• Title/Summary/Keyword: 노선선정

Search Result 222, Processing Time 0.02 seconds

Characteristics of Night Specialized Traffic Accident Hotspot Using Continuous Risk Profile (CRP) Analysis (CRP (Continuous Risk Profile) 분석을 이용한 야간 특화 교통사고 다발구간의 특성)

  • Kim, Heesoo;Oh, Heungun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.1
    • /
    • pp.49-56
    • /
    • 2021
  • The purpose of this study is to develop a methodology to select a cluster of night traffic accidents using CRP (Continuous Risk Profile) analysis. the other purpose of this study is to present the characteristics of the traffic accident cluster section selected at night using CRP analysis. The CRP analysis was performed considering traffic volume of target routes through traffic accident data. In addition, variables were set according to the freeway sections. the method of subtracting the daytime CRP from the nighttime CRP was used to analyze the nighttime traffic accident. As a result, Using the CRP analysis, the sections of hotspot were identified and plotted based on traffic accidents. Also, the sections where traffic accidents are frequent were those where IC or Tunnels were installed, and there was a deviation from the general section. In conclusion, CRP analysis could be used to calculate the frequent section of specialized traffic accidents at night, and it was selected as a point in need of improvement due to the frequent occurrence of specialized traffic accidents at night in the section where IC or tunnel facilities are installed. In addition, it is inferred that the number of specialized traffic accidents at night in the section where IC or tunnel facilities are installed is a factor in the problem of night visibility due to lighting facilities.

A Study on the Economical Analysis Model for Asphalt Pavementin Congestion Area of Metropolitan (대도시 혼잡구간의 아스팔트 포장에 대한 경제성 분석 모델 연구)

  • Jo, Byung Wan;Tae, Ghi Ho;Kim, Do Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.771-781
    • /
    • 2006
  • This Study is about the development of LCC Analysis Model and Evaluation of VE. It was carried out to help the person's intention decision about choosing the pavement construction method that can deal with 'Pavement Life Factor' like Area Character and Traffic Volume efficiently, by considering the total life cycle cost of pavement life cycle happens according to the numbers of public use year. For this, we developed the new LCC Analysis Model by using the Data of Seoul city the representative city in Korea, and carried out VE Evaluation that reflects the opinions of specialists. This Analysis Model consists of cost items that affects directly the choice of pavement construction, except for the common cost items of the various pavement construction. And we investigated the propriety by applying our model to the example line that are used for the public at present. About the base data of cost items that are used for our analysis, we enhanced our model's confidence by using the statistics data of Seoul and the standard data of unit cost calculation.

Influence Factors of Street Environment for Provision and Management of Street Green (가로녹지 조성 및 관리를 위한 가로환경 영향요인 분석 연구 - 서울시 관리도로를 대상으로 -)

  • Han, Bong-Ho;Kwak, Jeong-In;Kim, Hong-Soon
    • Korean Journal of Environment and Ecology
    • /
    • v.27 no.2
    • /
    • pp.253-265
    • /
    • 2013
  • This study was correlation analysis between provision and management of street green and street environment through field survey about city official roads(93 routes, 629.2km) in Seoul. Green belt under the street trees were 17.5% of all routes. Composition of street green belt width of 1~ 2m was the most common(11.6%). Management status as a protected facilities were protect frame and prtect cover installed inerval(60.1%). Interval of pruning was 63.5%. Type of tree was mainly 47.9%. Road width was mainly more than 8-line(51.3%). Sidewalk width was mainly 3~6m(84.1%)in environment status of street. Landuse was mainly commercial and business(70.3%). Electronic wire complete was mainly compete with crown(33.6%). Use of sidewalk was mainly used(16.3%). ANOVA analysis was conducted between the Street green and environment of Street. Street green belt(more than with 3m) was analyzed to be effective in street green manufacture. Natural green area of city's outside and Industrial area were analyzed to be effective. Use of sidewalk was to be a management. Protection facilities are installed on the narrow sidewalk width lower intensity. There was a higher strength in narrow sidewalk width, road width and compete with crown. And type of tree was higher strength similarly. Pruning and type of tree showd a significant correlation. Thus, ensure sufficient sidewalk width and land use should be considered for street green was effective manufacture and management. Species selection and pruning management was needed by consider electronic wire management, type of tree and landscape.

