Analysis of Pillar Stability for Ground Vibration and Flyrock Impact in Underground Mining Blasting (발파진동 및 비산충격에 대한 광주 안정성 분석)

  • Park, Hyun-Sik;Kim, Ji-Soo;Ryu, Bok-Hyun;Kang, Choo-Won
    • Explosives and Blasting
    • /
    • v.30 no.2
    • /
    • pp.9-20
    • /
    • 2012
  • These days, mining industry prefers underground development for large mining because of exhaustive minning resources and large drafts and mining cavities thanks to extensive distribution of heavy excavation machines. In a mining design, to control collapse of cavities and secure stability, design of cavities and pillars are considered as very important. Therefore, this study obtained a prediction equation of blasting vibration through instrumentation for underground cavities. And we obtained theoretical shock vibration imposed on pillar through fragmentation analysis and measurement of flyrock distance. To examine the influence of pillar in underground mining blasting, we carried a finite element analysis and compared the result with prediction equation of blasting vibration, and shock vibration of flyrock when a impact was imposed on pillar and theoretical shock vibration.

Study on the Crack Generation Patterns with Change in the Geometry of Notches and Charge Conditions (노치 형상 및 장약조건의 변화에 따른 균열발생양상에 관한 연구)

  • Park, Seung-Hwan;Cho, Sang-Ho;Kim, Seung-Kon;Kim, Kwang-Yeom;Kim, Dong-Gyou
    • Tunnel and Underground Space
    • /
    • v.20 no.1
    • /
    • pp.65-72
    • /
    • 2010
  • Crack-controlled blasting method which utilizes notched charge hole has been proposed in order to achieve smooth fracture plane and minimize the excavation damage zone. In this study, the blast models, which have a notched charge hole, were analyzed using dynamic fracture process analysis software to investigate the effect of the geometry of a notched charge hole and decoupling indexes of the charge hole on crack growth control in blasting. As a result, crack extension increased and damage crack decreased with the notch length. Ultimately, stress increment factors and resultant fracture patterns with different notch length and width were analyzed in order to examine the effect factors on the crack growth controlling in rock blasts using a notched charge hole.

Comparison of the RMR Ratings by Tunnel Face Mappings and Horizontal Pre-borings at the Fault Zone in a Tunnel (터널 단층대에서 수평시추와 막장관찰에 의한 RMR값의 비교 분석)

  • Kim Chee-Hwan
    • Tunnel and Underground Space
    • /
    • v.15 no.1 s.54
    • /
    • pp.39-46
    • /
    • 2005
  • The RMR ratings, one by horizontal pre-boring in a tunnel and another by tunnel face mapping, are compared at the fault zone in a tunnel. Generally. the horizontal pre-borings were so effective as to forecast reasonably the supporting patterns after tunnel excavation. But the maximum difference in RMR ratings estimated by two methods was about 50 at a certain section of a tunnel. The differences were analyzed on each parameter of the RMR system: the rating differences were 24 in the condition of discontinuities, 15 in the RQD and 13 in the uniaxial compressive strength of rock. To minimize the gap between RMR by pre-borings and by face mappings, it is necessary to select the horizontal pre-boring location where tunnel stability could be critical and to evaluate in detail the sub-parameters of the condition of discontinuities.

A risk analysis for the determination of a tunnel support pattern (터널 지보패턴 결정을 위한 위험도 분석)

  • You, Kwang-Ho;Park, Yeon-Jun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.3
    • /
    • pp.241-250
    • /
    • 2003
  • Rock mass is very inhomogeneous in nature and data obtained by site investigations and tests are very limited. For this reason, many uncertainties are to be included in the process of constructing structures in rock mass. In the design of a tunnel, support pattern, advance rate, and excavation method, which are important design parameters, must be determined to be optimal. However, it is not easy to determine those parameters. Moreover if those parameters are determined incorrectly, unexpected risk occurs such as decrease in the stability of a tunnel or economic loss due to the excessive supports etc. In this study, how to determine an optimal support pattern and advance rate, which are the important tunnel design parameters, is introduced based on a risk analysis. It can be confirmed quantitatively that the more supported a tunnel is, the larger reliability index becomes and the more stable the tunnel becomes. Also an optimal support pattern and advance rate can be determined quantitatively by performing a risk analysis considering construction cost and the cost of loss which can be occurred due to the collapse of a tunnel.

