Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.7
/
pp.4897-4911
/
2015
Technology developments accelerate the change of the society and companies with unparalleled pace, so large scaled projects are in progress urgently. Large scaled projects deal with high technologies and massive tasks, and these need enormous labor force and costs, it is necessary to manage strategic conflicts based on human psychology and complex system theory. However, traditional management plan fails to suggest practical mechanism for successful projects. We study failure cases and key elements, leadership for projects, and suggest project management plan with psychological and behavioral economy approach by focusing on complexity and conflict structure on large scaled projects. Project behavior management plan, suggested in this study, is designed with phased strategy and practice to solve the failure of large scaled IT projects originally and preemptively. We verified the effectiveness of behavior management plan suggested by investigating experts and working groups, and stable projects are to be progressed with introducing this plan on large-scaled projects.
KSCE Journal of Civil and Environmental Engineering Research
/
v.37
no.2
/
pp.419-425
/
2017
Managing mega construction project is a very challenging task due to its large scale and complexity. To deal with the challenge, progress measurement must be estimated reliably and effectively. Many researchers have presented progress measurement methods, but previous studies are limited to single or several types of facilities. Thus, they have difficulties to being applied to mega construction projects that covers multiple facilities. To overcome the limitations, this paper proposes a progress measurement framework considering characteristics of mega construction projects. The framework consists of four phases : development of Work Breakdown Structure, determination of weights of main facilities and sub facilities, and calculation of the integrated progress rate. To validate the proposed approach, a case study of Sejong city in Korea was performed. The results of the case study showed the applicability of the proposed framework and confirmed that it enables to reliably measure progress rate of mega construction projects.
In an early stage, many people think that agile development methodology cannot be applied i large-scale IT projects. Nevertheless, agile development methodology has recently been introduced in variety of successful large-scale IT projects. In this paper, I compare two enterprise agile methodologies and introduce a case of Disciplined Agile Delivery (DAD) Framework, an enterprise agile development methodology. I compare and quantitatively measure the productivity of the development of two projects using Disciplined Agile Delivery framework and waterfall development methodology with a similar development scope.
Proceedings of the Korea Database Society Conference
/
2001.11a
/
pp.526-535
/
2001
우리나라 시스템 통합(System Integration) 프로젝트는 최근 들어 공공부문을 중심으로 점차로 대형화되고 장기간에 걸쳐 수행되는 추세에 있다. 그러나, 프로젝트를 주도해야 할 IT 인력의 이직률이 증가되고 근속기간이 점차 단축되는 현상은 국내 산업계의 기술축적과 경쟁력 제고에 걸림돌이 되고 있다. 본 연구의 목적은 대규모 시스템 통합 프로젝트를 수행 도중에 이직한 IT 인력의 이직 원인이 무엇인지 알아보며 이직방지를 위한 대안을 제시하는 것이다. 이를 위해 기존의 연구에서 공통적으로 제시하는 이직 영향요인을 업무측면, 인간관계 측면, 처우측면으로 재구성 한 설문분석을 통해 어떤 요소들이 이직에 큰 영향을 미치는지를 분석하였다. 또한 사례연구를 통해 응답자들을 업무적 성향과 처우적 성향별로 분류하여 이직에 영향을 준 각 측면별 이유와 해결책 및 시사점을 도출하였다. 본 연구의 결과는 IT인력에 대한 기존의 이직방지 대책보다는 효율적으로 IT인력을 운용 할 수 있는 참고기준이 될 수 있을 것이다.
대규모 금융권 차세대 프로젝트에서 테스트에 대한 중요성은 재무RISK 관점에서 뿐만 아니라 소프트웨어 품질향상을 위한 결함의 제거 관점에서도 그 의미가 크다. 대규모 차세대 프로젝트는 일반 프로젝트에 비하여 개발되는 소프트웨어의 양이 방대하고 개발참여인원도 일반적인 관리수준을 넘어 수작업에 의한 테스트만으로는 충분한 품질을 보장하지 못한다. 또한 테스트를 수행한 이후에도 지속적으로 변경이 발생하고 이를 반영하는 과정에서 많은 결함이 유입되는 현재의 SI 프로젝트 특성상 지속적인 테스트 및 반복적인 검증만이 소프트웨어의 품질을 보장할 수 있다. 본 논문에서는 code coverage testing기법을 활용하여 동적 테스트 수행결과를 log로 도출하고, log 분석 결과를 통해 소프트웨어 품질의 향상을 기대할 수 있는 방안을 제시한다.
Proceedings of the Korean Operations and Management Science Society Conference
/
2003.05a
/
pp.612-619
/
2003
실물옵션은 전통적인 경제성 평가기준의 하나인 순현재가치 분석법이 의사결정 과정에서 경영의 유연성을 무시함으로써 투자 혹은 자산의 가치를 낮게 평가하는 단점을 제거하고 이를 평가에 적절히 포함시킬 수 있다고 여겨지고 있어 새로운 평가방법으로 주목을 받고 있다. 특히, 정보기술(IT) 분야에서는 다음과 같은 이유 때문에 전통적인 현금흐름할인 방법이 효과적이지 못할 수 있다. (1) 우선, 정보통신 분야에서 대부분의 정보기술 기반 투자 프로젝트는 막대한 자본이 소요되기 때문에 기업들은 이를 피하기 위하여 단계적인 투자계획을 세우는 경우가 많다. (2) 또한, 초기 기반에 대한 투자의 주요한 혜택이 대부분 그 이후 단계의 투자에서 구현되기 때문에 성급한 초기투자에 대한 경제성 평가는 이후의 혜택을 무시할 가능성이 많아진다. (3) 마지막으로 초기의 투자 프로젝트에 참여하지 못하면, 이 후의 프로젝트에 참여하기 어렵기 때문에 미래의 혜택을 얻을 수 없게 된다. 이러한 여러 가지 이유로 이를 적절히 평가할 수 있는 실물옵션 평가방법이 선호된다. 본 연구에서는 정보통신 분야의 투자와 같은 대규모 프로젝트의 특징을 평가방법의 입장에서 살펴보고, 실물옵션 개념을 응용하여 이러한 투자 형태의 평가를 위한 모델을 개발하고 적용방법을 생각해본다.
