• Title/Summary/Keyword: 기능연속성계획

Search Result 51, Processing Time 0.027 seconds

A Basic Study for Securing the Business Continuity of Local Governments in the Event of Earthquake and Tsunami (지진 및 지진해일 발생 시 지방자치단체의 업무연속성 확보를 위한 기초 연구)

  • Shin, Hojoon;Koo, Wonhoi;Baek, Minho
    • Journal of the Society of Disaster Information
    • /
    • v.11 no.2
    • /
    • pp.227-234
    • /
    • 2015
  • In this study, the theoretical review was carried out on the concepts regarding the continuity of operation plan and business continuity management plan, international standard ISO22301 and common required functions for disaster response, and the business continuity guideline of local governments in Japan and establishment cases were analyzed to draw matters to be reflected for establishing the business continuity plan of local governments according to the occurrence of earthquake and tsunami. In conclusion, the standard guideline of central government should be prepared for establishing the business continuity plan of local governments and the foundation to establish the plan smoothly based on such guideline should be provided. Also, the business continuity plan should be prepared based on the previous established safety management plans by reflecting the regional characteristics of local governments. And, in order to establish the business continuity plan that fits the region, proper investigations can be carried out to examine the characteristics of each organizations, resources, facilities and environments. Lastly, detailed scenario on the scale of earthquake and tsunami occurrence and damages is prepared to establish the business continuity plan of local governments and conditions for prompt countermeasures according to the scale.

A Study on Continuity Management framework to build (연속성관리 구축 프레임워크 모색에 관한 연구)

  • Ko, Jaechul;Na, Sungjin;Cheung, Chongsoo
    • Journal of Korean Society of Disaster and Security
    • /
    • v.9 no.1
    • /
    • pp.1-7
    • /
    • 2016
  • Until now, there were many BCMS case studies in financial sector based on best practices in BCP(Business Continuity Planning). However, the research on the standardized continuity management system framework that practically applicable to the private and public sectors-based national infrastructure and facilities management are relatively scarce. Therefore, in this study, we research to seek the continuity management system framework suitable for the private or public sector-based facility management through the comparison reviews of domestic and international continuity management system frameworks and the reviews of continuity management components considering the characteristic of the private or public sector-based facility management.

Verification of Validity on Awareness Tool of Business Continuity for Railway Organizations (철도기관을 대상으로 한 사업연속성 인식도구의 타당성 검증)

  • Jeong-ho Chang;Chong-soo Cheung
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.195-203
    • /
    • 2023
  • Purpose: This study intends to check validity of tools for awareness of Business Continuity through measurement and analysis on the sub factors of Business Continuity by employees of railway-related organizations. Method: Based on the preceding study, sub factors of the awareness of Business Continuity are divided into 7 and the total of 29 questions were delivered to employees of railway-related organizations for investigation and analysis through the online survey tool. Result: According to EFA result, the number of factors of awareness of Business Continuity based on the theoretical ground was reduced to 7 and the total coefficient of determination was 82.616%. Checking the questions by factor, all the questions were loaded as intended. Conclusion: Validity of measurement tools of Business Continuity whose sub factors are the Context of Organization, Leadership, Planning, Operation, Support, Performance evaluation, and Improvement for railway organizations were secured through the Exploratory Factor Analysis of this study. As for the further tasks, studies on the structural relationship among internalization of business continuity, organization effectiveness, learning support environment, etc are required.

A Study on the Continuity Essential Function of Critical Infrastructure Protection System for Public Safety (공공안전을 위한 국가기반체계 보호제도의 핵심기능연속성에 관한 연구)

  • Kang, Heau-Jo
    • Journal of Digital Contents Society
    • /
    • v.18 no.4
    • /
    • pp.795-802
    • /
    • 2017
  • If the function of the national infrastructure is suspended due to natural disasters and social disasters, the damage of the national infrastructure can be a serious threat to the national security as well as the life, body and property damage of the people. In this paper, we examine the domestic and overseas trends of the national system protection system and examine the domestic and overseas trends of the national system protection system. The detailed function of the essential function continuity, essential function, succession order, authority delegation, continuity facility, continuity communication, We examined the specific issues related to testing, education and training, transferring control and directing authority, analyzing the system related to the national infrastructure protection plan, and examined the specific problems and suggested an effective improvement plan for the critical infrastructure protection system.