  • PDF

The Study on the Correlation between Unconfined Compressive Strength and Point Load Strength within the Gneiss Complex in Gyunggi Province (경기 동부 지역 편마암복합체내의 일축압축강도와 점하중강도의 상관관계에 관한 연구)

  • Cha, Areum;Song, Joonho;Choi, Hyunseok;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.1
    • /
    • pp.21-26
    • /
    • 2007
  • The strength evaluation of rocks is a very important factor in designing and constructing tunnels or underground excavation. However, it takes a lot of time and endeavor to perform the unconfined compressive strength test for practice and a number of tests are limited. In order to make up for this method, the point load strength test is suggested. Generally, the strength of a rock differs depending on its type and region. However, as people unite the Point Load Strength Indexes of various regions and types to use in practice in many cases, they find difficulty in analogizing the exact strength. The purpose of this study is suggestion of the value in construction site by analizing the relation of both unconfined compressive and point load strength in the Gyeonggi gneiss complex.

  • PDF

Tunnel Cost Estimating Model Based on Standard Section and Cost Variance Index (I) - Analysis Of Critical Cost Factors - (표준단면을 이용한 터널 공사비 예측모델 개발 (I) - 공사비 영향요인 분석 -)

  • Cho, Jeongyeon;Kim, Kyong Ju;Kim, Kyoungmin;Kim, Sang Kwi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.665-675
    • /
    • 2008
  • The objective of this paper is to provide an approximate cost estimating model for tunnel that can be utilized both in quick construction cost estimating for design alternatives, and in evaluating efficiently the cost effects according to the environmental changes during design and construction stage. To meet this requirement, this study analyzes critical cost factors influencing tunnel construction costs. The cost factors include 7 elements such as rock drilling method, advancing method, type of detonator, loader capacity, unit weight and soil volume change factor, length of tunnel. This paper investigates the cost variance according to the change of the cost factors. The result is expected to be used in formulating approximate tunnel cost estimating model.

The Effect of Cement Milk Grouting on the Deformation Behavior of Jointed Rock Mass (시멘트현탁액 주입에 의한 절리암반의 역학적 특성 변화)

  • 김태혁;이정인
    • Tunnel and Underground Space
    • /
    • v.13 no.5
    • /
    • pp.331-343
    • /
    • 2003
  • Though the Grouting has been in use for a long time, it is still regarded as an technique rather than engineering. The study of ground improvement by grouting is rare especially in jointed rock mass. In this study, biaxial compression tests were performed in the jointed rock mass models with .ough surfBce joints assembled with blocks before and after grouting. The load-deformation curves of the jointed rock masses showed a non-linear relationship before grouting but showed a relatively linear deformaion behavior after grouting. Improvement ratio (deformation modulus after grouting/deformation modulus before grouting) decreased with increasing joint spacing and lateral stress. Improvement ratio decreased exponentially with increasing deformation modulus of the rock mass model before grouting. Three-dimensional FDM analysis was performed to a highway tunnel case using experimental data of grouted rock. The convergence of the tunnel predicted after grouting by the numerical modelling coincided with those attained from the field measurement.

Estimation of design parameters of TBM using punch penetration and Cerchar abrasiveness test (압입시험 및 세르샤 마모시험에 의한 TBM의 설계변수 추정)

  • Jeong, Ho-Young;Lee, Sudeuk;Jeon, Seokwon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.2
    • /
    • pp.237-248
    • /
    • 2014
  • Linear cutting test is known to be very effective to determine machine parameters (i.e. thrust force and torque) and to estimate penetration rate of TBM and other operation conditions. Although the linear cutting test has significant advantages, the test is expensive and time-consuming because it requires large size specimen and high load capacity of the testing machine. Therefore, a few empirical prediction models (e.g. CSM, NTNU and QTBM) alternatively adopt laboratory index tests to estimate design parameters of TBM. This study discusses the estimation method of TBM machine parameters and disc cutter consumption using punch penetration test and Cerchar abrasion test of which the researches are rare. The cutter forces and cutter consumption can be estimated by the empirical models derived from the relationship between laboratory test result with field data and linear cutting test data. In addition, the estimation process was programmed through which the design parameters of TBM (e.g. thrust, torque, penetration rate, and cutter consumption) are automatically estimated using laboratory test results.

