1 |
Gang J. R., Kho S. Y. (2006), Development of Optimal Number of Bus-stops and Inter-stop Space Estimation Model Based on On-Off Patterns of Passengers, J. Korean Soc. Transp, 24(1), Korean Society of Transportation, 97-108.
|
2 |
Kim J. S., Park B. J., Roh C. G., Kang W. E. (2014), Improve the Reliability Measures of Bus Arrival Time Estimation Model, J. Korean Soc. Civil Eng, 24(1), Korean Society of Civil Engineers, 597-604.
|
3 |
Lee C. H., Park Y. J., Kang K. P. (2010), Prediction of Bus-Link Travel Time Considering Signal Phases, The 62nd Conference of KST, Korean Society of Transportation, 743-748.
|
4 |
Lee S. H., Mun B. S., Park B. J. (2010), The Bus Arrival Time Prediction Using Bus Delay Time, J. Korean Soc. Transp, 28(1), Korean Society of Transportation, 125-134.
|
5 |
Noh C. G., Kim W. G., Son B. S. (2010), Development of Bus Arrival Time Estimation Model by Unit of Route Group, J. Korean Soc. Transp, 28(1), Korean Society of Transportation, 135-142.
|
6 |
Oh H. J. (2012), Study on the Factors Influencing the Punctuality of Inner City Bus Operation, A Master's Thesis, Department of Urban Planning and Transportation Engineering Graduate School Keimyung University.
|
7 |
Seong M. E, Choi K. C., Shin K. W., Chung W. H., Lee K. J. (2014), An Empirical Model for Estimating Bus Boarding and Alighting Time, J. Korean Soc. Transp, 32(2), Korean Society of Transportation, 152-161.
DOI
|
8 |
Yang D. Y., Choi J. S., Kim S. Y., Sung H. J., Kim S. K. (2011), Analysis of Bus Management System Evaluation by Reliability, Conference paper, Korean Society of Road Engineers.
|