Organizational Program Management of Multiple Maintenance Projects Under Fund Constraints (복수 개${\cdot}$보수 프로젝트의 자금제약하 프로그램 관리 - 자원제약 마스터-일정계획을 중심으로 -)

  • Koo Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.211-218
    • /
    • 2004
  • In a large owner organization, a program manager of multiple maintenance and remodeling projects has experienced increasing scale and complexity of coordinating the M/R projects with in-house technicians who belong to multiple trade shops. This paper proposes a dual-level hierarchical planning strategy that consists of a program master plan in the long-term horizon and a master construction schedule in an operational scheduling window. A rolling horizon approach to the program master plan is proposed to deal with the external uncertainty of unknown stream of project requests. A resource-constrained scheduling algorithm is developed to generate the master construction schedule in a scheduling window. During development of the algorithm, more emphasis is placed on long-term organizational resource continuity, especially flow management of program constraint resources, than ephemeral events of an individual activity and project. Monte Carlo simulation experiments of three scheduling windows are used to evaluate the relative performance of the proposed scheduling algorithm against three popular scheduling heuristics for resource-constrained multiple projects.

A Study on the Introduction of Business Continuity Management System for Ensuring Uninterrupted Service of Public Institution Based on a Bottom-up Method (공공기관이 재난으로부터 중단없는 대국민 서비스 확보를 위한 상향식 업무연속성관리체계 도입방안에 관한 연구)

  • Choi, Deok Jae;Yang, Seung Weon;Kim, Gi Won;Kim, Dae Jin;Jang, Hyun Min;Kim, Dong Heon;Eun, Min Gyun
    • Journal of Korean Society of Disaster and Security
    • /
    • v.9 no.2
    • /
    • pp.87-91
    • /
    • 2016
  • In recent years, lots of damages appear frequently due to cyber terrorism and natural disasters such as typhoon 'Chaba', earthquake at Kyeongju. The damages lead to people's anxiety and public institutions connected directly with them also can't be free from the threat situation. In addition, public institutions must prepare business continuity issues with the highest priority in the event of disasters because they are closest with people's safety. However, preceding researches suggest needs of disaster mitigation activities management system or central office oriented top-down BCP establishing system. In this study, We grasp the current status of public institutions's business continuity plan(BCP) against disaster and we propose an efficient bottom-up method for structuring the BCP of public institutions.

A study on the guidelines for the Military Continuity of Operations Plan (군 COOP전략 지침 수립을 위한 연구)

  • Park, Chanyoung;Park, Seongsu
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.1
    • /
    • pp.291-298
    • /
    • 2022
  • Unexpected massive disasters have occurred around the world, causing enormous socio-economic damage. The military has long been enacting laws, organizing organizations and establishing systems for crisis and disaster management, but it did not consider the situation when military essential functions were suspended due to unpredictable and massive disasters. With the September 11 terrorist attacks, the U.S. military has developed COOP strategy aimed at continuing military essential functions in all crisis, and is contributed to national continuity by ensuring uninterrupted national security functions. Korean military has established a crisis and disaster management system, but focuses on managing and controlling disasters and crisis situations. Korean military needs a system to guarantee military essential functions even in national crisis beyond its management capabilities. In this study, We compared and reviewed the U.S. administration and military COOP guidelines and directives, ISO22301 international standards., and developed planning guidelines suitable for the Korean military situation by responding to detailed items based on ISO22301. In particular, the U.S. military(DoD, Army, Navy, Air Force) COOP guidelines were drawn and incorporated into the guidelines(such as protection and succession of command authority, the fulfillment of essential functions and operational security, etc.). The planning guidelines are expected to be used as reference materials for the introduction of COOP systems in the military and the establishment of plans in the future.

