• Title/Summary/Keyword: 굴착시공

Search Result 728, Processing Time 0.024 seconds

Automatic Detection System of Underground Pipe Using 3D GPR Exploration Data and Deep Convolutional Neural Networks

  • Son, Jeong-Woo;Moon, Gwi-Seong;Kim, Yoon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.26 no.2
    • /
    • pp.27-37
    • /
    • 2021
  • In this paper, we propose Automatic detection system of underground pipe which automatically detects underground pipe to help experts. Actual location of underground pipe does not match with blueprint due to various factors such as ground changes over time, construction discrepancies, etc. So, various accidents occur during excavation or just by ageing. Locating underground utilities is done through GPR exploration to prevent these accidents but there are shortage of experts, because GPR data is enormous and takes long time to analyze. In this paper, To analyze 3D GPR data automatically, we use 3D image segmentation, one of deep learning technique, and propose proper data generation algorithm. We also propose data augmentation technique and pre-processing module that are adequate to GPR data. In experiment results, we found the possibility for pipe analysis using image segmentation through our system recorded the performance of F1 score 40.4%.

A Case Study on Blasting at the Tunnel Excavation in an Adjacent Section of a Subway Station (지하철역 인접구간에서의 터널 발파굴착 사례)

  • Lee, Hyo;Kim, Jeoung-Hwan;Hwang, Nam-Sun
    • Explosives and Blasting
    • /
    • v.40 no.2
    • /
    • pp.25-34
    • /
    • 2022
  • Recently, there has been an increasing number of cases of improving constructability by using electronic detonators with precise delay time in tunnel blasting sites. This case is a case of conducting test blasting using with non-electric detonator and electronic detonator at the site of 『Seoul Metropolitan Area Express Railroad Route A Private Investment Project Section 00』 that requires careful management of vibration and noise. Although this site was designed with a non-electric detonator, it was attempted to improve the advance rate and control vibration and noise by mixing the non-electric detonator and the electronic detonator due to the decrease in the advance rate. As a result of the blasting, the target value was achieved with an advance rate of about 85% and a maximum measured value of vibration and noise is 0.215cm/sec and 73.22dB(A) which were measured below regulatory standards. As blasting works in downtown areas, it is necessary to designate measurement and management objects to continuously manage vibration and noise.

A Study on the Characteristics of Member Force, Horizontal Displacement and Concrete Strength by Design Elements of SPW Retaining Walls (SPW 흙막이 벽체의 설계요소별 부재력과 수평변위 및 콘크리트강도 특성 연구)

  • Wan-Ho Kim;Yu-Seok Shin;Yeong-Jin Lee;Yong-Chai Chang;Kang-Il Lee
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.1
    • /
    • pp.75-85
    • /
    • 2023
  • In areas where excavation works are carried out, it is very important to select a retaining wall method to minimize ground water level and ground subsidence changes. In this regard, the use of Secant Pile Wall(SPW) method, which can complement the disadvantages of the CIP method, is gradually domestic increasing for the construction of retaining wall method. This study investigated the design elements of the SPW method and the interrelationship between the structural stability factors of the wall. The design elements for the retaining method are the overlap length between piles, pile diameter, and the specifications of the H-Beam specifications, while the structural stability factors of the wall are the bending stress, shear stress, horizontal displacement, and concrete strength. The study results showed that the pile diameter and H-Beam specifications have a significant impact on the capacity of the H-Beam, the overlap length and pile diameter have a significant impact on the horizontal displacement, and the pile diameter and H-Beam specifications have a significant impact on the required strength of the concrete.

The Factors Affecting the Unconfined Compressive Strength of C.S.G Materials (C.S.G 재료의 일축압축강도에 미치는 영향인자)

  • Kim, Ki-Young
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.10
    • /
    • pp.33-45
    • /
    • 2006
  • C.S.G is a material made by adding cement and water to rock-like material such as riverbed gravel or excavation muck that can be obtained easily near dam si. Recently, the use of C.S.G is gradually increasing as the construction material for dam, road, revement and so on. Commonly, the strength characteristics of C.S.G is affected by various influence factors such as grade, unit cement, age and water contents. In this study, a series of compaction test and unconfined compressive strength test were performed to investigate the relationship between a strength and influence factors such as three kinds of gradation, age, unit cement and water contents with riverbed gravel in Hwa Buk dam. The results show that strength Properties of C.S.G is variously affected by these influence factors. Especially, gradation and water contents are found to be very important factors fur determining the strength of C.S.G material. And, from the results of experimental study, the correlation equations between uncompressive strength and these factors are proposed.

Expansion Ratio and Ultimate Load of Pulse-Discharge Bulbed Anchors (펄스방전 그라운드 앵커의 확공특성 및 극한인발력에 관한 연구)

  • Kim, Nak-Kyung;Kim, Sung-Kyu;Joo, Yong-Sun;Seo, Hyo-Kyun;Kim, Sun-Ju
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.7
    • /
    • pp.5-10
    • /
    • 2009
  • The ground anchor is not usually used in soft clay and loose sand, because the pullout resistance of anchors can not be guaranteed. However, there is a method to increase the capacity of anchors using electric discharge geotechnical technologies, which are also known as pulse discharge and electric-spark technologies. The pulse-discharge anchor has a bulbed (or underreamed) bond length that is expanded by high voltage electrokinetic pulse energy. 24 anchors were installed in the weathered soil and sandy clay at the Geotechnical Experimentation Site at Sungkyunkwan University in Suwon, Korea. In this study, in order to define a relation between expansion rate of the anchor diameter and ultimate load, anchor load tests were carried out in accordance with testing procedures by AASHTO (AASHTO 1990) and FHWA (Weatheb 1998). And then several anchors were exhumed to measure the diameter of the pulse discharge anchors.

