• Title/Summary/Keyword: 굴착설계

Search Result 547, Processing Time 0.024 seconds

Rock Mass Classification and Its Use in Blast Design for Tunneling (암분류기법과 터널굴착을 위한 발파설계에의 활용)

  • Ryu Chang-Ha;SunWoo Choon;Choi Byung-Hee
    • Explosives and Blasting
    • /
    • v.24 no.1
    • /
    • pp.63-69
    • /
    • 2006
  • Building tunnels means dealing with what rock is encountered. Relocation of the site of the underground structure is rarely possible. Tunneling engineers and miners have to cope with the quality of the rock mass as it is. Different tunneling philosophies and different rock classification methods have been developed in various countries. Most of the rock classification methods are based on the response of the rock mass to the excavation. Tunnel support requirements could be assessed analytically, supplemented by rock mass classification predictions, and verified by measurements during construction. Rock mass classifications on their own should only be used for preliminary, planning purposes and not for final tunnel support. Design of blast pattern in tunneling projects in Korea is also mostly prepared according to the general rock classification methods such as RMR or Q. They, however, do not take into account the blast performance, and as a consequence, produce poor blasting results. In this paper, the methods of general rock classification and blast design for tunnel excavation in Korea are reviewed, and efforts to develop a new classification method, reflecting the blasting performance, are presented.

A Case Study of Building Damage Risk Assessment Due to the Strutted Excavation: Design Aspects (지보굴착에 따르는 인접건물의 손상위험도 평가사례: 설계단계)

  • Lee Sun-Jae;Song Tae-Won;Lee Youn-Sang;Song Young-Han;Kim Jae-Kwon
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.10
    • /
    • pp.99-112
    • /
    • 2005
  • The ground excavation in the urban area induces in general ground movement and subsequent damage on the adjacent building structures. So the essentials in the designing stage are the prediction of ground movement induced by the ground excavation and the damage risk assessment of buildings adjacent to the excavation. A propsed prediction method of the ground movement induced by the strutted excavation has been studied with due consideration of the existing ground movement prediction methods. A building damage risk assessment method based on the angular distortion and the horizontal strain derived from the green-field ground movement is also proposed. These methods have been applied successfully in the on-going deep excavation project in Singapore.

Drilling Techniques for Geothermal Well and Environmental Impacts (지열발전을 위한 지열정 굴착기법과 환경영향)

  • Jeoung, Jae-Hyeung
    • New & Renewable Energy
    • /
    • v.3 no.4
    • /
    • pp.16-21
    • /
    • 2007
  • 국토가 좁고 천연자원이 부족한 우리나라에서 전기생산의 대부분을 원자력 발전에 의존하고, 화력발전을 많이 활용하는 것은 당연한 일이다. 그러나, 각종 신기술의 개발과 함께 신에너지원에 대한 가능성이 증대되고 있어 이에 대한 연구와 투자도 소홀히 할 수 없는 상황에 있다. 신에너지원으로 거론되는 여러 가지 대안 가운데 비교적 국내기술로 접근하기 쉬운 부분이 지열을 활용한 분야이다. 일본, 필리핀, 인도네시아와 같은 화산국은 물론이고 우리나라와 같이 활화산이 없는 나라에서도 대심도에서는 지열자원이 고르게 분포해해 있을 것으로 추정되어 개발된 지열활용기술은 그 수요처가 상당히 젊다고 할 수 있다. 본 연구에서는 지열활용을 위하여 필수적으로 사용되는 지열정 굴착기법과 건설에 따라 우려되는 환경영향을 정리하였다. 지열활용에 사용되는 지열정의 종류를 파악하고, 그에 따른 굴착기술을 소개하였으며, 저비용 고효율 굴착을 위한 요소기술들을 정리하였다. 그리고, 국외의 자료를 통하여 지열발전 프로젝트에서 우려되는 환경영향을 조사하여 국내의 상황과 비교하여 고찰하였다.

  • PDF

Drilling Techniques for Geothermal Well and Environmental Impacts (지열정 굴착기법과 환경영향)