The Characteristics of Hydrodynamic Dispersion in a Horizontally Heterogeneous Fractured Rock Through Single Well Injection Withdrawal Tracer Tests (수평적으로 불균질한 단열암반층에서 단공주입양수 추적자시험에 의한 수리분산특성)

  • Kang, Dong-Hwan;Chung, Sang-Yong;Kim, Byung-Woo
    • Journal of Soil and Groundwater Environment
    • /
    • v.11 no.6
    • /
    • pp.53-60
    • /
    • 2006
  • Single well injection withdrawal tracer tests with bromide were carried out at two wells developed in a horizontally heterogeneous fractured rock. The hydraulic conductivity of TW-1 well was 5 times larger than TW-2 well, and the average linear velocity of TW-2 well was 1.8 times faster than TW-1 well. The difference of hydrodynamic dispersions of two wells in the fractured rock was studied with the analysis of concentration breakthrough curves and cumulative mass recovery curves of bromide with withdrawal time, and the estimation of average travel distance, pore velocity, longitudinal dispersivity and longitudinal dispersion coefficient. The average travel distances of bromide were estimated to be 3.00 m in TW-1 well and 5.62 m in TW-2 well. The average pore velocities for the injection/withdrawal phase were estimated to be $4.31\;{\times}\;10^{-4}\;m/sec$ in TW-1 well and $8.08\;{\times}\;10^{-4}\;m/sec$ in TW-2 well. Average travel distance and pore velocity were higher in TW-2 well because of small effective porosity. Longitudinal dispersivities were estimated to be 28.73 cm in TW-1 well and 18.49 cm in TW-2 well, and bromide transport was 1.55 times faster in TW-1 well. Longitudinal dispersion coefficients were estimated to be $5.14\;{\times}\;10^{-6}\;m^2/sec$ in TW-1 well and $6.06\;{\times}\;10^{-6}\;m^2/sec$ in TW-2 well, and diffusion area was 1.18 times larger in TW-2 well.

Effects of Well Parameters Analysis Techniques on Evaluation of Well Efficiency in Step-Drawdown Test (단계양수시험 해석시 우물상수 산정 방법이 우물효율에 미치는 영향)

  • Chung, Sang-Yong;Kim, Byung-Woo;Kim, Gyoo-Bum;Kweon, Hae-Woo
    • The Journal of Engineering Geology
    • /
    • v.19 no.1
    • /
    • pp.71-79
    • /
    • 2009
  • Step-drawdown tests were conducted at four pumping Wells, two in porous media and two in fractured rocks, respectively. In general, P = 2.0 suggested by Jacob (1947) is applied to porous media and fractured rocks in terms of drawdowns of step-drawdown test. In an attempt to review problems of linear model (Jacob's graphic method) in interpreting the step-draw down test, the outcomes of well parameters (aquifer loss coefficient (B), well loss coefficient (C) and well loss exponent (P)) calculated from linear and nonlinear model (Labadie and Helweg's least-squares method) were compared and analyzed. The values of C and P calculated from linear and nonlinear models differed according to permeability of aquifer and the conditions of pumping well. The value C obtained from nonlinear models in porous media and fractured rocks is about $10^0{\sim}10^{-2}$ and $10^{-3}{\sim}10^{-6}$ times lower than in their linear models, respectively. The value P of porous media obtained from nonlinear model ranged from 2.123 to 2.775, while it ranged from 3.459 to 5.635 for fractured rocks. In case of nonlinear model, well loss highly depends on the value P. At this time, well efficiencies calculated from linear and nonlinear models were $1.56{\sim}14.89%$ for porous media and $8.73{\sim}24.71%$ for fractured rocks, showing a significant error according to chosen models. In nonlinear model, it was found that the regression analysis using the least squares method was very useful to interpret step-drawdown test in all aquifer.