is also similar to the previous limit theory result. In this study, the safety factor was evaluated without considering rock bolt and shotcrete to distinguish reinforcing effect of tension bolt.

Tire/road Noise Characteristics of General Asphalt Pavement (일반 아스팔트포장의 타이어/노면 소음 특성)

  • Yoo, In-Kyoon;Lee, Su-Hyung;Han, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.4
    • /
    • pp.175-182
    • /
    • 2021
  • As road noise became an issue, low-noise pavement (LNP) has emerged. The noise difference from general asphalt pavement (GAP) is a measure to explain the noise reduction of LNP. On the other hand, even for GAP, noise varies with the performance years (PY) and pavement condition. This study evaluated the representative noise value (RNV) by the speed and PY of GAP. Sections of 49selected from the National Road Pavement Management System, and the noise was measured at speeds from 50km/h to 80km/h at every 10km/h using the Close Proximity Method (CPX). Because the noise immediately after construction differed from the other, it was treated separately, and some outliers were removed. The noise increased with increasing PY. In addition, the noise increase by speed showed a reliable trend at all noise levels. The RNV for each speed and PY was obtained through analyses of the PY and speed. The average noise difference between the initial construction and the six-year-paced pavement was approximately 6dB. When evaluating the noise reduction of LNP, it is necessary to use RNV rather than the noise of old pavement. The RNV of GAP is necessary for a relative comparison with LNP and studying the road noise characteristics for each GAP type.

Material Characteristics, Provenance Interpretation and Deterioration Diagnosis of Shilla Stone Monuments in Jungseongri and Naengsuri, Pohang (포항 중성리신라비와 영일 냉수리신라비의 재질특성과 산지해석 및 훼손도 진단)

  • Lee, Myeong Seong;Han, Min Su;Kim, Jae Hwan;Kim, Sa Dug
    • Korean Journal of Heritage: History & Science
    • /
    • v.43 no.3
    • /
    • pp.122-143
    • /
    • 2010
  • The Shilla Stone Monument in Jungseongri was found during the road-construction in Pohang. It has approximately two hundreds of letters inscribed on the surface of one side, and it is estimated to be older than Shilla Stone Monument in Naengsuri which had been known for the oldest stele in Shilla Period. This monument is made of fine to medium-grained biotite granite, while the Shilla Stone Monument in Naengsuri is made of fine-grained granodioritic porphyry bearing feldspar and amphibole phenocrysts. Both rock types of the monuments are interpreted to be cognate with biotite granite in Shinkwangmyeon, and with granodioritic porphyry in Gigyemyeon. They are characterized by xenolith and miarolitic cavity. Damage aspects in both monuments are discoloring, cracking and breaking. These damages do not cause structural instability of the monuments, but attenuate aesthetic value. Black and brown discoloring contaminants on the surface of the Jungseongri Monument contain a high amount of manganese and iron. As a result of ultrasonic test, both monuments were evaluated to be medium-weathered (MW), although the velocity of the Shilla Monument in Jungseongri was slightly lower than the Shilla Monument in Naengsuri. This is because the Monument in Juengseongri had been exposed to outdoor environment for long time until the discovery. It is necessary for Shilla Monuments to be protected by appropriately environmental control and management.

A study on structural performance of steel brackets in vertical shaft connected to double-deck tunnel (복층터널 연결 수직구용 철재브래킷 구조성능 연구)

  • Shin, Young-Wan;Min, Byeong-Heon;Nam, Jung-Bong;Lee, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.3
    • /
    • pp.363-375
    • /
    • 2019
  • Since the double-deck tunnel is deeply constructed in the city, it is necessary to secure the installation space of air supply and exhaust, escape passage stairs, elevator, distribution facilities and connection tunnels in the vertical shaft for the double-deck tunnel. Also, in order to minimize the effect of construction on adjacent area, it is necessary to construct the concrete structures at high speed in vertical shaft after tunnel excavation. Therefore, the slabs and the stairs in vertical shaft are needed to be constructed using precast concrete, and the rapid construction techniques of bracket for supporting the inner precast structure are needed. The bracket installation methods include cast-in-place concrete, precast concrete and steel. In this study, the improvement of the steel brackets with good economical efficiency and good workability was carried out in consideration of the improvement of the construction speed. We have developed a new bracket that is optimized through bracket shape improvement, anchor bolt position adjustment and quantity optimization. As a result of the structural performance test, it was confirmed that the required load supporting capacity was secured. As a result of structural performance test for bar type anchor bolt and bent anchor anchor bolt, it was confirmed that the required load carrying capacity was secured and that the load bearing capacity of bent anchor bolt was large.

Examination of Allowable Displacement by Structural Analysis of IPM Bridge (토압분리형 교량의 구조해석을 통한 허용 변위량 검토)

  • Kim, Hong-Bae;Han, Heui-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.4
    • /
    • pp.534-544
    • /
    • 2019
  • Because the pile-bent of IPM Bridge is projected from the soil surface, excessive displacement of abutment can be induced. According to design guide of IPM Bridge, the shape of the bridges used in this study was applied to the maximum applicable 120.0m span, 30-degree for skew angle, and 10.0m for the protruded pile-bent height. The maximum displacement by the maximum span application condition of the IPM Bridge was calculated using this bridge model, and the safety of a horizontal displacement of the IPM Bridge was investigated based on the allowable displacement presented by Bozozuk. The maximum horizontal displacement of the IPM Bridge was calculated to be larger in the winter shrinkage condition than in the summer expansion condition, the horizontal displacements were more affected by the length of a bridge than by the skew angle. And the vertical displacement was not affected by the skew angle and length. As the span increases, the horizontal displacement increases significantly, the horizontal displacement at 120.0m span length was found to exceed the allowable displacement proposed by Bozozuk. However, the moment generated in the pile-bent did not exceed the plastic moment.

