• Title/Summary/Keyword: 대기행열이론

Search Result 6, Processing Time 0.015 seconds

Evaluation of the Traffic Congestion in the Passage I of Pusan Harbour due to the Opening of the Extended Terminal adjacent to the Gamman Terminal and Other Port Developments (감만부두 확장구역 개장과 기타 항만개발이 장래 부산 북항에 미치는 해상교통 혼잡도 평가에 관하여)

  • 구자윤;여기태
    • Journal of Korean Port Research
    • /
    • v.14 no.1
    • /
    • pp.27-35
    • /
    • 2000
  • In Pusan Harbour, new port development projects are implemented such as the Extended Terminal adjacent to the Gamman Terminal, Pusan New Port, the Navy $\bigcirc$$\bigcirc$ piers, etc. which will require new marine traffic environments in the Passage I of Pusan Harbour. Specially, the turning basin of the Extended Terminal adjacent to the Gamman Terminal has been designed to overlay the Passage I of Pusan Harbour, which will interrupt the inbound traffic flow and the results will be worried to decrease the efficiency of port operation. Therefore, this paper will be aimed to evaluate the traffic congestion in the Pusan Passage I due to the opening of new ports within Pusan Harbour in 2006 and 2011 by using computer simulation based the queueing theory.

  • PDF

Evaluation of the Traffic Congestion in the Passage I of Pusan Harbour due to the Operning of the Extended Terminal adjacent to the Gamman Terminal and Other Port Developments (감만부두 확장구역 개장과 기타 항만개발이 장래 부산 북항에 미치는 해상교통 혼잡도 평가에 관하여+)

  • 구자윤;여기태
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.91-99
    • /
    • 1999
  • In Pusan Harbour, new port development projects are implemented such as the Extended Terminal adjacent to the Gamman Terminal, Pusan New Port, the Nary $\infty$ piers, etc. which will require new marine traffic environments in the Passage I of Pusan Harbour Specially, the turning basin of the Extended Terminal adjacent to the Gamman Terminal gas been designed to overlay the Passage I of Pusan Harbour, Which will interrupt the inbound traffic flow and the results will be worried to decrease the efficiency of port operation. Therefore, this paper will be aimed to evaluate the traffic congestion in the Pusan Passage I due to the opening of new ports within Pusan Harbour in 2006 and 2011 by using computer simulation based the queueing theory.

A Study on the Operational Utilization Levels of Lock Gates in Inchon Port (인천항 갑문의 운영 수준에 관한 연구)

  • 구자윤
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2002.03a
    • /
    • pp.13-19
    • /
    • 2002
  • In inner harbour of Inchon Port, there are two lock gates (50KT, 10KT) which have two gates per lock gate in inner/outer sides except a gate in inner harbour side 7f 10KT. Due to the lack of the fore-mentioned gate, the use of 10KT lock gate Is suspended in every 3 years for regular maintenance. Now an additional gate is under construction in order to improve the efficiency of the 10KT lock gate. This paper will be aimed to evaluate the operational utilization levels of lock gates in present and future. The present operational utilization levels of lock gates are 0.2119 in 10KT lock gate, 0.2051 in 50KT lock gate which were considered the 46.5 closed days every 3 years for 10KT regular maintenance. The levels are estimated to 0.2246(10KT), 0.2539(50KT) in 2006 and 0.2241(10KT), 0.2560(50KT) in 2011. The levels of 50KT lock gate are evaluated to be more rapidly increased up to 24.5% in 2011.

  • PDF

A Study on the Operational Utilization Levels of Lock Gates in Incheon Port (인천항 갑문의 운영 수준에 관한 연구)

  • Koo, Ja-Yun
    • Journal of Navigation and Port Research
    • /
    • v.26 no.2
    • /
    • pp.177-182
    • /
    • 2002
  • In inner harbour of Incheon port, there are two lock gates (50KT, 10KT) which have two gates per lock gate in inner/outer sides except a gate in inner harbour side of 10KT. Due to the lack of the fore-mentioned gate, the use of 10KT lock gate is suspended in energy 3 years for regular maintenance. Now an additional gate is under construction in order to improve the efficiency of the 10KT lock gate. This paper will be aimed to evaluate the operational utilization levels of lock gates in present and future. The operational utilization levels of lock gates in 1998 are evaluated 0.2119 in 10KT lock gate, 0.2061 in 50KT lock gate which were considered the 46.5 closed days every 3 years for 10KT regular maintenance. The levels are estimated to 0.2246(10KT), 0.2539(50KT0 in 2006 and 0.2241(10KT), 0.2560(50KT) in 2011. The levels of 50KT lock gate in 2011 are evaluated to be more rapidly increased up to 24.5% from the levels in 1998.

A Study on the Optimal Span Width In the Bridge Main Span of Incheon 2nd Bridge (2) Economic Analysis on Port Operational Efficiency according to Traffic Schemes in the Bridge Main Span of Incheon 2nd Bridge (인천항 제2연륙교 주경간의 적정 교각폭 결정에 관한 연구 (2) 제2연륙교 주경간의 통항방식에 따른 항만운영효율의 경제성 분석)

  • Koo Ja-Yun;Kim Seok-Jae;Jang Eun-Kyu
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.11a
    • /
    • pp.337-342
    • /
    • 2004
  • A construction project of Incheon 2nd bridge, which is connected between the Incheon Song-Do New Town and the Incheon International Airport in Young-Jong-Do, have been proposed by the private capital in 1999. But the optimal span width in the bridge main span have not been decided in spite of the three investigations into the feasibility of ship's safe transit in this planned bridge. In this paper, we study the economic analysis on port operational efficiency according to traffic schemes, me-way or two-way of vessels over 10,000G/T, in the bridge main span of this bridge. In this comparative result, total queueing time due to the one-way in the bridge main span is evaluated 20,362 hours in 2011 and 24,544 hours in 2020. Therefore the demurrage cost and the accumulation cost of freight are evaluated 19.7 billion won in 2011, and 23.3 billion won in 2020, then total accumulated costs during 33 years from 2008 until 2040 are evaluated about 768..9 billion won.

  • PDF

A Study on the Optimal Width of the Main Span In the 2nd Bridge of lncheon (2) Economic Analysis on Port Operation according to Traffic Schemes in the Main Span (인천항 제2연륙교 적정 주경간 폭 결정에 관한 연구 (2) 주경간의 통항방식에 따른 항만운영의 경제성 분석)

  • Koo Ja-Yun;Kim Seok- Jae;Jang Eun- Kyu
    • Journal of Navigation and Port Research
    • /
    • v.29 no.1 s.97
    • /
    • pp.65-69
    • /
    • 2005
  • A construction project of Incheon 2nd bridge, which is connected between the Incheon Song-Do New Town and the Incheon International Airport in Young-Jong-Do, has been proposed by the private capital in 1999. But the optimal width of the main span has not been decided in spite of the three investigations into the feasibility of ship's safe transit in this planned bridge. In this paper, we study the economic analysis on port operational efficiency according to traffic schemes, one-way or two-way of vessels over 10,000G/T, in the main span of this bridge. In this comparative result, total queueing time due to the one-way in the bridge main span is evaluated 20,362 hours in 2011 and 24,544 hours in 2020. Therefore the demurrage cost and the accumulation cost of freight are evaluated 19.7 billion won in 2011, and 23.3 billion won in 2020, then total accumulated costs during 33 years from 2008 until 2040 are evaluated about 768.9 billion won.