Estimating Transfer Trips in Seoul Metropolitan Urban Railway (Using Transportation Card) (수도권 도시철도 환승통행량 추정방안 (교통카드자료를 이용하여))

  • Lee, Mee Young;Sohn, Jhieon
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.15 no.6
    • /
    • pp.36-46
    • /
    • 2016
  • Separate transportation card readers that record the amount of transfer volume occurring during movement in-between lines within the metropolitan railway transfer stations do not exist. This research proposes a model to estimate passenger transit movements in transfer stations that adequately reproduces characteristics arising during a transfer trip. The model used in this study assumes that passengers adopt transfer behaviors that minimize their generalized costs during transfer trips. Further, two measures are sought in order to reflect attributes of the metropolitan railway. The first is that similar paths connect origin and destination stations. For this, the M-Similar Paths method is applied to the model to identify the similar paths that arise. The second is that passengers perceive increasing number of transfers as additional transfer costs, which is reflected by means of the Stepwise Transfer Coefficient. Two case studies of metropolitan railway are used to propose measures for analysis of transfer trips. Twenty directional transit phenomena are reproduced for Sindorim railway station. Aggregate directional transit(A), aggregate inter-line transit(B), and B/A are calculated on a percentage basis for 33 metropolitan railway transfer stations, and using this, the functional role of transfers is explored.

Improvement of Forest Road Construction Related to the Running Speed of Cargo Truck (차량(車輛)의 주행속도(走行速度)에 관계(關係)하는 임도(林道)의 구조(構造) 개선(改善))

  • Lee, Joon Woo
    • Journal of Korean Society of Forest Science
    • /
    • v.85 no.3
    • /
    • pp.513-523
    • /
    • 1996
  • This study was a med at predicting running speed related to alignment factors of forest road, and recommending the improvement method of forest road construction using the running speed of vehicles. For these purposes, this study proceeds to select forest roads after reviewing the planning papers and maps, to measure the road alignment factors such as longitudinal gradient, width of roadway, radius of curve, length of curve, superelevation, and conditions of road surface on the subject forest road. It was found that the running speed of vehicle on forest road is mainly influenced by the conditions of road surface, radios of curve, compound gradient, length of curve, longitudinal gradient and so on. The average running speed of cargo truck showed lower value than that of the expected speed of 'Forest Road Construction Regulations and Rules', and the average running speed of loaded truck showed 70-85% of the speed of empty truck. According to the road conditions, the changes of running speed can be expressed mathematically in terms of the increment of radius of curve and longitudinal gradient. The results of the study on the running speed of vehicle subject to the alignment of forest roads make it possible for one to judge the quality of the existing and to be constructed forest roads, to select the structure of forest road to improve the running speed of vehicle on forest road.

  • PDF

A Study on Performance Criteria of Asphalt Pavements for Development of Performance-based Warranty Specification (성능보증 시방서 개발을 위한 아스팔트 포장 성능기준 연구)

  • Yeo, Hyun Dong;Nam, Jeong Hee;Suh, Young Chan;Jeong, Jin Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.793-801
    • /
    • 2011
  • Existing specifications of road pavement require contractors to meet only materials and construction conditions regardless of pavement life. There are limitation of developing road pavement technology and possibility causing dispute between ordering organization and contractor with this type of specification. Research efforts to introduce performance warranty contracting are in progress in the field of road pavement to improve the problems. The performance warranty contracting gives the contractors opportunity to select materials and construction methods as they like. But they should satisfy a certain level of performance during a given period. The performance indicator and threshold value of pavement which are main elements of the warranty specification should be defined first to introduce the performance warranty contracting successfully. In this study, the performance indicator, threshold value, and warranty duration of asphalt pavement were investigated by reviewing literatures on performance warranty contracting of some states of the US. Major distresses influencing the performance of the asphalt pavement were investigated at 24 national expressway lines and national highway lines in 16 regions, and the data were analyzed to be compared to the cases of the US. Development of rational performance warranty specification for domestic asphalt pavement is expected based on the research results.

Impact Analysis for Transit Oriented Street Design (A Case Study for Kangnam Street in Seoul) (대중교통우선가로제 시행방안 및 기대효과 분석 (강남대로 중앙버스전용차로 도입을 중심으로))

  • 황기연;이조영
    • Journal of Korean Society of Transportation
    • /
    • v.21 no.3
    • /
    • pp.47-56
    • /
    • 2003
  • Considering the high density developments along the major traffic corridors in Seoul, transit-oriented street designs will be a very effective to control traffic congestion along the corridors. For testing the effectiveness, we selected. for our case study, Kangnam Street, which is one of the most highly developed corridors in Seoul The traffic study on Kangnam street in 2000 shows that the daily average bus speed is 11.73km/h, which is 5km/h lower than the auto speed. The Central Bus Lane system was applied on the Kangnam street to test impact on bus speed as well as auto speed. Simulation results show that with Central Bus Lane have been improved the travel speeds of bus as well as auto on Kangnam street from 14.4km/hr to 35.0km/hr and from 25.1km/hr to 26.1km/hr, respectively. The bus market share increases about 6-8 percentages. Especially, 13.4% of bus users are increased for long-distance trips.

