• Title/Summary/Keyword: 대규모 IT 프로젝트

Search Result 93, Processing Time 0.026 seconds

A Checklist for Assessment of Risks Involved in IT Service Project Contract (IT 서비스 프로젝트 계약서 위험 요인 평가 체크리스트)

  • Jeong, Eun Joo;Jeong, Seung Ryul
    • Journal of Internet Computing and Services
    • /
    • v.15 no.4
    • /
    • pp.57-65
    • /
    • 2014
  • Risk factors are the reason behind cost overruns and delays in long-term large-scale IT service projects. Major risks originate from the integration of complex IT system components, including software, hardware, and solutions; the competitive bidding process; the turnkey and firm-fixed price nature of contracts; and the project execution environment. We have identified several risk factors such as delay in acceptance, low quality of deliverables, delay in payment, adding and changing requirements and scope, unclear definition of roles and responsibilities of the buyer and supplier, and unclear procedures of change and quality management during the project execution phase. One needs to manage risks proactively before signing the contract. In order to weed out or lower the risk factors well in advance, we need to identify and remove risk factors contained in contract clauses and attached contract documents. We propose a checklist for assessing IT service project contracts. To validate the checklist's utility, we applied it to an IT service project in the finance industry. The results show that the checklist is effective in identifying and removing risk factors pertaining to IT service projects.

Modeling the WBS for a Large-Scale IS Development Project (대규모 정보시스템 개발 프로젝트를 위한 작업분담구조도의 모형화에 관한 연구)

  • Lee, Nam-Yong;Kim, Tae-Hyung
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2000.04a
    • /
    • pp.821-829
    • /
    • 2000
  • Over the past decade, the topic of work breakdown structure (WBS) has gained an increasing amount of attention from information technology professionals as an effective tool for managing the complexity of a large-scale information system development project. It is a method for planning and controlling a large-scale information system development. A WBS provides the basis for project organization, cost estimation, task scheduling, and contract management. Based on the authors' practical experience, this paper discusses how to establish a specific WBS and some considerations for developing a well-defined WBS. The model of WBS suggested in this study will provide useful insight and guidelines for establishing the spec-ific WBS for a large-scale information systems development.

  • PDF

What Factors Make the Delay of the Information System Project Implementation? (무엇이 정보시스템 프로젝트 일정을 지연시키는가?)

  • Seoung, Byung Ook;Park, Sang Cheol;Koh, Joon
    • Knowledge Management Research
    • /
    • v.22 no.1
    • /
    • pp.1-19
    • /
    • 2021
  • Large-scaled hospital information system projects are often delayed than originally planned. Regarding project management, it is necessary to examine main factors triggering the schedule delay and to analyze the causality of such delay. This study tries to find the delay factors and causal relationship between them based on the case of the hospital information system development project by using the grounded theory method. It turned out that 'unrealistic scheduling' affects overall schedule delays like domino phenomenon, and 'poor analysis of existing systems' leads to poor quality of work analysis while 'poor subsystem integrated interface' triggers poor design quality. This study found out the factors affecting the delay of a project, analyzing cause-and-effect relationships between them in the academic side. From the practical view, it shows a solution to minimize delays in the project schedule for each of SI companies, hospitals and project managers.

Status and Issues for Underground Space Development in Singapore (싱가포르 지하공간 개발의 현황 및 이슈)

  • Lee, Hee Suk;Zho, Yingxin
    • Tunnel and Underground Space
    • /
    • v.28 no.4
    • /
    • pp.304-324
    • /
    • 2018
  • Singapore government is strongly promoting the development and utilization of underground space in national level due to the nature of the city state which lacks the land. As well as conventional underground utilization in shallow depth such as metro and underground roads, large rock cavern utilization has been started after the successful completion of the underground ammunition depot in the rock, and Jurong Rock Cavern, the second large underground cavern project has just been completed. In this paper, after evaluating the conditions of the underground development in rock mass through the analysis of the geology of Singapore, the history and current status of underground development are examined. Several creative development plans from Singapore government such as underground reservoirs, underground automation logistics systems and underground warehouses storage etc. are introduced with technical issues. This paper also discusses the problems and issues related to the development of large underground space in rock mass in Singapore. It is expected that such active development of underground space in Singapore can give many opportunities and also challenges for rock engineering and industry in the future.

A Case Study on the Prevention of Construction Delays Using the Delay Management Index in Program Level Construction Projects (프로그램 수준 건설사업에서 지연관리지수(Delay Management Index)를 활용한 공사지연 예방 사례연구)

  • Yu, Jun-Hyeok;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.4
    • /
    • pp.347-359
    • /
    • 2021
  • Recently, construction projects have emerged in the form of program management, which is complicated by the large-scale of construction, and requires astronomical construction costs. In particular, projects that absolutely require management at the program level, such as large-scale construction projects, require overall control of the planned schedule and cost as a set of various projects, including infrastructure. But in Korea, there is no specific management standard for delays in construction. In order to avoid the risk of cost increase and project delay in the program-level construction project, it is necessary to apply more systematic management standards to prevent delay and to take a more preemptive response in the construction process. Therefore, in this study, a delay management index (DMI) was developed to successfully carry out large-scale construction projects at the program level and prevent delays in advance. In addition, case studies were conducted for large-scale construction projects, and a delay prevention system was established for program-level construction projects.