  • Jeoung, Jae-Hyeung;Jang, Yong-Jin
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.533-537
    • /
    • 2007
  • 국토가 좁고 천연자원이 부족한 우라나라에서 전기생산의 대부분을 원자력 발전에 의존하고, 화력발전을 많이 활용하는 것은 당연한 일이다. 그러나, 각종 신기술의 개발과 함께 신에너지원에 대한 가능성이 증대되고 있어 이에 대한 연구와 투자도 소홀히 할 수 없는 상황에 있다. 신에너지원으로 거론되는 여러 가지 대안 가운데 비교적 국내기술로 접근하기 쉬운 부분이 지열을 활용한 분야이다. 일본, 필리핀, 인도네시아와 같은 화산국은 물론이고 우리나라와 같이 활화산이 없는 나라에서도 대심도에서는 지열자원이 고르게 분포해 있을 것으로 추정되어 개발된 지열활용기술은 그 수요처가 상당히 넓다고 할 수 있다. 본 연구에서는 지열활용을 위하여 필수적으로 사용되는 지열정 굴착기법과 건설에 따라 우려되는 환경영향을 정리하였다. 지열활용에 사용되는 지열정의 종류를 파악하고, 그에 따른 굴착기술을 소개하였으며, 저비용 고효율 굴착을 위한 요소기술들을 정리하였다. 그리고, 국외의 자료를 통하여 지열발전 프로젝트에서 우려되는 환경영향을 조사하여 국내의 상황과 비교하여 고찰하였다.

  • PDF

NATM Tunnel Designs in Taiwan High Speed Rail Project (대만 고속전철에 적용한 NATM 터널설계)

  • Kim, Dal-Sun
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.424-430
    • /
    • 2001
  • 현대건설(주)는 사업 주관사로서 해외 업체와 대만고속전철 턴키 공사를 2000 년 1 월에 공동으로 수주하였다. 고속전철의 총 연장 길이는 약 326 km 이며, 정거장 10 개소, Depot 및 야적장으로 구성되어 있다. 이번에 수주한 공구는 2 개의 연속된 공구 (C230, C240) 이며, 본 논문은 총 연장 23.6km 인 C230 공구에 대한 설계 과정을 수록하였다. C230 공구는 NATM 터널 (6.2km), Cut-and-Cover 터널 (0.5km), 교량 (7.8km) 및 토공 구간 (9.1km)으로 구성되어 있다. 전 구간의 지반조건은 "매우" 취약한 매질로 구성되어 있으며, 층리나 절리는 거의 발달되어 있지 않다. 따라서 화약발파에 의한 터널 굴착은 기계식 굴착 (Back-hoe Excavation) 방법에 비하여 현실성이 없는 것으로 분석되었다. 취약한 지반에서 계측 결과를 기준으로 굴착 공간을 안전하게 유지할 수 있는 NATM 보강 설계가 현지 암반조건에 가장 이상적인 방법으로 제시되었다. 특히, NAT설계는 대형 아파트 지역과 파쇄대 및 지하수 침투 예상지역을 통과하기 위하여 계측에 의한 Feed-back 과정을 탄력적으로 적용하도록 계획하였다.

  • PDF

Lateral Pressure on ,anchored Excavation Retention walls (앵카지지 굴착흙막이벽에 작용하는 측방토압)

  • 홍원표;이기준
    • Geotechnical Engineering
    • /
    • v.8 no.4
    • /
    • pp.81-98
    • /
    • 1992
  • Deep excavation increases utility of underground spaces for high buildings. subways etc. To excavate vertically the underground, safe earth retaining walls and supporting systems should be prepared. Recently anchors have been used to support the excavation wall. The anchored excavation has some advantages toprovide working space for underground construction. In this paper the prestressed anchor loads were measured by load cells which attacted to the anchors to support the excavation walls at eight construction fields. where under-ground deep excavation was performed on cohesionless soils. The lateral pressures on the retaining walls, which are estimated from the measured anchor forces, shows a trapezoidal distribution that the pressure increases linearly with depth from the ground surface to 30% of the excavation depth and then keeps constant value regardless of the stiffness of the walls. The maximum lateral pressure was same to 63% of the Ranking active earth pressure or 17% of the vertical overburden pressure at the final depth The investigation of the measured lateral pressure on the anchored excavation walls shows that empirical earth pressure diagram presented by Terzaghi-Peck and Tschebotarioff could be applied with some modifications to determine anchor loads for the anchored excavation in cohesionless soils.

  • PDF

Analysis of ground settlement due to circular shaft excavation (원형 수직구 굴착에 따른 발생 지반침하 분석)

  • Moorak Son;Kangryel Lee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.2
    • /
    • pp.87-99
    • /
    • 2023
  • Ground excavation inevitably causes ground displacement of adjacent ground, and structures and facilities exposed to ground displacement may suffer various damages. Therefore, in order to minimize the damage and damage to adjacent structures and facilities caused by excavation, ground displacement (settlement and horizontal displacement) in the adjacent ground caused by excavation must first be predicted. There is many ground displacement information induced by general braced cut excavation, but the information is not enough for circular shaft excavation. This study aims to provide information on the estimation of ground settlement caused by circular shaft excavation through the case analysis of circular shafts and comparison with braced cut excavation. From this study, it was found that the use of the settlement criterion of braced cut excavation as the settlement management criterion for circular shaft excavation is a conservative approach in terms of safety. But when considering the economic aspect, it may result in overdesign of the wall and therefore, a more reasonable settlement criterion can be needed for circular shaft excavation.