Development of Pre-Environmental Investigation GIS Decision Making System Using Spatial Analysis Technique (공간분석기술을 활용한 사전환경성 검토 GIS 의사결정시스템 개발)

  • Kim, Sang Seok;Jang, Yong Gu;Kang, In Joon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.185-193
    • /
    • 2006
  • The on-going pre-environmental investigation at present is performed by separate numerical analysis of each provision which makes integrated pre-environmental investigation is difficult. The application of numerical data is insufficient, which results to the deterioration of environmental investigation result's objectivity. A lot of time and money is required for the investigation. In this study, the spacial analysis function of GIS was applied on the 8 pre-environmental investigation factors. Pre-environmental investigation GIS DMS(Decision Making System) was constructed to make integrated investigation possible through the use of investigation results for each factor. Through the use of the developed pre-environmental investigation GIS DMS and the pre-constructed GIS data, the objectivity of environmental investigation is sufficient and time and cost are reduced. Therefore, this system can be used for pre-environmental investigation during route selection in the initial stages of road construction. Through the numerical and visual data obtained from the system developed in this paper, it is easier to gain the approval of the public. Furthermore, environmental problems due to road construction can be investigated with less time and money during the initial stages of road construction.

Change in the Concrete Strength of Forest Road Drainage Systems Caused by Forest Fires (산불로 인한 임도 배수시설의 콘크리트 강도 변화)

  • Ye Jun Choe;Jin-Seong Hwang;Young-In Hwang;Hyeon-Jun Jeon;Hyeong-Keun Kweon;Joon-Woo Lee
    • Journal of Korean Society of Forest Science
    • /
    • v.112 no.4
    • /
    • pp.451-458
    • /
    • 2023
  • As forest fires continue to increase in scale worldwide, the importance of forest roads in relation to forest fire prevention and suppression has become increasingly evident. To ensure effective functioning during a forest fire disaster, it is crucial to apply appropriate road planning and ensure roads' structural integrity. However, previous studies have predominantly focused on the impact of forest fires on firebreak efficacy and road placement, meaning that insufficient attention has been paid to ensuring the safety of these facilities. Therefore, this study sought to compare the strength of concrete facilities within areas damaged by forest fires over the past three years by using the rebound hammer test to identify signs of thermal degradation. The results revealed that concrete facilities damaged by forest fires exhibited significantly lower strength (15.6 MPa) when compared with undamaged facilities (18.0 MPa) (p<0.001), and this trend was consistent across all the target facilities. Consequently, it is recommended that safety assessment criteria for concrete forest road facilities be established to prevent secondary disasters following forest fire damage. Moreover, continuous monitoring and research involving indoor experiments are imperative in terms of enhancing the stability of forest road structures. It is expected that such research will lead to the development of more effective strategies for forest fire prevention and suppression.

A Study on the Factors Affecting the Stopping Time and Punctuality of Bus Stop: A Case of Bus Stop by Roadside Bus Only Lane (버스 정류장 정차시간 및 정시성에 영향을 미치는 요인에 관한 연구: 가로변 버스전용차로의 정류장을 중심으로)

  • JANG, Jae-Min;LEE, Young-Inn;LEE, Keun
    • Journal of Korean Society of Transportation
    • /
    • v.35 no.3
    • /
    • pp.234-246
    • /
    • 2017
  • The Seoul metropolitan government introduced the bus information systems, bus rapid transit to increase travel speed and punctuality but still suffer from insufficiency. This paper delivers a study verifying the external factors at near the bus stops. The dependent variable was set to the standard deviation of (1) travel time and (2) travel time to and from the bus stop in this study. The independent variables were set to (1) the number of routes, (2) traffic volume by bus type, (3) the number of bus bays, (4) the possibility of passing, (5) the distance to crosswalks and intersections, and (5) the presence of residential road. The results showed that the most significant factors included the link section speed, number of bus bay, distance to crosswalk, and the possibility of passing.