• 제목/요약/키워드: 노무라

검색결과 600건 처리시간 0.024초

Integrated Manpower Information Systems on Construction Site - Using RFID and QR-Code - (RFID와 QR-코드를 활용한 건설현장 통합노무정보관리 효율화 체계 구축)

  • Choi, Yun-Gil;Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • 제12권4호
    • /
    • pp.106-116
    • /
    • 2011
  • It is very important to collect and manage labor information in the construction industry that is labor-intensive. Although research and cases that utilize RFID are increasing for more effective labor management, labor management is limited to the checking-in and -out information management at the entrance of a construction site due to high expense of an RFID reader. Labor and safety information is still managed based on the redundant process that is hand-written in a book and re-input of information by using a personnel-computer. Therefore, the objective of this paper is to develop more effective and efficient process for labor information record and management. This paper presents a prototype application that supports integrated labor information management by incorporating QR-code into RFID-based labor management system and verifies the application through a pilot test and comparison with the existing labor management syste.

A Study on the Progress Measurement Method using Percent Complete of Work and Labor Productivity - Focusing on Structural Works of Apartment Construction - (단위작업 물량 달성율과 투입 노무량을 이용한 진도율 산정방법에 관한 연구 - 공동주택공사의 골조공사를 중심으로 -)

  • Choi Hyun-Ha;Lee Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • 제6권1호
    • /
    • pp.212-219
    • /
    • 2005
  • Time management is important in construction management Especially, in the high-rise apartment housing projects, it is very important to expedite the construction progress in order to meet the planned schedule. The objective of this paper is to propose the baseline for the progress rate using work volume and man $\cdot$ hours performed at work activity level. The work volume far each activity is transformed to the weighted value compared to total work volume for the floor Therefore, a progress rate for an activity is calculated by multiplying a weighted value and work volume. A progress rate for a floor and a building can calculated in this manner, respectively.

Digital Pen System for Inputting the Actual Amount of Labor Input at Construction Site (건설현장의 실투입 노무량 입력을 위한 디지털펜 시스템)

  • Kim, Daewon;Kim, Tae-Yong;Shin, Yoonseok;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • 제16권2호
    • /
    • pp.133-140
    • /
    • 2016
  • The amount of labor input in a construction project is used as source data to estimate construction cost and to understand the productivity of the construction industry. However, there is a significant difference between the standard of estimation and the actual amount of labor input, and a plan is needed to resolve this problem. For this reason, to establish a system with which the actual amount of labor input can be inputted in a more accurate and simpler manner, a new method is proposed in this study. In the new method, a digital pen is used to minimize the difference from traditional handwriting on paper using a pen, and eliminate the redundant input of information. This study is expected not only to reduce the actual amount of labor input but also to contribute to the productivity of construction cost estimate through the sharing or utilization of the information on the web.

Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work - Focusing on Masonry Plaster Waterproofing Tile Labors - (공동주택 건설공사의 표준품셈과 실투입 노무량 비교 분석 - 미장, 방수, 조적, 타일공사를 중심으로 -)

  • Jeon, SangHoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • 제16권1호
    • /
    • pp.110-118
    • /
    • 2015
  • The standard production unit system is the most basic element in our country construction. However, this standard production unit system shows a large difference in the actual amount of labor input for works at the Apartment housing construction, Therefore, it may be a reasonable alternative to estimate the cost of construction by historical cost data, works will be calculated the cost of labor must determine the exact amount and It is necessary to determine the exact amount of labor input for the construction progress management. This study examines the results of comparing the standard production unit system and the actual amount of labor counting in apartment housing construction was completed in the metropolitan area since 2000, the following results were obtained. the actual amount of labor input are looked for 1.184person/1000 of masonary, $0.084persons/m^2$ of plaster, $0.039persons/m^2$ of Waterproofing, $0.059persons/m^2$ of tile at the Apartment housing construction. in the actual amount of labor counting Compared with standard production unit system, masonry ratio of 59.8%, plaster ratio of 41.3%, waterproofing ratio of 31.5%, tile ratio of 34.3% and The labor rate in the works was the lowest in the plaster. was relatively high in the masonary. Therefore, the amount of labor country apartment housing construction is preferably calculated on historical cost data. But it seems that the amount of labor necessary complement ongoing close enough to the actual standard production unit system a major variable in construction management.

