• Title/Summary/Keyword: 기획 개발 단계

Search Result 327, Processing Time 0.022 seconds

Analysis of Risk Factors in Ex-Ante Evaluation of Large-Scale Government R&D Programs (대형 R&D사업 사전평가에서의 위험요인에 대한 인식 분석)

  • Lee, Yoon Been;Yoon, Ji Woong
    • Journal of Korea Technology Innovation Society
    • /
    • v.17 no.2
    • /
    • pp.289-308
    • /
    • 2014
  • We analyze the risk factors identified for ex-ante evaluation regarding government R&D programs. In particular, we empirically examined to what extent each risk factor is perceived to be important by the stage of R&D, technology field, researcher's career and experience. The empirical results show that technology risk is perceive to be less important for basic research, while market risk more perceived to be important in the IT field. Political risk is perceived to be less important for the university faculty, while researchers with government R&D project experience gave more value to legal risk factor.

BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge (BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발)

  • Chun, Kyoung-Sik;Park, Won-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7204-7210
    • /
    • 2015
  • This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.

An Intensification Plan of Technical Competitive strength in Domestic Construction Engineering Company (건설엔지니어링업체의 기술경쟁력 강화방안)

  • Park Hwan Pyo;Lee Kyo Sun;Ji Sang Wuk;Park Sang Hun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.66-74
    • /
    • 2002
  • The Cost of Engineering is composed of the $3{\~}5{\%}$ of total cost of construction. It is important the role of engineering in the first stage of the business. But, it was not more the technical level of domestic design stage than advanced state. Expecially, it was because of the cognition lack and unreliable results about technical development. The result of that, it was lacking to the draw results of foreign countries. And it was to waste national budget through overlapped adopting of similar technologies from abroad that few projects are performed as their original plan. Therefore, the research is proposed to the intensification plan of technical competitive strength in domestic construction engineering company to cope with the change of economic environment.

A Study on the Government's R&D Budgeting Evaluation System in Korea (과학기술혁신체제 하에서의 국가연구개발 평가 시스템 개선에 관한 연구 : 연구개발 예산평가 시스템을 중심으로)

  • Bark, Pyeng-Mu;Lee, Ki-Jong
    • Journal of Korea Technology Innovation Society
    • /
    • v.12 no.4
    • /
    • pp.819-839
    • /
    • 2009
  • Proposed increases to the government's R&D budget should be discussed based on merits of meeting efficiency and effectiveness criteria. The evaluation of the national R&D budget and related programs are performed in two areas: a system of R&D budget coordination and allocation, and a system of R&D program performance. This paper mainly focuses on the operational areas of R&D budget evaluation system with a focus on their impact to efficiency and effectiveness. The core view point for a R&D budget evaluation system involves two directions: Firstly, to detail the relationships between the later stage (ex. post) activities such as, program survey, analysis, and program performance evaluation, with the budget evaluation. Secondly, to critically oversee all R&D coordination procedures with a different perspective. Budgeting is generally known as a serial process of policy making, planning and executing. It is highly desirable for the budget to be allocated to, and spent by, specific programs as planned, and that each plan be aligned with a specific policy. As such, a strong relevance between the program structure and budget code system is integral to successful execution. It should be performed using a decision making system which closely examines the link between policy and budget. It is also recommended that systematic relationships be maintained among budget coordination and allocation, performance evaluations of policy and program levels, and program survey and analysis system, and that their operational schedule should be reviewed comprehensively as a one integrated system. The National Science and Technology Council is expected to play a major and practical role as the center of policy planning and should be supported by the objective and unbiased system which covers overall process from policy making to program evaluation. Finally, increased utilization of contents, timely program survey and analysis, and accurate of activity scheduling of budget coordination and allocation, and diligent program performance evaluation all contribute towards a more efficient and effective overall evaluation system.

  • PDF

A Study on the Development of Storytelling of Co-Brand for Regional Agricultural Products : Focusing on the case of 'Geudae Ginger' in Andong (지역농산물 공동브랜드의 스토리텔링 개발 : 안동 '그대생강'의 사례를 중심으로)

