• Title/Summary/Keyword: 기초매스콘크리트

Search Result 59, Processing Time 0.142 seconds

Fundamental Evaluation and Hydration Heat Analysis of Low Heat Concrete with Premixed Cement (저발열형 Premixed Cement를 사용한 콘크리트의 기초물성 평가 및 수화열 해석에 관한 연구)

  • Yoon, Ji-Hyun;Jeon, Joong-Kyu;Jeon, Chan-Ki;Kim, Ki-Hyung
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.2 no.1
    • /
    • pp.10-18
    • /
    • 2014
  • This study carried out to evaluate the hydration heat analysis and fundamental characteristics such as air content, slump, compressive strength and dry shrinkage according to concrete with premixed cement, ternary concrete and OPC concrete for using concrete with premixed cement. The results of experiment are founded that concrete with premixed cement have sufficient performances such as workability, compressive strength and dry shrinkage. Also, the results of hydration heat analysis are founded that concrete with premixed cement have more performance than ternary concrete and OPC concrete at a point of view for the quality control such as thermal crack reducing and economic benefit. Therefore, it is desirable that concrete with premixed cement should be used to rise durability performance and convenience of maintenance.

Theraml Analysis of the Heat of Hydration in Concrete with Considering Heat Reduction Techniques (온도저감 공법을 고려한 콘크리트의 수화열 해석기법에 관한 연구)

  • 김진근;김국한;양주경
    • Magazine of the Korea Concrete Institute
    • /
    • v.7 no.6
    • /
    • pp.176-185
    • /
    • 1995
  • The heat generation of hydration of cement causes the internal temperature rise and volum& change at early age, particularly in massive concrete structures. As the results of the temperature rise and external restraint conditions, the thermal stress may induce cracks in concrete. Therefore, various techniques of the thermal stress control of the mass concrete have been wid'dy used. One of them is pipecooling which reduces the temperature of concrete with flowing water. The objective of this paper' is to develop a finite element program which is capable of simulating the temperature history considering pipe-cooling effect. The numerical results in this study are in good agreement with experimental data measured in the footing(l1 x22m). Therefore, this study may provide available method to predict the hydration temperature of concrete with pip:-cooling.

Study on the Properties of the Low Heat Concrete Applied to the Mass Concrete by the Blended Cements (혼합시멘트를 사용한 저발열콘크리트의 매스콘크리트 적용을 위한 기초특성 연구)

  • Lee, Jin-Woo;Lee, Young-Hwan;Kim, Kyung-Min;Bae, Yeoun-Ki;Lee, Jae-Sam
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.05b
    • /
    • pp.641-644
    • /
    • 2006
  • Considering properties of the low-heat concrete mixed with the blended cements, the influences compared blended cements with ordinary portland cement made experiments on. (1) Blended cements were superior to OPC in the fresh concrete flow that the use of blended cements reduced chemical admixture. (2) The more the use of additive increase, the more bleeding happens. So it is considered to heights, order, and rate of placement, curing methods and so on. (3) The use of blended cements increase long term strength after 28 days, but decrease early strength and durability. So it is considered to the curing methods and early frost damage, and endurance limit.

  • PDF

A Study on Field Application of the Mass Concrete using Hydration Temperature-Reducing Binder - Focused on the Laboratory Test - (수화 온도 저감형 결합재를 이용한 매스콘크리트 현장적용에 관한 연구 - 실내시험 중심으로-)

  • Lee, Ji-Hwan;Lee, Jin-Woo;Park, Hee-Gon;Kang, Chang-Gu;Bae, Yeoun-Ki;Lee, Jae-Sam
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.259-260
    • /
    • 2010
  • This study is to investigate each mix property and physical properties and reduction properties of heat of hydration as basic experiment of reviewing the applicability of low calorific concrete.

