At the planning and design stages of a development of underground space or tunneling project, the information regarding ground conditions is very important to enhance economical efficiency and overall safety In general, the information can be expressed using RMR or Q-system and with the geophysical exploration image. RMR or Q-system can provide direct information of rock mass in a local scale for the design scheme. Oppositely, the image of geophysical exploration can provide an exthaustive but indirect information. These two types of the information have inherent uncertainties from various sources and are given in different scales and with their own physical meanings. Recently, RMR has been estimated in unsampled areas based on given data using geostatistical methods like Kriging and conditional simulation. In this study, simulated annealing(SA) is applied to overcome the shortcomings of Kriging methods or conditional simulations just using a primary variable. Using this technique, RMR and the image of geophysical exploration can be integrated to construct the spatial distribution of RM and to evaluate its uncertainty. The SA method was applied to solve an optimization problem with constraints. We have suggested the practical procedure of the SA technique for the uncertainty evaluation of RMR and also demonstrated this technique through an application, where it was used to identify the spatial distribution of RMR and quantify the uncertainty. For a geotechnical application, the objective functions of SA are defined using statistical models of RMR and the correlations between RMR and the reference image. The applicability and validity of this application are examined and then the result of uncertainty evaluation can be used to optimize the tunnel layout.
KSCE Journal of Civil and Environmental Engineering Research
/
v.39
no.2
/
pp.273-279
/
2019
Development of mountain area is increasing due to the demand for improvement of traffic convenience and development of underdeveloped area. Therefore, there frequently are sections where tunnels and interchanges are located close to each other. These sections do not only affect tunnel planning, types and length of interchanges, but also affect more on route selection. In Korea, several design criteria present each reference value but these values are very similar. In the situation, the minimum value among them is usually applied when planning roads and it could cause traffic safety problems in different site conditions. In this study, the problems of design speed, illuminance adaptation distance, and lane change intervals are analyzed by simulating the cases that the problem could occur when calculating the separation distance between tunnel and interchange. The results obtained from this study can be summarized as following: the driving speed should be applied in case that the site has a big gap between design speed and driving speed because the uniform application of the design speed is not safe; the illuminance adaptation distance should include the influence distance in the section affected by the direct light; in addition, the lane change distance should include the time to perceive the situation of the next lane after the lane change in the section required for successive lane change.
In this case of "Seongnam~Yeoju double-lanes railroad construction", there were safety facilities which were concerned about damages from vibration and noise. In the project design stage, the rock-splitter method was designed to prevent them. The electronic blasting was considered to improve construction speed and economic value as an alternative tunnelling method, complying with the site's vibration criteria(cowhouse : 0.09cm/sec, residence : 0.2cm/sec). In the environment evaluation report of the eDev, tunnel electronic blasting systems, the blasting pollutions can be managed by the electronic blasting method. The results were successfully conducted with high speed construction without any damages to adjacent facilities.
Journal of Korean Society for Geospatial Information Science
/
v.24
no.1
/
pp.9-16
/
2016
As the need of eco-friendly transportation systems for sustainable development increases, public transport accessibility has been considered as an important element of transportation system design. When analyzing the accessibility, shortest path algorithms can be utilized to reflect the actual movement and we can obtain high resolution accessibility for all other stations on the network with shortest distance and time. This study used the algorithm improved by reflecting the penalty of number of transfers and waiting time of overlapped routes to get the accessibility. KTX Seoul Station is a target place and this algorithm is applied to multi-layer subway bus network of Seoul to calculate the accessibility, therefore this study presented the accessibility of KTX Seoul station by stations.
산림청에서는 백두대간을 체계적으로 보전하고 골프장 설치등으로 산림이 무분별하게 훼손되는 일이 없도록 하기 위하여 '산림피해 확대방지 종합대책'을 수립$\cdot$시행한다고 밝혔다. 산림청은 그동안 많은 논란이 있었던 백두대간의 실체규명과 보전을 위하여 백두대간의 개념 및 보전에 필요한 사항 등을 2000년중으로 정립, 제도화하는 방안을 강구키로 하였다. 또한 건설교통부가 국토이용계획을 변경하고자 산림청과 협의할 때 적용하는 산림청의 '국토이용계획변경 협의기준'을 강화하는 내용으로 금년 하반기에 개정하기로 하였다. 스키장$\cdot$골프장 등 설치로 백두대간이 훼손되지 않도록 백두대간 마루금 침범을 금지하는 내용으로 개정하고 집단묘지개발시 피해유발 우려가 있는 경사 30$\%$이상지역, 마사토지역과 경관지역은 묘지개발을 금지하게 할 계획이다. 또한 무분별한 산림형질변경을 제도적으로 방지하기 위하여 현행 시장$\cdot$군수로 되어 있는 산림형질변경허가권자를 시$\cdot$도지사로 상향하는 내용으로 금년중 산림법 시행령을 개정하기로 하였다고 밝혔다. 특히 각종 개발사업 추진과정에서 장마철 집중호우로 인한 수해가 발생하지 않도록 하기 위하여 1년 이상 공사중단된 골프장은 6월중에 일제조사를 실시하여 장마철 집중호우시 수해위험에 있는 골프장에 대하여는 시$\cdot$도지사에게 요청하여 사업승인을 취소하거나 사업중지토록 할 계획이다. 산림경영 기반시설인 임도에 대하여는 피해방지 및 경관유지를 최우선하는 '환경친화적 녹색임도' 정책으로 전환하기 위하여 기존의 부실 임도에 대하여는 7월부터 대대적인 구조개량 사업에 착수하고, 내년부터는 임도계획 단계부터 노선등의 적정여부를 사전평가하는 제도를 도입하겠다고 밝혔다. 최근 산림훼손으로 문제되고 있는 송전탑진입로는 산림 형질변경허가를 엄격하게 운용하기 위하여 앞으로는 한국전력으로 하여금 진입로 설치 대신 삭도$\cdot$모노레일$\cdot$헬기운반을 대폭 확대하도록 조치하였으며 또한 이미 공사완료한 곳 중 피해방지$\cdot$경관유지가 필요한 경우에는 한국전력으로 하여금 설계를 변경하여 추가공사를 하도록 협의완료하였다고 산림청은 밝혔다.