  • Kang, Mihye;Kim, Gongsook
    • 지역과문화
    • /
    • v.7 no.1
    • /
    • pp.153-182
    • /
    • 2020
  • Andong is the place where the most ginger is produced in Korea. The article is based on a study on the development of storytelling of a co-brand of local agricultural products, focusing on the case of 'The Geudae Ginger,' a co-brand of ginger in Andong. This study aims to develop a brand storytelling of Andong Ginger's co-branded 'Geudae Ginger' to build an image as a local specialty and help revitalize the Andong ginger's industry. The process of developing storytelling to activate 'Geudae Ginger' brand is as follows. In the first step, I collected storytelling materials through data research. Ginger, which has long been used as a medicine for mankind, has more historical and cultural stories than anything else. In the second step, story resources were extracted based on data research. By analyzing the story properties of Andong ginger, we made its list. As a result, the image of the nobility, rigidity and chastity of ginger, which is used to benefit all over, could be associated with the image of Andong, the capital of Korean spiritual culture. Storytelling was developed in the third step. The main theme was 'Andong ginger with anther level ' and the main story was 'The Story of Andong's Ginger Teacher'. The scenario developed is as follows: 1. Introducing Andong's Ginger Teacher, 2. The birth of Dosan Thirteen Tea, 3. 'Geudae Ginger' that bridges love. In the last fourth step, I proposed ways to utilize storytelling. I presented the spread methods of consumer-participated storytelling using images of 'Geudae Ginger' and a new-tro event with teachers highlighting the image of 'Ginger Teacher' and others as a local business program for storytelling expansion.

A Study on the Establishment and Operation of the Electronic Research note system in a closed network (폐쇄망에서의 전자연구노트 시스템 구축 및 운영 방안에 관한 연구)

  • Kim, Youngin
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.22 no.2
    • /
    • pp.135-141
    • /
    • 2022
  • It is an important role of a researcher to preserve the research process and results as a record in the overall R&D from the planning stage to completion. This can be used as a basis to support the objectivity of the R&D process and results. This can be used as a basis to support the objectivity of the R&D process and results. The necessity of writing research notes is raised in terms of research ethics, records management, intellectual property rights protection, and research results protection according to 「National Research And Development Innovation Act」. Therefore, in this paper, the results of the systematic and practical management method of research notebooks operated by government-funded institutions are described.

A Study on the Risk Evaluation of Apartment Development Project based on VE (VE기반 공동주택 개발사업 리스크 평가에 관한 연구)

  • Lee, Hyun-Chul;Shin, Seog-Bae;Hong, Ju-Hyun;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.14-25
    • /
    • 2009
  • Development work of apartment houses is a complex medium-and long-term project requiring grand resources and work force. Since in combination inner and outer project variables relate to project output, uncertainties caused by not only a given site condition but also politic, economy and social sectors are generated during the project. These risks influence output of the project as important factors, and ultimately as management variables in priority giving an effect on earnings and the financial structure of enterprises they should be manageable with the risk reduction plan. In this point of view, this study focused on development work of apartment houses among construction project. Risky factors were deduced, analyzed and evaluated based on Value Engineering from planning to designing to executing to maintaining. Eventually, this study showed the foundation guaranteeing competitive power of public and private construction sectors.

Construction of a Toolkit for Customizing a PDM Framework (PDM 프레임워크 재 정의 도구 구축)

  • Kim, Jeong-Ah
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.7 no.1
    • /
    • pp.38-47
    • /
    • 2001
  • PDM is an integrated solution for managing various kinds of document and information for a whole life~cycle of product management. PDM system spans a huge and complex area and requires so many efforts and budgets for development. A framework has been considered a promising way to improve productivity by reusing the software architecture, not just one part of the design or just source code. This was the reaSon why we developed PDM (Product Data Management) framework. Framework can reduce the time and efforts to develop a new PDM application. However, it also requires supporting environment since a framework is a big set of classes where their interactions are so complex. With this supporting environment, it is easy to understand the framework at a glance and easy to identify what hot spots to be refined to meet new requirements. In this paper, a new framework-supporting reuse environment based on the meta-repository was constructed for easy and convenient reuse.

  • PDF

Developing a Curriculum of English Storytelling in a Global Corporation's Context: Focus on Proficiency Building (글로벌 기업에서 스토리텔링 영어교육 콘텐츠 개발과 적용: 능숙도 향상을 목표로)

  • Shin, Dongil;Kim, Keumsun;Shim, Woojin;Kim, Na-Hee;Jeon, Jongwoon;Kim, Sehee;Kim, Joo-Yun;Jeong, Taeyoung
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.3
    • /
    • pp.265-278
    • /
    • 2018
  • This study aims to understand how a global corporation's storytelling-based curriculum is developed for improving English proficiency. Little research has been done from the perspectives of global corporation, and a curriculum of storytelling on Stein and Glenn (1979)'s model was implemented inside English Language Education Program of Samsung Display. 10 participants employed at the global corporation were taught by two instructors during the first semester of 2017 language learning program. The curriculum consisted of three modules: event focused, structure focused, character focused. Storytelling elements of each module were explicitly planned and taught by two instructors. All classes were audio-recorded and observed by the other researchers. It was found that there is a need for improving storytelling proficiency in the global corporation, and that storytelling skills can be teachable, learnable, and assessable.

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.