Suggestions for Rock Classification in Blasting (발파와 관련된 암반분류에 대한 고찰)

  • 선우춘;신희순;류창하
    • Explosives and Blasting
    • /
    • v.20 no.1
    • /
    • pp.35-50
    • /
    • 2002
  • 터널굴착이나 사면절취 등과 같은 굴착문제에 있어서 굴착방법을 결정하기 위해 대상암반에 대한 리핑암이나 발파암의 구분이 우선되며, 다음에 발파에 의한 굴착방법이 선정되었을지라도 화약량 및 종류, 천공방법 등 발파설계를 위해서 추가적으로 발파암에 대한 세부적인 분류가 필요하다. 일반적으로 RMR이나 Q시스템과 같은 암반분류법이 많이 사용되고 있지만, 발파암에 대한 표준적인 암반분류법이 없으며, 국내에서도 발파암 분류에 대한 연구가 거의 전무한 상태로 발파암의 분류요소로 사용될 수 있는 요소를 구하기 위한 연구가 필요하다. 따라서 이 논문에서는 앞으로 국내에서 발파암 분류연구에 대한 방향제시를 위해서 발파와 암석의 역학적 특성, 지질구조와 불연속면의 특성과의 관계나 굴착과 관련된 암반분류에 대한 여러 논문사례를 통하여 발파암의 분류요소와 분류방법 등에 대해 언급한다.

Evaluation of Optimal Dredging Section Area for Burying Submarine Cable across the Coastal Waterways (연안항로내 해저케이블 매설을 위한 적정 굴착단면의 산정)

  • Kim, Hui-Jae;Lee, Dong-Hyeon;Lee, Jung-U
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2013.10a
    • /
    • pp.151-153
    • /
    • 2013
  • 최근 해양에너지플랜트 및 도서지역을 연결시키기 위한 해저 파이프라인 및 통신, 전력 케이블 매설공사가 빈번하게 이루어지고 있다. 특히, 연안항로를 가로지르는 해저케이블 매설공사에는 준설장비를 동원하여 해저부를 굴착하고 케이블을 부설한 후 상단을 덮어 보호하는 일련의 작업과정이 행해지며 이 과정에서 해저저질의 상태, 준설심도, 조류 또는 연안류의 흐름강도, 수심, 통항선박 등 다양한 조건에 따라 단면의 굴착심도 및 폭이 결정되며, 작업의 순서 또는 방법에 따라 여굴의 정도도 변하게 된다. 본 연구에서는 우리나라 서해안 실제해역에서 연안 도서를 연결하는 전력, 통신망의 개통을 위한 해저케이블 부설과 관련한 굴착단면의 실태를 실제 현장여건과 관련해서 적정단면과 준설물량의 산정을 다루어 해저환경변화에 대처하기 위한 기초자료를 제공하고자 하였다. 이를 위하여 대상해역에서 주요설계 지침에 따른 해저부 굴착단면의 평가와 적정단면을 검토하였으며, 이 단면에 따른 준설 적정물량을 산정하여 작업공정에 활용할 수 있도록 하였다.

  • PDF

서울 남부순환 도로, 관악터널 설계

  • 지왕률;박성록;황기수;정해성;이철수
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2002.03a
    • /
    • pp.19-26
    • /
    • 2002
  • 서울시에 건설될 새로운 내부 남부순한 도로는 제2 성산대교와 서쪽의 주요 고속화 도로를 연결하는 초고속 도로망을 구축할 것이다. 노선연장은 지하구조물 10.4km를 포함하여 총 34.8km에 달한다. 도로망이 완성되면 수도 서울 중심가의 심한 교통체증은 상당부분 완화 될 것이다. 공사비 7000억원에 이르는 대규모의 서울 남부순환 도로는 3차선 병렬터널 3개 공구를 포함하는 것으로 계획되어졌다. 이들 터널은 3차선, 일방향, 병렬터널로서 계곡부를 관통하며 굴착공법은 대부분 발파공법으로 계획되어져 있다. 가장 긴 관악터널은 지질조건이 복잡하며 따라서, 이런 지반에 적용성이 좋은 발파공법에 의한 굴착으로 계획되어졌다. 특히, 갱구부는 지질상태가 매우 불량하여 풍화암 자연상태로 설계하는 것이 불가능하였다. 설계자들은 터널 화재와 교통사고 등과 같은 터널내에서의 긴급상황에 대한 최적의 대책 수립에 중점을 두어야만 했다. 관악 터널 상부에 위치한 수로관을 통과하는 방법을 찾는 것이 당면 최대 관건이었다. 또한, 갱구부 주변지역의 환경을 보존하고 현장의 자연적인 아름다움 을 유지하기 위하여 굴착량을 최소화하는 공법선정이 중요하였다.

  • PDF