A Study on Analysis of Issues in Developing a Basic Road Transport Database and Proposals for Enhancing Its Reliability and Data Sharing (with Focus on Databases Related to Road Transport Demand Estimation) (도로부문 교통기초자료 구축사업의 문제점 분석 및 개선방안 연구 (교통수요 예측 자료를 중심으로))

  • Lee, Sang-Hyeop;O, Chang-Seok
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.6
    • /
    • pp.55-67
    • /
    • 2009
  • In Korea, previously implemented road construction project caused a big budget waste due to overestimation of transport demand. There could be reasons for such inaccuracy of transport demand estimation, but the main reasons are: (1) low reliability of used basic road transport data and (2) inadequate sharing of data among agencies/departments. The National Transport Database and the Household Travel Database in Seoul Metropolitan Area, two representing basic road transport database, will be used to the establishment of a road construction plan that will be promoted afterwards. However, these materials have problems such as low reliability and inadequateness, too. Hence, focusing on transport demand estimation related databases, this paper will make proposals for enhancing their reliability and data sharing.

The Construction Management Plan of Dong Myoung Service Area (동명휴게소 건설사업관리 수행계획)

  • In Chi-Sung;Kim Jeong-Won;Jung Soon-Gil;Park Gwon-su;Lee Sung-Gak;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.40-47
    • /
    • 2003
  • The main purpose of Construction Management(CM) is the improvement of efficiency and effectiveness of the project with construction methodologies systematically and technically. This pilot project Dong Myeong Service Area and Gas Station project among 5 projects designated and supervised by Ministry of Construction and transportation(MOCT), is to reduce cost, to maintain and control schedule, to keep proper quality, Claim and Risk through Partnering, Design Review, Constructability, Value Engineering and Project Management Information System(PMIS) and so on. Major factors of CM Plan are introduction of the phased and classified Construction Management Services from initiation of project to completion and adaptation of CM technologies and guide the implementation methodologies of the CM Pilot Project in CM construction market.

  • PDF

A Study on the Effects of High Embankment Road on the Microclimatic Environment (고성토 도로의 건설이 미기후 환경에 미치는 영향에 관한 연구)

  • Lim, Ik Hyoun;Hwang, Eui Jin;Ryu, Ji Hyeob
    • Journal of Korean Society of societal Security
    • /
    • v.4 no.1
    • /
    • pp.29-37
    • /
    • 2011
  • Recently, Inhabitants nearby the high embankment road have requested a civil complaint on the environmental deteriorations and economic harms. This study was carried out numerical simulation using the 3-D microclimate model 'Envi-met' in order to investigate the variations of a flow field and a temperature field at the road sections with a high embankment and a bridge. About the simulation of flow field, the wind field has changed due to the disturbance of airflow by a high embankment road considerably. And the wind velocity decreased in the whole of simulation space widely. But, the wind velocity and wind direction sited loose to the section of a bridge, relatively. In the results of a temperature field, the slight variations of temperature field were discovered by the disturb of the mixing flow from a high embankment road. These results indicate that the numerical simulation can provide useful information to minimize the disasters, such as traffic accidents and various microclimatic environments in the transportation projects.

  • PDF

A Study on Utilization of Private Capital for Efficient Highway Pavement Management (효율적인 고속도로 유지관리를 위한 민간자본 활용방안 연구)

  • Lee, Inbum;Lee, Yongjun;Park, Samjae;Cho, Hyunje;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.3-11
    • /
    • 2018
  • In order to find methods to encourage active private participation for efficient road maintenance, this study examined the status of the road improvement project and the development of the private capital utilization improvement project. Based on this, the study conducted a case study and a financial feasibility study that applied the new business method and selected the applicable business method. As a result, it is analyzed that the method of using Crowd Funding is more advantageous than the private scheme of the private capital utilization improvement project. This is because it will be highly effective in raising funds from users of highway users, especially users of improvement projects. In addition, it can also mean that the road users who suffer from inconvenience due to the construction can return the toll profit of road construction to the user.