Tunnel Cost Estimating Model Based on Standard Section and Cost Variance Index (I) - Analysis Of Critical Cost Factors - (표준단면을 이용한 터널 공사비 예측모델 개발 (I) - 공사비 영향요인 분석 -)

  • Cho, Jeongyeon;Kim, Kyong Ju;Kim, Kyoungmin;Kim, Sang Kwi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.665-675
    • /
    • 2008
  • The objective of this paper is to provide an approximate cost estimating model for tunnel that can be utilized both in quick construction cost estimating for design alternatives, and in evaluating efficiently the cost effects according to the environmental changes during design and construction stage. To meet this requirement, this study analyzes critical cost factors influencing tunnel construction costs. The cost factors include 7 elements such as rock drilling method, advancing method, type of detonator, loader capacity, unit weight and soil volume change factor, length of tunnel. This paper investigates the cost variance according to the change of the cost factors. The result is expected to be used in formulating approximate tunnel cost estimating model.

A feasibility study on the estimation of a potential relaxed zone in the discontinuum coupled analysis of a subsea tunnel (해저터널의 불연속체 연계해석 시 잠재적 이완영역 평가 방법의 타당성 연구)

  • You, Kwang-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.2
    • /
    • pp.141-150
    • /
    • 2009
  • When constructing a subsea tunnel in discontinuous rock mass, fluid flow in joints has a great influence on the behavior of the tunnel so that hydro-mechanical coupled analysis should be performed for the stability estimation. In practice, relaxed rock load is generally used for the design of tunnel concrete lining. In a continuum analysis, a method based on the distribution of local safety factor around a tunnel was proposed for the estimation of a potential relaxed zone. However, in the case of discontinuous rock mass in which joints are developed, the whole stability of tunnels depends on the behavior of the joints. In this study, therefore, a method is proposed for the estimation of a potential relaxed zone occurred by the excavation of a tunnel in discontinuous rock mass. The suggested method is validated by sensitivity analysis and the comparison with the results of continuum analysis.

Stability Assessment of Tunnel Excavation Face Utilizing Characteristics of Collapse Cases (터널 시공현장 붕괴 사례를 이용한 막장의 안정성 평가 연구)

  • Kim, Mintae
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.2
    • /
    • pp.55-64
    • /
    • 2024
  • While shield tunneling has demonstrated stability in international cases, the new Austrian tunneling method (NATM) encounters challenges in urban environments with shallow cover, weathered ground, and high groundwater levels. This paper introduces two typical collapse scenarios observed in urban areas, specifically within weathered bedrock and uncemented sandy soil layers. The collapses are analyzed using six stability evaluation methods, and the results are synthesized to assess the excavation face stability through a hexagonal diagram. The study finds a consistent agreement between the analysis results of the two collapsed tunnel sites and the evaluation outcomes. The employment of the stability evaluation diagram, a comprehensive method that considers the ground characteristics of the target tunnel, proves crucial for ensuring barrier stability during the tunnel design stage. This method is essential for a holistic evaluation, especially when addressing challenging ground conditions in urban settings.

3-Dimensional Tunnel Analyses for the Prediction of Fault Zones (파쇄대 예측을 위한 터널의 3차원 수치해석)

  • 이인모;김돈희;이석원;박영진;안형준
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.4
    • /
    • pp.99-112
    • /
    • 1999
  • When there exists a fault zone ahead of the tunnel face and a tunnel is excavated without perceiving its existence, it will cause stress concentration in the region between the tunnel face and the fault zone because of the influence of the fault zone on the arching phenomena. Because the underground structure has many unreliable factors in the design stage, the prediction of a fault zone ahead of the tunnel face by monitoring plans during tunnel construction and the rapid establishment of appropriate support system are required for more economical and safer tunnel construction. Recent study shows that longitudinal displacement changes during excavation due to the change of rock property, and if longitudinal displacement and settlement, which are measured in the field, are considered together in displacement analysis, the prediction of change in rock mass property is possible. This study provided the method for the prediction of fault zones by analyzing the changes of L/C and (Ll-Lr)/C ratio (L= longitudinal displacement at crown, C = settlement at crown, Ll = longitudinal displacement at left sidewall, Lr = longitudinal displacement at right sidewall) and the stereographic projection of displacement vectors which were obtained from the 3-D numerical analysis of hybrid method in various initial stress conditions.

  • PDF

Behavior Case Study of Temporary Structures during Underground Extension Work by Field Measurement (현장계측을 통한 지하증축공사 중 가설구조물의 거동 사례연구)

  • Kim, Uiseok;Min, Byungchan;Kang, Minkyu;Kim, Dongkwan;Choi, Hangseok
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.8
    • /
    • pp.5-13
    • /
    • 2020
  • During the construction of underground space expansion of old facilities, it is necessary to secure temporary residence space for existing residents as well as noise and vibration issues during construction, and in the case of commercial, industrial, and social use, damage is expected from suspension of the use of facilities. There is a need for a technology that minimizes noise and vibration during underground expansion, enabling the use of existing facilities even during construction. In this study, a practical underground extension model is proposed by analyzing the behavior of the temporary structure and the surrounding ground as a result of measurement at each construction stage for a actual construction site. In order to solve the problems that occurred during construction, the basement slabs were placed in advance after the initial excavation. The measurement results (building inclinometer, crack measurement system, structure inclinometer and surface settlement meter) at the site were reviewed to analyze the behavior of the temporary structure and surrounding ground. As a result, it was confirmed that the inclinometer of the building and the structural inclinometer showed a tendency that the displacement after the slab line was placed was reduced or converged. The placement of basement slabs during underground extension not only relived the noise and vibration problems during construction, but also secured the stability of structures.