UAV-borne, LiDAR-based Elevation Data : Facilitating Risk Knowledge Sharing for Green and Sustainable Communities (LiDAR 활용 : 지식교류를 통한 지속가능한 녹색도시 실현에 관한 연구)

  • Lee Han Gul;Yoon Hong Sic
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.111-112
    • /
    • 2022
  • 모든 도시가 발전하고 번창하기 위해서는 핵심기반시설의 재난 및 안전이 선제적으로 확보되어야 한다. 본 논문에서는 환경핵심기반시설을 중심으로 지역사회가 지속 가능한 녹색도시로 거듭나기 위해 재난준비태세 증진에 실제 활용 가능한 위험지도를 드론에 장착한 LiDAR 센서를 통해 수집한 고도 데이터를 바탕으로 제작하였다. 나아가 지진과 같은 재난 발생 시 시설에서부터 확산하는 관리 오염물의 경로 및 범위를 시범 모의하여, 기능 연속성 계획 및 재난대응 가이드와 연계를 하는 방안을 제시함으로 지자체 중심의 통합적 지역사회의 노력이 발현될 수 있도록 기초적 연구를 진행하고, 전략적 활성화 방안을 제시하였다. 본 연구는 끊임없는 성장과 거듭되는 개발로 인해 변화하는 도시의 형상에 따라 리스크를 최신화하여 대응력을 높이고, 이해관계자들에게 시각화된 재난 범위 모의를 제시함으로써 지역사회와 지자체 역량에 따른 협력적 재난대응태세에 필요한 프레임워크 도출 및 계획수립을 가능하게 한다는 점에서 큰 의의를 지닌다. 또한, 각 영역별 전문가들의 자문을 통하여 본 논문에서 제시된 확산 모의의 방법론이 타당함을 확인하였다. 무엇보다 모호한 "가능한 신속한 자원관리"와 같은 추상적인 대응계획이 아닌, 객관적인 재난자원관리계획을 수립할 수 있게 함으로써 추후 국가적 재난 및 안전역량을 계량화시킬 수 있을 것으로 사료된다.

  • PDF

The Color Analysis Based on Formative Continuity of the Facade (파사드의 형태적 연속성에 따른 색채분석)

  • 송인호
    • Archives of design research
    • /
    • v.13 no.3
    • /
    • pp.245-252
    • /
    • 2000
  • The facade in the street is a unfixed type, thus it is not easy to investigate the characteristic of structures. In addition, a color mainly depends on sensitivity, therefore, it is very difficult to provide the solution of the problems. The purpose of this study is to investigate the relationship between a form of the facade and a color, and to introduce the methodology and the direction of the color scheme for the facade in the street. for the purpose of this study, 47 facades are empirically analyzed. Based upon the results of research analysis, this study try to find out the relationship among the formative continuity of the facade in the street, a color, and the quality of the material. From the results, it suggests the new direction for the image formation of the facade in the street centering around a color. This study concludes that the characteristics of the facade in the street is discontinuous, and the color scheme is not based on the formative continuity. Moreover, the whole street is composed of each strong individual character. In order to harmonious creation of the facade in the street, primary colors and painting colors should be constrained. Finally, the color scheme based on the formative continuity of the facade in the street should be carefully considered.

  • PDF

A Study on How to Build a Disaster Recovery System that can Minimize Recovery Time Objective(RTO) and Recovery Point Objective(RPO) to Ensure Business Continuity (비즈니스 연속성 보장을 위한 복구 시간 목표(RTO) 및 복구 지점 목표(RPO)를 최소화할 수 있는 재해복구시스템 구축 방안 연구)

  • Kang, Hyun-Sun
    • Journal of Software Assessment and Valuation
    • /
    • v.17 no.2
    • /
    • pp.91-99
    • /
    • 2021
  • In the current business environment where dependence on IT has increased rapidly, the risk from disasters or cyber-attacks is also increasing. Business continuity, the ability to continue to provide service in the event of a business disruption caused by a disaster, is essential. In other words, you need to have a plan in place to keep your core business functions uninterrupted with rapid recovery within a predetermined Recovery Time Objective (RTO) and Recovery Point Objective (RPO) time frame. In this paper, we propose a disaster recovery system construction method that can minimize RTO and RPO to ensure business continuity. The system configuration adopts Tier 7 disaster recovery model, synchronous storage replication, hot disaster recovery site, and operation management automation solution. This ensures continuity of core business with virtually no data loss and minimal RTO and RPO.