Proceedings of the Korean Information Science Society Conference
/
2002.10c
/
pp.364-366
/
2002
최근 생명공학 분야에서는 IT와 BT가 결합하는 새로운 패러다임의 컴퓨팅 환경이 구축되고 있다. 이에 게놈 프로젝트 결과 분석해야 하는 데이터의 양은 엄청나게 증가하고 있다. 그러한 데이터를 처리하기 위해서는 대규모 저장장치 외에 슈퍼컴퓨터 급의 고성능 컴퓨터가 필요하게 되었다. 그러한 데이터를 처리하기 위해서는 대규모 저장장치 외에 슈퍼컴퓨터 급의 고성능 컴퓨터가 필요하게 되었으며, 바이오 인포메틱스 분야를 지원하기 위해서는 대규모 하드웨어 뿐만 아니라 데이터베이스, 데이터 마이닝 등의 소프트웨어 기술로 인해 그리드 환경을 요구하게 되었다. 이에 본 논문에서는 그리드 환경에서 분산된 수많은 생물학 데이터베이스에 쉽게 접근할 수 있는 통합 환경으로 응용 클라이언트를 제시할 것이다.
Korean Journal of Construction Engineering and Management
/
v.19
no.1
/
pp.43-53
/
2018
Modular construction can improve construction quality and accuracy through manufacturing process, and it allow massive production and cost savings by repeatedly producing the same unit. In particular, it is possible to reduce the time because the on-site work and the manufacturing process can be carried out at simultaneously. However, according to the modular construction project survey report, there is no significant difference regarding the average construction period between modular construction and conventional construction. This is due to schedule delay problems that occur during construction phase. Therefore, it is necessary to select alternatives to prevent schedule delay during on-site construction progressing. Especially, in case of large-scale modular construction project, on-site module assembly and manufacturing process are performed concurrently. Hence, identification of alternatives should be done at the co-occurrence by taking both manufacturing and on-site work process in to account. In this research, the management factors of large-scale modular construction project were identified through the IDEF0 modeling, and the quantity management model for manufacturing and assembly is developed. This will reduce the schedule delay problem that occurs in the progression on-site work of a large scale modular construction.
A large-scale IS development project takes a long time, thus its project manager needs to be more careful on risk management. In particular, appropriate cutover decision making is critical in large-scale IS development projects because the opening of the large-scale IS significantly impacts the organization. Regardless of its importance, cutover decision making in conventional IS development projects has been done in a quite simple way. Conventional cutover decisions have been made by considering just whether the new IS operates or not from the system, application, and data implementation perspectives. However, this approach may lead to unsatisfactory performance or system failure in complex large-scale IS development. Under this background, we propose a new framework for cutover decision making on large-scale IS projects. To validate the applicability, we applied the framework to a core banking system development case. The case study shows that our framework is effective in proper cutover decision making.
Proceedings of the Korean Information Science Society Conference
/
2008.06d
/
pp.322-326
/
2008
시스템의 규모가 대형화되어 감에 '시스템의 시스템'의 형태로써 대규모 사이즈의 프로그램 다양한 목적을 가진 사용자들, 대규모 저장 데이터양과 처리, 소프트웨어 컴포넌트간의 복잡한 연결상과 상호 의존성, 하드웨어의 다양성등을 포함하는 초대형 규모로 발전하고 있다. 또한 유, 무선 인터넷의 보편화와 소형기기들의 인터넷화 및 기존 서비스들의 개방화가 진행됨에 따라 새로운 독자적인 서비스를 만들기 보다는 SOA기반의 기존 시스템을 통합하여 새로운 서비스를 만드는 시도가 일어나고 있다. 최근 진행되고 있는 국가 및 산업의 대형 프로젝트들은 이러한 흐름에 따라 IT기술을 융합한 소프트웨어 기반의 초 대형 시스템 (Ultra Large Scale System)을 필요로 하고 있다. 이에 본 논문에서는 이러한 정보와 시스템의 대규모화에 대한 즉각적인 대처를 할 수 있는 Ultra Large Scale 시스템의 자율적응형 (Self-Adaptive) 기술 연구를 위하여 Self-Healing, Self-Integrating, Self-Orchestrating, Self-Managing, Self-Adaptring의 5가지 관점에서의 연구를 제안한다. 본 논문에서 제안하고 있는 연구의 파급 효과를 극대화 할 수 있는 영역은 e-Biz 시스템 u-city 시스템, USN 기반 물류 시스템 자동차 및 조선 사업의 IT융합 등의 대규모 시스템이 될 것이다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.