국가 경영 활성화를 위한 제언

  • Jang, Seong-Su
    • 주택과사람들
    • /
    • 통권210호
    • /
    • pp.30-33
    • /
    • 2007
  • 지난 10월, 국회 건설교통위원회의 건설교통부 국정 감사에서는 노무현 정부 5년 동안의 부동산 정책이 도마 위에 올랐다. 의원들은 오른 집값을 끌어내리지 못하고 계획만 쏟아낸 노무현 정부의 부동산 정책을 집중 추궁했다. 전문가들은 현재도 앞뒤를 정교하게 따져보지 않은 반시장적 정책과 곳곳에서 사업성이 떨어지는 각종 사업이 진행 중이어서 차기 정부에 큰 부담으로 작용할 수 있다는 우려의 목소리가 높아지고 있다. 정부에게 바라는 부동산 경기 활성화 대책에 대해 알아봤다.

  • PDF

주 40시간제 교육 안내

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • 통권241호
    • /
    • pp.32-33
    • /
    • 2010
  • 2011년부터 20인 미만 사업장의 주40시간 근무제 도입예정에 따라 한국공인노무사회는 주 40시간 근무제의 주요 내용과 운영방안 등에 대한 온라인 및 오프라인 교육을 실시하고 있다. 본지는 20인 미만인 회원사의 근로업무에 도움이 되고자 한국공인노무사회의 교육 일정을 소개한다.

  • PDF

The case study on interview mise-en-scène of documentary film (다큐멘터리 <노무현입니다> - 인터뷰 미쟝센 사례 연구)

  • Lee, Changjae;Sim, Jihyun
    • Trans-
    • /
    • 제7권
    • /
    • pp.81-101
    • /
    • 2019
  • Interviews are so important and meaningful that it is the heart of the documentary. In narrative film, it is focused as the story discourse, whereas documentary is strong in disclosure, which consists of narration and interview. In a TV documentary, interviews use conventional shots repeatedly, whereas in a documentary film that targets a relatively large screen, the interviewer's Mise-en-scene should consider the aesthetic depth. , which released in 2017 and used the audience for the third time in documentary film history, tries to make 40% of the volume of the main volume equal to the same angle. In a TV documentary, it is not uncommon for an interview cut to exceed 30 seconds, and if it exceeds 1 minute, immersion is significantly lowered, so the a mount and compression of the interview disclosure is important for both the director and the audience. In the case of the interview sequence of , it was the key to communicate the sub-plot with a relatively focused with long discourse, which is at least 8 minutes and 30 seconds to a maximum of 11 minutes, in a way that allows the audience to communicate. Furthermore, it was produced after the death of the protagonist Roh Moo Hyun, with the limitation that the voice of the protagonist was excluded, and the voice of Roh Moo Hyun was indirectly reproduced through the surrounding characters. In this study, it covers the meaning and scope of interviews in the production of documentary, and the aesthetic applications of the Mise-en-scene.

  • PDF

A Study on the Method of Estimating Indirect Labor Cost Rate Using the Analysis of Cost Items in Complete Works (완성공사 원가구성 분석에 의한 간접노무비율 산정방법에 관한 연구)

  • Jung Soon-Kil;Lee Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • 제2권2호
    • /
    • pp.81-89
    • /
    • 2001
  • Construction industry has particular properties of non-continuity of production, and non-stability of market comparing to other industries. Because of them, the practical construction cost is more difficultly recognized than in manufacturing industry, so, that is various according to many projects. Therefore, it is very hard work to standardize construction cost, and it is worthy of analyzing and measuring exactly construction cost. On this study, the trouble in producing expected construction cost with original cost calculation method is progressed by the data of cost items in complete works. On the basis of analyzing data, as expected cost of practical construction is measured, it can be referred to the method and the standard of indirect labor cost rate in construction.

  • PDF