Standardization of Factors Classification Associated with Cost and Schedule Variations in Road Construction Projects (도로건설공사 공사비·공사기간 증감요인 분류체계 표준화 연구)

  • Mun, Junbu;Lee, Juhui;Baek, Seungwon;Lee, Kangwook;Yun, Sungmin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.821-830
    • /
    • 2023
  • Various studies has tried to unveil causes of cost overrun and schedule delay in the road construction project. However, these causes need standardization due to difference by guidelines, relevant research, and facilities. Therefore, this study identifies and elaborate standard road construction cost and schedule variation factors that can be used in the planning and execution of the project. variation factors have been derived and grouped through literature review and modified and supplemented through expert interview. In addition, the connection with the relevant guidance factors is confirmed and the usability is reviewed by applying actual road construction cases. The factors suggested in this study comprehensively include factors of related guidelines and previous research, more clearly distinguish, support decision making.

A Development of the Design modification function for road construction project Cost management (도로분야 공사비정보 관리를 위한 설계변경 기능 개발)

  • Moon, Jin-Seok;Yoon, Hoi-Su;Kim, Sung-Jin;Han, Choong-Han
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2012.06b
    • /
    • pp.16-17
    • /
    • 2012
  • 국토해양부는 지방국토관리청의 도로공사와 관련하여 발생하는 공사비 정보의 교환 및 공유를 목적으로 작업분류체계 기반의 공사비 관리 항목을 추가하여 전자설계도서 작성 납품 지침을 개정하였다. 이를 반영하고 문제점 개선 및 활성화를 위하여 5개 지방국토관리청에서 관리중인 10개 도로건설공사를 시범적용 사업으로 지정하여 발생하는 공사비 정보를 디지털 수량산출정보로 관리하고 있다. 시범사업을 진행하면서 건설공사에 발생하는 설계변경 업무를 전자화하여 관리하는 기능을 개발하고 추가 적용하였다. 이를 통해 건설사에서 생성한 설계변경 정보를 건설사와 발주처가 동일한 형태로 공사비 정보를 공유 및 관리 가능하도록 하였다.

한진중공업-사능 호평도로현장

  • korea construction safety engineering association
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.37
    • /
    • pp.38-41
    • /
    • 2006
  • 한진중공업에서 시중 중인 남양주시 관내 국도대체 우회도로 사능-호평 도로공사는 서울 지방 국토 관리청에서 발주한 공사로서 국도 46호선 중 경기도 남양주시 진건읍 사능리에서 남양주시 호평동까지의 도로공사이다. 기존도로가 시가지 팽창으로 인해 교통체증이 점차 극심하게 됨에 따라 이를 해소하고 경기북부 및 강원도 지방의 위락시설과 관광시설의 효과적인 접근 및 이동, 호평택지개발 입주민들의 원활한 교통소통을 도모할 목적으로 건설되고 있는 현장을 찾았다.

  • PDF

Economic Analysis of Concrete Panel Replacement of PSC Bridge with Embedded Demountable Shear Connector (매립형 분리식 전단연결재를 적용한 PSC교 콘크리트 바닥판 교체공사의 경제성 분석)

  • Soon-Hwan, Lee;Jong-Eon, Kim;Jae-Gyu, Kim;Se-Hyun, Park;Dae-Sung, Jung
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.10 no.4
    • /
    • pp.376-385
    • /
    • 2022
  • The embedded demountable shear connector was developed in preparation for replacement works due to deterioration and damage to the bridge panel of the PSC girder bridge which is a road infrastructure directly related to the safety and convenience of the people. The demountable shear connector minimizes crushing works in the demolition process of the panel, and it is easy to re-construct the shear connector for replacement work. The economic feasibility of the PSC girder bridge using the embedded demountable shear connector compared to the existing construction method was analyzed from the perspective of road users (people) by calculating and comparing the cost of road users caused by traffic blocking during each construction method.

A Method for the Effective Implementation of a Consignment Contract in Road Constructions (도로 수탁공사의 효과적 수행을 위한 방법론)

  • Bak, Gwon-June;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.2D
    • /
    • pp.153-161
    • /
    • 2010
  • The city planning of a local government is a continuous process that does not end with the creation of a plan but proceeds through decision-making, monitoring and evaluation phases. As a new city planning is changed and confirmed, there is a chance to construct a large scale road that is connected with an under constructed road. In this case, the expansion of the width and length of road, the addition of bridges or tunnels, and the change of the size and location of interchanges lead to many changes on road design and construction. In the past, the consignment contracts for a road construction have been made in limited numbers and for limited civil works. Now, it is growing in numbers and is making for large scale multi-works. However, the standard process and guidelines for the consignment contracts have not been suggested yet, so there is difficulty in performing the consigned road construction effectively. In this paper, the important factors for the consignment contracts are determined by construction document reviews and expert interviews. Based on these results, a standard process for the consigned contracts and a guideline for agreeing on construction cost are suggested. The costs that should be paid by a consignor are also defined.

