• Title/Summary/Keyword: 기초조사

Search Result 11,462, Processing Time 0.043 seconds

Rule Based System for Selection of Foundation Types of Building Structures (건물의 기초 형식 선정을 위한 규칙 기반 시스템)

  • 김한수;최창근
    • Computational Structural Engineering
    • /
    • v.9 no.1
    • /
    • pp.23-32
    • /
    • 1996
  • A rule based system for foundation design of building structures is developed with CLIPS in this study. The types of foundation and the allowable bearing capacity of supporting soil inferred by the rule based system for selection of foundation type, called SOFTEX, are transferred to a structural design program for building foundation. The allowable bearing capacity is calculated with N values of Standard Penetration Test. The foundation types such as independent spread footing, wall footing, combined footing and mat foundation can be inferred by the foundation merge procedure developed in this study. This procedure is based on the analysis data from the super structure and the estimated bearing capacity. By using this integrated system, structural engineers with less experience in foundation design can design the foundation system for the given superstructure and the site condition with relative ease.

  • PDF

A Study on Policies for the Improvement of Groundwater Management (지하수 관리 선진화를 위한 정책제언)

  • Kim, Jinsoo;Lee, Gyumin
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.331-331
    • /
    • 2016
  • 기후변화의 영향으로 인하여 가뭄의 발생이 잦아지고 그 기간은 늘어나고 있다. 특히 2015년에는 충남 서부 지역에 제한급수가 실시되는 등의 피해가 발생하였으며, 올해에도 일부 지역에 가뭄 피해가 예상되고 있다. 이에 따라 가뭄에 대비하기 위한 방안의 하나로, 해수담수화 및 지하수와 같은 대체 수자원 개발의 요구가 높아지고 있다. 특히 지하수의 경우에는 단기간에 최소한의 비용으로 안전한 용수(用水)를 확보할 수 있다는 측면에서 그 효용성이 높다. 그러나 지하수 역시 지표수와 마찬가지로 한정된 자원이며 생성과정에 상당한 시일이 걸린다는 점을 고려할 때, 그 활용을 위해서는 다음과 같은 정책적 고려가 필요해 보인다. 우리나라 지하수는 개별법에 따라 5개 중앙부처 및 지자체에서 소관업무별로 관리하고 있어, 체계적 관리와 자료의 통합 연계에 어려움이 있다. 또한 기본법 성격을 지닌 "지하수법"에서도 지하수 관리 등에 대해 다른 법률에 특별한 규정이 있는 경우에는 해당 법률에 따르도록 규정하여(법 제4조), 합리적 제도 개선에 한계가 있다. "온천법" 등 타법에 의한 지하수 개발 이용관련 인허가 사항을 "지하수법"으로 일원화하여 기본법으로의 역할을 강화하고, 지역별 사업별 관리는 개별 계획을 수립하도록 하는 등 체계적인 지하수의 개발 보전 정책이 필요하다. 국내 지하수 사용은 주로 관정(管井) 개발을 통해 이루어지는데, 무분별한 신규 관정의 개발은 지하수 고갈, 지반침하(sink hole)와 더불어 지하수의 수질 악화를 야기할 수 있다. 관정 개발의 실패로 발생하는 실패공은 노후 관정 및 폐관정과 더불어 방치되는 경우가 많은데, 오염물질 유입으로 지하수를 오염시키는 주요 원인으로 작용한다. 오염된 지하수는 지표수에 비하여 수질을 복원하는데 오랜 시일과 노력이 필요하므로, 사용하지 않는 불용공(不用孔)을 원상 복구하는 등 지하수의 개발에서 사후조치에 이르기까지의 체계적인 관리가 필요하다. 국토교통부는 지하수에 대한 체계적인 관리를 위해, '지하수 기초조사', '지하수 수위변동 실태조사' 및 '지하수시설 전수조사'를 실시하고 있다. 그런데 지하수 기초조사는 "지하수법" 제5조에 근거하여 1997년부터 실시되고 있으나, 예산 및 인력 부족 등으로 20여년이 지난 지금까지도 조사가 마무리되지 못하고 있는 실정이다. 한편 지하수 수위변동 실태조사는 "지하수법" 제17조 등에 근거하여 시행되고 있는 반면, 지하수시설 전수조사는 근거 법률이 마련되어 미비하다. 지하수시설 전수조사는 전국의 모든 관정, 집수정(集水井), 지하댐(underground dam) 등의 지하수 시설을 대상으로 실시되므로, 조사의 방법, 대상, 시행 절차 및 주기 등에 대한 규정 마련을 통해 관련 자료를 지속적으로 보완 관리할 필요가 있다.