An Analysis on Employing Developer Profit Incentive to Expedite Open Source Software Development

  • Sohn, Jung-woo;Ko, Yohan;Yun, Younguk
    • Journal of the Korea Society of Computer and Information
    • /
    • v.27 no.11
    • /
    • pp.257-270
    • /
    • 2022
  • This paper analyzes the effect of profit incentives within the setting of bounty open source project. A simple decision-making model based on classical utility maximization is presented for open source developers that includes income effects from the bounty prize. We then simulate the decisions of multiple developers to assess the effect from the bounty prize. Our result shows that learning costs can greatly reduce the software quality improvement benefit from bounty project. It also suggests that open source projects can benefit more when they have multiple small bounty projects than a single large bounty project since it reduces the learning cost and the opportunity cost for the open source developers.

Evaluation and Analysis of Software Globalization Capability in Korea (국내 소프트웨어의 글로벌화 수준 평가 및 분석)

  • Lee, Seiyoung
    • Journal of Convergence Society for SMB
    • /
    • v.1 no.1
    • /
    • pp.9-17
    • /
    • 2011
  • While software globalization is becoming more important, little research has been undertaken into what is meant by globalization and the degree of globalization capability in the Korean software industry. A survey study was conducted among software engineering professionals, gathering the data from 31 IT companies across 7 large-scale projects in Korea. The results indicate that the evaluation score for globalization capability is 2.51 out of 5 points, which is the lowest compared to other areas of software engineering such as team capability (2.88), process and tool supports (2.96), project management (2.97) and development (3.64). We also discuss how to introduce software globalization technologies in Korea based on the successful experiences of leading global IT companies.

  • PDF

Integration of Korean Energy Management System Functions and Test Cases (한국형 에너지관리 시스템 개발에서의 기능통합 및 시험사례)

  • Kim, Wan-Hong;Park, Min-Ryung;Yoon, Yeo-Jun;Lee, Hyo-Sang
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.71-72
    • /
    • 2008
  • 한국형 에너지관리 시스템 개발 사업은 전력거래소에서 사용하는 현 EMS 설비의 교체수명 주기가 다가오게 되어 새로운 EMS 설비를 순수 국내 전력IT 기술을 통해 개발하는 총 개발기간 5년의 대규모 국가 프로젝트이다. 본 논문에서는 현 Baseline 단계에서의 KEMS 개발내용을 소개하고 기능개발과 관리, 어플리케이션의 통합 및 검증기법 등에 대해 소개하고자 한다.

  • PDF

IT Expert Interview 모바일 RFID

  • Chae, Jong-Seok
    • TTA Journal
    • /
    • s.102
    • /
    • pp.21-24
    • /
    • 2005
  • 우리 국민 10명 중 6명 이상은 '유비쿼터스'가 무엇을 의미하는가를 인지하고 있으며, u사회가 5~10년 내에 현실화될 것으로 내다보고 있다고 한다. 그만큼 우리가 살고있는 현재 e사회는 빠르게 u사회로 변화 발전해 가고 있다. 유비쿼터스로의 발전과정에서 주목받는 기술이 바로 전파식별(RFID)이며, RFID 기술에 주목하는 것은 다가올 디지털 융합, 유비쿼터스 시대의 첨병 역활을 할 것이기 때문이다. 또한 유비쿼터스 세상은 새로운 기술표준을 요구하고 있다. 통합과 호환성이 필요하기 때문이다. 이번 특집은 대규모 수요를 견인할 수 있는 국가적 프로젝트인 '모바일 RFID'의 산업 및 시장 활성화를 위한 표준화, 기술개발 동향 등을 중심으로 현황과 전망에 대해 관련 표준화를 주도하는 '모바일RFID포럼'의 채종석 운영위원장으로부터 들어본다(편집자주).

  • PDF

Design and Implementation of Web-based Information Reporting System for Group Project Management (그룹프로젝트관리 지원을 위한 웹기반 정보보고시스템의 설계 및 구현)

  • Kim, Myong-Ok;Park, Eun-Byul
    • The Journal of Society for e-Business Studies
    • /
    • v.15 no.4
    • /
    • pp.245-263
    • /
    • 2010
  • Today, large enterprises are changing their team organization to group organization. These trends have brought work flexibility of project and manpower usage. However, communication among group members has become more complicated, and it has been found that ERP was not efficient enough to solve this communication problem. The main purpose of this study was to design a quick and systematic communication system for group project management, and Web-based Information Reporting System (hence forth WIRS) has been proposed. The main topics covered in this paper are design of functions and system architecture, process model design, database design, and implementation of the prototype. Focus group interview was conducted and user feedback was positive about main functions for WIRS and its overall impact on the enhancement of productivity.