Comparison of Runoff and Sediment Yield According to Factors to Environmental Change in Mountainous Watersheds (산지유역 환경변화 요인에 따른 유출 및 토사유출 특성 비교)

  • Park, Sang Deog;Shin, Seung Sook;Kim, Seon Jeong;Lee, Jong Seol
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.201-201
    • /
    • 2011
  • 산지유역의 지표 환경이 급격히 교란된 지역에서 집중 호우가 발생하면, 과대한 토사유출로 인해 하천유역 홍수 재해요인으로 작용할 수 있다. 본 연구에서는 산불발생지역, 벌목지역, 도로공사지역과 같이 산지환경이 급변한 지역을 토사유출 시험유역으로 운영하였다. 세 개의 시험유역 중에 지표교란이 심각한 도로공사시험유역에서 강우유출 및 토사유출이 가장 크게 발생하였다. 그림 1은 각 시험유역별 강우강도에 따른 첨두유량 관계를 나타낸 것이다. 또한 산불 후 10년이 경과된 급경사 산불시험유역이 벌목시험유역보다 유출 및 토사유출량이 많았다. 벌목시험유역은 벌목이후 잔류물과 빠른 식생회복으로 지표상태가 빠르게 안정화되어 유출 및 토사유출량이 적게 발생하였다. 도로공사 시험유역 나지사면에서 시행된 사면처리 공법 시공 전 후로 토사유출량의 변화가 현저히 크며(그림 2), 이는 공사를 진행하는 중에 적절한 사면관리 처리를 통한 토사유출량 저감이 필요하다는 것을 나타낸다.

  • PDF

A methodology for an effective utilization of construction equipment for highway construction projects (도로공사 공정계획을 위한 공정 로직 및 건설장비 효율화 방안)

  • Song, Hojeong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.26-34
    • /
    • 2014
  • Highway construction is a combination of linear, repetitive, and highly equipment intensive operations. Various types of construction equipment are deployed to ensure undisrupted performance of construction, and thus productivity improvement and cost-saving can be achieved through well-thought-out planning. The selection of construction equipment is dependent upon construction sequence, site conditions, and construction methods. In the process of planning, management should consider various types of construction methods per each type of construction operation. Also, management should map out proper construction equipment operation plan that takes the construction duration and cost measures into consideration. However, limited availability of historic data from the similar types of operations has been a stumbling block to proper construction planning, making the operations performed based upon experience and intuition guided by rules-of-thumb. As a consequence, the planing phase rarely provided an adequate validity in the implementation phase. The researchers developed a process logic for each construction type that management can utilize from early phase of highway construction planning process. Moreover, derived the construction equipment combination optimized for efficiency by using the process simulation technique. The developed method is expected to be useful for the decision-making process that aims to evaluate efficiency of various process plans and to ensure optimal selection of construction equipment for highway construction projects.

Experimental Study on the Strength of Underground Conduit (통신용 지하매설관의 강도 특성에 관한 연구)

  • Baik Song-Hoon;fang Wang-Kyu;Chung Sung-Tak
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.230-233
    • /
    • 2004
  • 현재 KT의 관로포설 공법은 관 상부 토피 1m를 확보한 상태에서 차량하중이 작용한다는 가정하에서 제정된 것이며, 토피 1m를 확보하지 못하는 구간에는 별도의 보강공법을 적용하고 있다. 그러나 현재 관로공사의 대부분을 차지하는 도로유관공사는 도로 조성이 종료되는 시점에는 토피 1m를 확보하지만, 도로조성 공사기간 중에는 별도의 보강공사 없이 토피 60cm 내외에서 공사 차량의 하중이 관로에 그대로 전달되고 있어 관로의 찌그러짐 현상이 발생하고 있다. 본 논문은 이와 같은 조건에서도 고품질의 관로를 확보하기 위하여 현행 FC관로 뿐만 아니라 지하매설관으로 사용되는 각종 재질의 관에 대한 특성을 검토하였으며 매설관 변형실험을 통하여 도로유관공사에 적합한 관로재질을 제시하였다.