  • PDF

A Study on the Improvement of Pile Foundations Based on the Analysis of Field Case Studies (말뚝기초 시공사례 실태분석을 통한 개선방안 연구)

  • Woo, Jae-Gyung;Lee, Su-Gon;Lee, Byok-Kyu;Jang, Seung-Jin
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.1
    • /
    • pp.81-92
    • /
    • 2012
  • In this study, in-depth site investigation related to design and construction of pile foundation was carried out, especially with respect to 103 large-scale bridges located in South Korea. As a result, the depths and location of investigation was unsatisfactory at the foundation investigation process. Moreover, pile load tests were not performed when the capacity of the file is calculated in planning phase, and it was difficult to determine the load capacity limit due to the fact that loading capacity was not specified in pile-loading test. The design criteria related to pile foundation does not reflect the reality of the construction site, and that causes over design, and economic inefficiency in budget. Therefore, the purposes of this study is to review case studies related to the bearing capacity of pile foundations and suggest improvements in the construction specifications.

Analysis of the cause of non-measurement seepage rate on CFRD using geophysical and geotechnical exploration (물리탐사와 지반조사를 이용한 CFRD댐 침투수량 미계측 원인분석)

  • Jong Wook Lee;Geun Soo Lee;Seong Bae Jo;Nam Ryong Kim;Jeong Yeul Lim
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.83-83
    • /
    • 2023
  • 댐의 침투수량은 준공이후 댐 안전성 확보를 나타내는 지표 중의 하나이며, 유지관리를 위해 침투수량 측정을 실시하여 관리를 하고 있다. 댐 타입별로 침투수량에 대한 허용치와 관리기준치는 다르지만, 기본적으로 댐에서 발생되는 침투수량은 측정범위를 넘지 않도록 관리를 하고 있다. 댐의 침투수량 측정은 댐 하류에 누수집수벽을 설치하고 댐에서 발생되는 침투수량을 집수한 후 삼각위어를 통하여 침투수량을 측정하고 있다. 이러한 침투수량 측정은 대부분의 댐에서 실시간으로 자동측정하고 있지만, 경우에 따라 미계측 구간이 발생되어 댐 유지관리 측면에서 미계측에 대한 원인분석이 필요한 실정이다. 일반적으로 침투수량의 미계측 원인은 계측기기, 삼각위어, 누수집수벽, 기초지반 등 다양한 원인이 있지만 명확한 원인을 찾기는 어려움이 많다. 특히, 댐 침투수량의 경우 지하수위, 댐 표면 우수, 침투수가 같이 측정되기 때문에 원인분석을 위해서는 다양한 검토가 필요하다. 본 연구의 표면차수벽형석괴댐은 누수집수벽을 통하여 침투수량을 측정하고 있으나, 일부 구간 미계측 부분이 발생하여 기초지반, 댐체 하류사면, 여수로와 댐체 접합부를 통한 누수를 원인으로 추정하였다. 이를 조사하기 위하여 전기비저항 탐사, 시추조사, 수압시험, 지하수위 측정 결과를 이용하여 누수발생 추정위치를 찾고, 침투수량이 미계측되는 원인을 분석하고자 하였다. 전기비저항 탐사는 여수로 접합부, 누수집수벽 상·하류 구간을 선정하여 측정한 결과 상·하류 저비저항대가 존재하는 구간을 추정할 수 있었다. 수압시험 결과 기초암반은 2.3 ~ 21.3 Lu(3.65×10-5 ~ 3.65×10-4 cm/sec)의 범위로 누수 가능성이 있는 높은 투수성을 갖는 부분을 확인할 수 있었다. 전기비저항 탐사, 수압시험, 지하수위 측정을 통해 누수집수벽 기초지반 누수발생 원인분석 결과 누수집수벽 기초암반을 통한 누수로 누수집수벽에 댐체를 통한 침투수량이 저류되지 못하는 현상이 발생하기 때문인 것으로 판단되었다. 침투수량계의 정상화를 위해서는 조사를 통해 확인된 누수집수벽 기초암반 누수구간의 그라우팅 보수보강이 필요함을 확인하였다.