Formalization of Productivity Metrics for Equipment in Multi-sectioned Road Construction Projects (다(多)공구 도로 공사 현장 장비들의 운영 실태 파악을 위한 생산성 지표 정립에 관한 연구)

  • Kim, Hong-Yeul;Koo, Bon-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.100-109
    • /
    • 2012
  • Large road construction projects are typically partitioned into sections that are then contracted individually to contractors. Each section requires using similar heavy equipment including excavators, dump trucks and pavers, which constitute the highest cost. Normally the equipment is not shared between them, as each contractor wishes to have their equipment readily available. However, such practices result in very low utilization of these equipment. The goal of this research is to develop a programmatic resource sharing system in which contractors can share equipment depending on the changing needs of a multi-sectioned road project. This paper introduces the results of a survey performed to investigate how contractors currently manage the supply and demand of equipment and the equipment that are practical for sharing across a project. More importantly, the paper describes a set of metrics (DPR, nDPR, SDI) needed to quantify the amount of supply/demand variance occurring in each section. The metrics were used on an actual road construction project, and the results show that each section suffers from an imbalance between its monthly planned and actual utilization of equipment. The results also indicate that the sharing of the equipment can lead to potentially large savings as equipment requirements can be met within a project as to short leasing from outside vendors.

Research on the use of BIM for smart construction of Complex Geometry buildings (비정형 건축물의 스마트건설을 위한 BIM 활용에 대한 연구 - 세종포천선 처인휴게소 시공사례)

  • Park, Yang-Heum;Nam, Dong-Hun;Kim, Byung-Soo;Park, Jungjoon;Kim, Sungjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.53-54
    • /
    • 2023
  • Because irregular shaped buildings are designed with various three-dimensional curves, the difficulty of design and construction is very high, and more construction drawings are needed to reduce construction errors. General 2D drawings may have limitations in conveying the information necessary for construction. By utilizing BIM, it is possible to three-dimensionally design parts that are not expressed on 2D drawings and additional structurall components required for the construction of the curved exterior finishing materials. This study examines the necessity of BIM at the construction stage, its performance through it, and how it can be linked to smart construction technology through construction BIM being applied to the new construction site of Sejong-Pocheon Line Cheoin Rest Area.

  • PDF

A Study on the Standardization of Construction Types for the Management of River Project (하천사업 공사관리를 위한 공종 표준화 방안 연구)

  • Jang, Chorok;Jang, Moon Yup;Song, Juil;Kim, Han Tae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.486-486
    • /
    • 2021
  • 국가에서는 수해예방 및 주민들의 삶의 질 향상을 위해 다양한 하천사업을 수행한다. 국토교통부의 경우 매년 막대한 예산을 투입하여 하천정비 및 재해복구사업 등을 추진 중에 있으나, 체계적인 공사관리와 산출물의 전산화를 위한 시스템은 부재한 실정이다. 현재 건설사업정보시스템(건설CALS)을 통해 하천공사에 관한 정보를 확인할 수 있으나 총 공사비, 참여업체 등 기본적인 정보만을 제공하고 있으며, 공정관리 및 예산정보에 관한 상세한 내역을 확인 및 관리할 수 있는 기능은 부재하다. 이러한 문제를 해결하고자 본 연구에서는 하천사업(공사)관리시스템의 필요성을 제시함과 동시에 우선적으로 하천사업 공종 표준화를 수행하고자 한다. 현재 건설공사표준품셈을 통해 건설공사의 공종을 확인할 수 있으나 '제2장 하천공사' 내에는 사석, 돌망태, 하천호안공에 관한 정보만을 담고 있다. 하천공사 공종 표준화를 진행하게 될 경우 공종별 공사 세부정보에 대한 관리가 가능해지며, 현재 하천을 관리 중인 국토교통부, 지방국토관리청 및 지자체 등 하천사업을 수행 중인 기관의 시스템 활용도를 제고할 수 있다. 하천사업 공종표준화를 위해 우선적으로 현재 건설공사표준품셈, 도로대장 전산화 입력지침 등기 수립된 지침 및 기준을 통해 건설토목공사 시의 공종을 조사·분석한 후, 하천공사 준공보고서 및 감리보고서 등 공사 관련 자료를 활용하여 하천공사에 주로 수행되는 공사들에 관한 종류를 도출하였다. 이후 건설토목공사 공종과의 비교·분석을 통해 하천공사에서 주로 수행되는 공종을 도출·표준화하는 작업을 진행하였다. 본 연구에서 제시한 하천사업 공종의 경우 향후 하천사업(공사)관리시스템 개발에 활용이 가능하며, 하천공사 관리의 효율성을 극대화할 수 있다.