Korean Journal of Construction Engineering and Management
/
v.14
no.6
/
pp.14-21
/
2013
While a detailed cost estimation utilizes the comprehensive quantity information obtained from a complete drawing and specification, an approximate cost estimation heavily relies on the subjective decisions. This phenomenon is because the approximate estimation is usually conducted in early stage of the construction phase where the drawing and specification are not available. This study developed a roadway construction cost estimation system which enables users to estimate the approximated cost of the project in early stage. The system identifies the variation of the construction costs due to the road route change using a cased based reasoning(CBR) method. Overall the system is expected to improves the accuracy and effectiveness of the estimation process, because it would provide users with increased accessability and consistent results in early stage of the project which leaded to the increased work transparency.
Journal of the Korea Society of Computer and Information
/
v.19
no.12
/
pp.187-196
/
2014
In this paper, Minimize driving energy for operation within a defined distance yeokgan fixed time-resolved and determine the nature of the train is traveling, and to model mathematically. Urban rail car cruise in general by the PID controller is used instead of automatically tracking a target value while traveling in energy consumption to be minimized by using optimal control model railroad charyangreul was designed under real operating conditions the same. The actual track conditions apply to the minimum value or a separate listing of cars around the track facility without a driving energy of the automatic operation and to reduce the driving energy. Therefore, actual route chosen straight line 8 / gradient segment / curve for the measured data analysis, such as sections within the city-minute drive each section and presented how the trains to save energy, depending on the pattern of the train station in the region.
Finite element or difference methods are applied to the analysis of the tunnel stability and they provide detailed behaviour of analyzed tunnel sections but it is rather inefficient to analyze all the section of tunnel by using these methods. In this study, the authors suggest a new stability analysis method for whole tunnel to provide an efficient and easy way to understand the behaviour of whole tunnel by using an analytical solution with the assumption of equivalent circular tunnel. The mechanical behaviour, radial strain and plastic zone radius of whole tunnel were analyzed and appropriate support pressure to maintain the displacement within the allowable limit was suggested after the application of this method to the tunnel. Consequently, it was confirmed that this method can provide quick analysis of the whole tunnel stability and the quantitative information for subsequent measures such as selection of tunnel sections for detailed numerical analysis, set up of the monitoring plan, and so on.
Baehuryeong tunnel connects Chuncheon with Hwacheon in Kangwon, Korea, This tunnel is a single tunnel with 5,057 m long and two bidirectional lanes which will be extended into low lanes in the future. The estimated construction period of Baehuryeong tunnel is approximately 55 months. This tunnel will become the longest bidirectional roadway tunnel in Korea. Compared to a twin tunnel, a bidirectional single tunnel has two major disadvantages with regard to the ventilation system and ease of escape during fire. For these reasons, a service tunnel and the transverse ventilation system are planned first time in Korea. In case of fire, the tunnel ventilation design aims to maintain a smoke free layer for passenger evacuation. The geology of Baehuryeong tunnel site is mainly composed of gneiss and granite. Baehuryeong fault is a mainly large scale fault which stands vertical and parallels with tunnel direction. The influenced zone of this fault is within 70 m. Baehuryeong tunnel was designed that it was separated with the distance of more than 100 m from Baehuryeong fault for its safety.
Kim, Kwang-Yeom;Yim, Sung-Bin;Kim, Sung-Kwon;Kim, Chang-Yong;Seo, Yong-Seok
The Journal of Engineering Geology
/
v.17
no.4
/
pp.555-566
/
2007
In general, RMR classification system is used for the support design of a tunnel. Face mapping during excavation and RMR-based rock classifications are conducted in order to provide information for complementary changes to preliminary survey plans and for continuous geological estimations in direction of tunnel route. Although they are ever so important, there are not enough time for survey in general and sometimes even face mapping is not available. Linear regression analysis for the estimation of mediating RQD and condition of discontinuities, which require longer time and more detailed observation in RMR, was performed and optimum regression equations are suggest as the result. The geological data collected from tunnels were analyzed in accordance with three rock types as sedimentary rock, phyllite and granite to see geological effects, generally not been considered in previous researches. Parameters for the regression analysis were set another RMR factor.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.