  • PDF

서양뒤영벌(Bombus terrestris)의 적정 교미환경에 관하여

  • 심하식;김영수;김삼은;이상범;윤형주
    • Proceedings of the Korean Society of Sericultural Science Conference
    • /
    • 2003.04a
    • /
    • pp.64-64
    • /
    • 2003
  • 본 연구는 서양뒤영벌의 대량사육 체계를 확립하기 위한 기초조사로 적정 교미환경을 구명하기 위해 조사하였다. 서양뒤영벌의 적정 교미 광원 조사는 공시광원 IL30, FCL22D, FL20B, FL20PG를 사용하였으며, FCL22D에서 70%로 가장 높은 교미율이 얻어졌다. 적정 교미 온도 조사는 공시온도 15$^{\circ}C$, 2$0^{\circ}C$, $25^{\circ}C$, 3$0^{\circ}C$에서 시험하여 각 온도별 통계적 유의차를 확인 할 수 없었으나 $25^{\circ}C$에서 다소 높은 교미율을 보였다. (중략)

  • PDF

The Characteristics, Preservation and Utilization Plan of Namwon Area Tombs (남원지역 고분군의 성격과 보존 및 활용 방안)

  • Kim, Nak-Jung
    • Korean Journal of Heritage: History & Science
    • /
    • v.51 no.2
    • /
    • pp.58-77
    • /
    • 2018
  • The tomb is an important clue for understanding the ancient society of Namwon (南原). In order to establish local identity through the burial mounds and appropriately preserve and utilize it, basic investigation should be conducted to grasp the current situation of the burials. Additionally, excavation surveys and research are needed to understand the nature of the tombs. Based on this activity, local people should be informed about the importance of the tombs and participate in the preservation and utilization activities together. Preservation and utilization should be of the complex type. However, it should be improved systematically based on the fact that the tombs have not been properly investigated. In order to do this, the related organizations and budgets should be allocated at all times in Namwon City.

일본 데이터베이스 서비스 현황

  • Korea Database Promotion Center
    • Digital Contents
    • /
    • no.11 s.54
    • /
    • pp.53-55
    • /
    • 1997
  • 일본에서 데이터베이스 서비스는 산업분류 중 '정보서비스 산업'의 한 분야로 구분되어 있다. 산업레벨을 신뢰할 수 있는 자료로서, 통상산업성의 지정통계인 '특정서비스산업 실태조사'가 있으며, 시장규모 등의 기초적인 항목에 관한 조사가 매년 실시되고 있다. 여기에서는 상기자료의 1996년도판 보고서와 같은 통상산업성의 '1995년도 데이터베이스 대장총람' 등을 기초로 일본 데이터베이스 서비스 시장에 대하여 소개하고자 한다.