  • PDF

Mock-up Test of Temperature Crack Reduction Method Application by Setting Time Control of Mat Foundation Mass Concrete (응결시간조정에 의한 매트기초 매스 콘크리트의 온도균열저감 공법적용의 Mock-up Test)

  • Han, Cheon-Goo;Lee, Jae-Sam;Noh, Sang-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.4
    • /
    • pp.55-61
    • /
    • 2009
  • Recently, the number of high-rise buildings being built in Korea by major construction companies for residential and commercial use has been increasing. When constructing a high-rise building, it is necessary to apply massive amounts of concrete to form a mat foundation that can withstand the huge load of the upper structure. However, it is of increasing concern that due to limitations in terms of the amount of placing equipment, available job-sites and systems for mass concrete placement in the construction field, it is not always possible to place a great quantity of concrete simultaneously in a large-scale mat foundation, and for this reason consistency between placement lift cannot be secured. In addition, a mat foundation Is likely to crack due to the stress caused by differences inhydration heat generation time. To derive a solution for these problems, this study provides test results of a hydration heat crack reduction method by applying placement lift change and setting time control with a super retarding agent for mass concrete in a large-scale mat foundation. Mock-up specimens with different mixtures and placement liftswere prepared at the job-site of a newly-constructed high-rise building. The test results show that slump flow of concrete before and after adding the super retarding agent somewhat Increases as the target retarding time gets longer, while the air content shows no great difference. The setting time was observed to be retarded as the target retarding time gets longer. As the target retarding time gets longer, compressive strength appears to be decreased at an early stage, but as time goes by, compressive strength gets higher, and the compressive strength at 28 days becomes equal or higher to that of plain concrete without a super retarding agent. For the effect of placement lift change and super retarding agent on the reduction of hydration heat, the application of 2 and 4 placement lifts and a super retarding agent makes it possible to secure consistency and reduce temperature difference between placement lifts, while also extending the time to reach peak temperature. This implies that the possibility of thermal crack induced by hydration heat is reduced. The best results are shown in the case of applying 4 placement lifts.

Zero-Crack Construction on the Fundamental Mass Concrete Using Double Bubble Sheets and Applying Low Heat Mixture (저발열 배합 및 이중버블시트에 의한 기초 매트 매스 콘크리트의 무균열 시공)

  • Park, Yong-Kyu;Song, Sung-Bin;Baek, Byung-Hoon;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.5-8
    • /
    • 2006
  • This study investigates the field application, Songdo the # 1st WORLD, on zero-crack construction of the fundamental mass concrete using double bubble sheets and applying low heat mixture. Experimental results of hydration heat analysis showed that crack modulus of concrete incorporating 20% of blast furnace slag cement was 1.0 in 120 hours, representing 50% probability of crack occurrence, thus requiring additional measures. As for a curing method, a specimen insulating two layers of vinyl chloride+double bubble sheets exhibited only $16.5^{\circ}C$ difference between upper and lower sections, and it also showed favorable workability as well as competitive economic side. Therefore it was determined to use it for curing method in this field. For the curing results of practical field, using 2 layers of vinyl chloride+double bubble sheets and applying low heat mixture on the fundamental mass concrete in 3A residential building exhibited less than only $15^{\circ}C$ difference between surface and center section of that in 5 days elapse and less than $20^{\circ}C$ in 9 days. This means that the crack by hydration heat was prevented, and other fields structures also resisted the plastic shrinkage by insulating the vinyl, sinking crack by second temping, even drying shrinkage by the mixture of low unit water. Therefore the crack on the placement has not been found so far, since the construction was started before 6 month.

  • PDF

A Fundamental Test of Temperature Crack Reduction Method Application by Setting Time Control of Large-Scaled Mat Foundation Mass Concrete (초대형 매트기초 매스 콘크리트의 응결시간조정에 의한 온도균열저감 공법적용의 기초적 실험)