  • PDF

A study on the procedure and criteria for the CALS standardization of the electronic documents in the construction industry (건설문서 유형별 전자문서 표준의 적용 방안과 절차에 관한 연구 - 공공 도로건설사업 설계자문회의 제출도서를 중심으로 -)

  • 김승균;김병곤;한충한;최원식;권오룡;오세정
    • Proceedings of the CALSEC Conference
    • /
    • 1999.11a
    • /
    • pp.702-710
    • /
    • 1999
  • ■ 설계자문회의는 설계업체가 설계사상이라는 지식의 틀을 바탕으로 설계조건에 의거하여 시 설 물을 최적으로 설계 하였는지를 심의하는 활동 체계 ■ 설계자문회의 업무흐름 및 제출자료(설계도서) (중략)

  • PDF

Application Method of Big-Data for Improvement for Construction Project Management System (빅 데이터 기반 건설사업정보시스템 기능 개선 방안 연구)

  • Kim, Jin-Uk;Kim, Young-Jin;Ok, Hyun;Yang, Sung-Hoon
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2015.07a
    • /
    • pp.301-303
    • /
    • 2015
  • 국내 건설행정 투명화 및 경쟁력 향상 목적으로 개발된 건설사업정보시스템에 정부와 운영주체는 다양한 기능개선 방안과 관련 연구를 수행하며 시스템 성능을 개선시켜왔다. 그러나 기 추진된 성능향상 방안이 공공업무 처리에 중점 되어 대국민 사용자를 위한 콘텐츠 및 기능 등의 서비스가 미흡한 상황이다. 이에 본 논문에서는 건설사업정보 건설인허가시스템의 도로점용장소별 허가현황 기능을 중심으로 빅 데이터를 이용한 허가현황 정보 제공 방안을 제안하였다. 제안한 기능개선 방안은 기 구축된 비정형 데이터를 빅 데이터 기반으로 재분석하여 구글 맵에 가시화함으로써 공공업무 데이터 처리 뿐만 아니라 대국민 서비스를 위한 콘텐츠 제공이 가능하도록 하였다. 뿐만 아니라 그동안 축적된 15TB이상의 건설관련 데이터의 재활용 가능성을 시사함으로써 시스템 활용성 증대 및 개편 방향에 도움이 될 것으로 판단된다.

  • PDF

The Improvement Plan of Project Management for Highway Construction Supervisor using Construction Management Benchmarking of Developed Countries (선진국의 공사관리 벤치마킹을 통한 도로건설공사 감독자의 공사관리 향상방안)

  • Lee, Min-Woo;Shin, Eun-Young;Lee, Kyo-Sun;Park, Hwan-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.138-148
    • /
    • 2006
  • The construction supervisors of the public companies are usually responsible for process management, quality management, safety management, and many other various tasks that occur during construction project. Public companies such as Korea Highway Corporation have developed a framework and manual for management and supervision of construction projects. But, there has been the change of business environment such as increase of private investment project and the introduce of construction management system recently. It has been necessary for construction supervisor to streamline the current project management system in the owner's aspect in order to cope with the expected new challenges. Accordingly, this research has been investigated and analyzed the operation system between Korean supervisor and foreign supervisor in their public corporation. This research has suggested the advanced project management in their public corporation. Especially, this study has proposed the construction management manual for supervisors such as inspectors training, supervisors construction manual, and supervisors training road map.