  • PDF

The Case Studies on Application of Mat Foundation System to Building Structure Founded on Weathered Ground (풍화대지반에 지지된 건축구조물의 전면기초 적용에 관한 사례 연구)

  • Choi, Yongkyu;Kim, Sungho;Lee, Minhee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.6
    • /
    • pp.5-18
    • /
    • 2009
  • In construction of buildings in Korea, the buildings are frequently founded on the weathered ground (weathered soil/rock, fractured rock). In this case, to make a full use of a bearing capacity of a weathered ground for economic design, the shallow mat foundation system could be used. In this study, we have researched three cases of mat foundations on the weathered ground in Korea, and analyzed and considered the design procedures and the reinforcing methods. That is, we have considered the detail design, analysis proceedings, the ground settlement evaluation proceedings, the rock face mapping evaluations after excavation and reinforcing methods of the mat foundation on the weathered ground. And large scale plate load tests on the weathered ground supporting the mat foundation were performed and also load bearing capacity and settlement of actual mat foundation, considering the scale effect, were evaluated.

  • PDF

Satisfaction of Industry Research for the College (전문대학에 대한 산업체 만족도)

  • Hong, Young-Ho;Park, Jin-Hong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.9
    • /
    • pp.3967-3974
    • /
    • 2011
  • In this study, the college's curriculum and industry satisfaction with graduates were investigated. As a result, the college education of the consumer's feedback to an education as the basis for the survey was conducted. To this end, a survey of industry conducted and analyzed a result. Questions of the survey are as follows: Foundation for industrial research, the recruitment of new employees, research on skills, basic research on curriculum, and skills related to satisfaction surveys were conducted. According to survey results the average period of employment in manufacturing. Research and development, and public officials, and management in the area has served more than three years. Distribution and service the tourism sector, mainly two years. The major practical difficulty in working theory of scarcity and insufficient foreign language skills, and inter personal relationship. Working in a variety of school curriculum and an emphasis on training relevant and practical by developing a training curriculum and the majors, colleges will improve for the satisfaction.

The study of Development of Web based Research Network for water management (웹기반 물관리 연구네트워크 구축에 관한 연구)

  • Jung, Seung-Kwon;Park, Bae-Kyoung;Kim, Dong-Ho;Lee, Hyuk
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.1349-1353
    • /
    • 2008
  • 최근 다양한 조사사업 및 연구용역을 통해 도출된 유관기관별 수질 및 오염원 자료가 방대해지고, 이를 관리하기 위한 인력 및 시간이 요구되고 있다. 그러나 이와 더불어 각 기관별 업무가 중복되고, 인력 및 시간의 부족으로 인한 조사자료의 질의 저하 및 부정확성 문제 등 오염원자료 관리에 있어 해결되어야 문제점들이 제시되고 있는 실정이다. 각 기관별 보유자료에 대한 자체 신뢰도는 매우 취약한 실정이며, 특히 생활계 오염원 자료의 기초가 되는 하수관거접속 인구, 물 사용량 자료와 축산계 오염원 자료의 기초인 인허가 자료 등은 자료간의 편차가 상당한 수준인 것으로 조사되었다. 오염총량관리제도 도입을 위한 자료 검증과정에서 기초자료 체계를 갖추는데 소요되는 기간만큼 계획의 수립이 지연 혹은 중단되는 사례가 최근 몇 년간 반복되고 있는 실정임을 감안할때 각 기관별로 계획수립에 필요한 자료의 수집 및 관리가 이루어져하는 당위성에 비추어볼 때 향후 오염총량관리제의 도입 등을 위하여 오염원 조사 뿐만 아니라 수문, 수질 기초 자료의 수집 및 체계적인 데이터베이스화를 통해 유관기관의 계획수립에 필요한 체계를 구축하고, 유역오염정보화의 근간을 마련하여야 한다. 이에 본 연구에서는 웹기반의 물관리 연구 네트워크를 구축하여 관련된 이해당사자들의 정보교류의 장으로서, 수행사업에 대한 홍보의 장으로서, 주요연구사항에 대한 학습의 장으로서 활용하게 된다. 체계적인 연구 네트워크 구성 및 유역환경정보 공유시스템의 구축은 물환경 인프라를 확충시키는데 매우 중요한 역할을 담당할 것이다.

  • PDF