  • Han, Cheon-Goo;Lee, Jae-Sam;Noh, Sang-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.3
    • /
    • pp.95-101
    • /
    • 2009
  • Constructing large-scale mat foundation mass concrete is increasing for the stability of building structure, because a lot of high rise building are being built in order to make full use of limited space. However, It is of increasing concerns that because limited placing equipments, available job-site and systems for mass concete placement in construction field do not allow to place great quantity of concrete at the same time in large scale mat foundation, consistency between placement lift can not be secured. And also, it is likely to crack due to stress caused by the difference of hydration heat generation time. To find out the solution against above problems, this study is to reconfirm the performance of normal concrete designed by mix proportion and super retarding concrete. The Fundamental test shows what happens if low heat proportioning and control method of setting time are applied at the job-site of newly constructed high rise building. The test result show that slump flow of concrete has been somewhat increased as the target retarding time gets longer, while the air content has been slightly decreased but this is no great difference from normal concrete. The setting time shows to be retarded as target retarding time gets longer, the range of retarding time increases. It is necessary to increase the amount of mix of super retarding agent in the proportion ration by setting curing temperature high since outdoor curing is about 6 hours faster than standard curing, which means the temperature of the concrete will be higher than the temperature of the surrounding environment, due to its high hydration heat when applying in a construction site. The compressive strength of super retarding concrete appears to be lower than normal concrete due to the retarding action in the early stage. However, as the time goes by, the compressive strength gets higher, and by the 28th day the strength becomes the same or higher than normal concrete.

Applicability of High-strength Mass Concrete through Setting Time and Horizontally-divided Placement (응결시간제어용 배합과 수평분할을 고려한 고강도 매스콘크리트의 적용성 평가)

  • Cho, Seung-Ho;Paik, In-Kwan;Lee, Dong-Ha;Roh, Young-Sook
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.2
    • /
    • pp.103-113
    • /
    • 2017
  • In the current study, retarding type and standard type admixture design of concrete have been proposed to control the generation of hydration heat for foundation members that use high strengths concrete. Finite element analysis also has been conducted to understand the rational placing heights of concrete. In addition, real-size structures have experimented and their results were compared to the analytical results to evaluate the reducing effect of thermal stress. For a large $6.5m{\times}6.5m{\times}3.5m$ member with retarding and standard type horizontal partition placement of concrete showed the manageable possibility of temperature difference within 25-degree Celcius between the middle and surface portion while the maximum temperature was 77-degree Celcius. Also, temperature cracking index from the finite element analysis appeared to be 1.49 that predicts no formation of cracking due to the effects of temperature. Finally, it appeared that horizontal partition placement of retarding and standard type concrete has the significant effect of reducing the thermal stress that generated by the hydration heat in the high strengths mass concrete.

Construction Considering the Difference of Setting Time of Super Retarding Agent for Reduction of Hydration Heat of Footing Mass Concrete (기초 매스콘크리트의 수화열 저감을 위한 초지연제 응결시간차 공법의 현장 적용)

  • 황인성;배정렬;윤석명;김기철;오선교;한천구
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.95-98
    • /
    • 2003
  • This paper presents the results of field experiment to apply the difference of setting tine method using super retarding agent for reducing hydration heat of mass concrete of foundation. According to the results, as the properties of fresh concrete, base concrete satisfies aimed slump and air content, and there is no difference of slump and air content with mixture of super retarding agent. The mixing ratio of super retarding agent is determined for setting time to be retarded by 12 hours in comparison with base concrete, but because the temperature of the air and concrete is low, the difference of setting time is retarded to 24 hours. In man concrete of foundation to which the difference of setting time method is applied, crack by hydration heat is not seen because the lower concrete of super retarding agent generates heat after generation of hydration heat of the upper concrete.

  • PDF

Field Application of Low Heat Concrete Using Strontium Hydroxide Based Latent Heat Material (스트론튬계 잠열재를 사용한 저발열 콘크리트의 현장적용 평가)

  • Khil, Bae Su;Yun, Hyun Do;Jeong, Ok Ran
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.5
    • /
    • pp.218-226
    • /
    • 2011
  • Low heat concrete using strontium hydroxide based latent heat material was manufactured in ready-mixed concrete batcher plant and its fundamental properties were tested. As a result of B/P test, its applicability to the construction site was verified. After B/P test, low heat concrete using strontium hydroxide based latent heat material was applied to the real construction site of bridge footing. Through the analysis and the actual measurement of the hydration heat of the concrete footing, the reduction effect of hydration heat and thermal crack was confirmed.