Hardness and Rebound Properties of Sprayed Green Soil Produced with Functional Additives for the Application to Steep Slopes (기능성 첨가재를 적용한 급경사면용 녹생토의 경도 및 리바운드 특성)

  • Lee, Byung-Jae;Kim, Hyo-Jung;Kim, Yun-Yung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.258-264
    • /
    • 2018
  • In this study, the improved performance of sprayed green soil was evaluated by incorporating functional additives. The optimal mixing ratio of the thickener and super-absorbent polymer, as an additive for moisture supply to the growth of plants within the range of mixing ratios that gives sufficient strength of green soil, was 5% and 1%, respectively. Using Portland cement as a main binder, the pH of the green soil was 9.1. To solve this alkali problem, the mixing proportion was improved so that the pH of the green soil was approximately 7.2 by mixing more than 10% of the chelate resin. The soil conductivity was measured to be 280 ~ 350mS/m under all the mixing conditions. This satisfied the criterion of less than 1000mS/m on the slope surface. As a result of measuring the soil hardness of the green soil prepared under the optimal mixing conditions of functional additives, it satisfied the criteria of 18 ~ 23mm when sprayed under a 1 bar pressure. The rebound rate was less than 15% when spraying green soil on a 75 % slope, and the hardness of the sprayed green soil was more than 18 mm.

Reserch On The Fundamental Technology To Utilization Of Platform To Providing Mobile Underground Geospatial Infomation Map (모바일용 지하공간통합지도 제공 플랫폼 활용을 위한 기반 기술 연구)

  • LEE, Tae-Hyung;KIM, Hyun-Woo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.23 no.4
    • /
    • pp.173-183
    • /
    • 2020
  • In the midst of the aging of underground facilities in urban areas and anxiety about road excavation safety accidents, the Ministry of Land, Infrastructure and Transport began to build Underground Geospatial Infomation Map from 2015 as part of the 「ground subsidence prevention measures」 and efficient use of underground spaces. So, the scope is spreading every year. The current Underground Geospatial Infomation Map information is web-based and is operated in a desktop environment, so it is true that there are some limitations in its use in a field environment such as an excavation construction site. The Underground Geospatial Infomation Map, built and operated in a web-based environment, is a large-scale 3D data. Therefore, in order to service by transmitting data to the field without delay, it is necessary to lighten the Underground Geospatial Infomation Map data. In addition, the current Underground Geospatial Infomation Map is not unified in data formats such as 3DS and COLLADA, and the coordinate system method is also different in relative coordinates and absolute coordinates. In this study, by analyzing domestic and overseas prior research and technical use cases, a mobile Underground Geospatial Infomation Map data format and a lightweight method were presented, and a technology development was conducted to create a mobile underground space integration map in the presented format. In addition, the weight reduction rate was tested by applying 3D data compression technology so that data can be transmitted quickly in the field, and technology was developed that can be used by decompressing 3D data compressed in the field. finally, it aims to supplement the technology experimentally developed in this study and conduct additional research to produce it as software that can be used in the excavation site and use it.

Improvement of Adjusted Funds according to Border Adjustment Method on Cadastral Reform Project (경계설정에 따른 지적재조사의 조정금 개선방안 연구)

  • Yoo, Mi-Young;Choi, Yun-Soo;Choi, Han-Young;Park, Moon-Jae
    • Journal of Cadastre & Land InformatiX
    • /
    • v.50 no.2
    • /
    • pp.117-132
    • /
    • 2020
  • The study studied ways to improve the adjustment of the cadastral reform project after analyzing and evaluating the method of determining the boundaries and the overall status of the adjustment, focusing on cases of complaints in the business district in Sejong City, where the re-investigation project was completed. Measures to improve the adjustment amount of the cadastral reform project were largely divided into boundary adjustment and improvement measures according to the scope of area allowance and institutional improvement. According to an analysis of the status of boundary adjustment in Sejong City, the boundary of the cadastral reform project was being adjusted in various ways, and among them, it was found that it is simple to adjust, to formalize parcels, and that many adjustments are being made centering on resolving blind areas by establishing new roads. When setting such a boundary, it is necessary to establish an efficient and reasonable boundary by actively encouraging sufficient consultation with owners and an adjustment boundary that reflects the personal will of landowners to minimize disputes over the adjustment amount. In terms of improvement measures based on the area limit, it is necessary to accurately record and preserve the results of the cadastral resurvey in numerical data and to ease or exempt the adjustment amount if it is within the area permissible scope of the Spatial Data Management Act when calculating the adjustment amount. Finally, in relation to the adjustment, it was judged that it would be necessary to provide long-term low-interest loans to their own land to landowners, and that it would be necessary to calculate the adjustment through appraisal calculated by third parties fairly and objectively based on value judgment.