• Title/Summary/Keyword: 구조 안전관리 방안

Search Result 328, Processing Time 0.027 seconds

공기업의 전사이익경영을 통한 경쟁력강화 방안

  • Kim, Tae-Ho;Choe, U-Jong
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2011.11a
    • /
    • pp.225-231
    • /
    • 2011
  • 공기업의 수익성 구조의 개선을 통한 경쟁력강화방안을 제시하고자 한다. 이익경영 현황을 분석하고, 혁신경영으로 이익지대의 확대하고자 한다. 이익지표는 수익성경영의 핵심경영관리지표이다. 공기업의 원가구조와 수익성경영현황 및 제약조건 등을 파악하여 전사이익경영을 위한 전략을 제시하고자 한다.

  • PDF

Categorizing Safety Management Elements for Fire Preparation and Assessemnt of Fire Hazard (화재에 대비한 지하공간의 안전관리 요소분류 및 화재위험성 평가방안)

  • Bae, Yoonshin;Park, Jihye
    • Journal of the Society of Disaster Information
    • /
    • v.7 no.2
    • /
    • pp.96-109
    • /
    • 2011
  • In this study, risk categorized five safety management elements(equipment and structure, evacuation, lifesaving and fire extinguishing, performance based fire safety plan, operations management) were classified in order to establish safety system of underground space. Using classified safety management elements, assessment of fire hazard was performed. After calculating the grade of evaluation categories, assessment of fire hazard was suggested. The three grades of evaluation categories are classified as to importance and four criteria of evaluation are classified as to check result based on subdivisions.

Improvements of Field Safety Management Using Image Processing (영상처리를 활용한 현장 안전관리 개선방안)

  • Jang, Min-Woo;Lee, Min-Yong;Gu, Do-Jin;Shin, Dong-Ho;Kang, Woo-chul
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2019.10a
    • /
    • pp.710-712
    • /
    • 2019
  • 오늘 날 산업현장에서는 현장에서의 생산성 향상과 안전을 강화하기 위한 방법으로 IT기술을 접목한 현장 안전관리 분야가 비약적으로 성장하고 있다. 특히 제조업, 건설업 분야의 산업현장에서 발생하는 안전사고에 대응하기 위해 현장 관리자를 보조하는 IT 기술은 지속적인 분석과 개선이 요구된다. 본 논문에서는 산업현장에 투입되는 근로자의 안전을 위하여 인물 Tracking과 광학문자인식 기법을 활용하여 스마트 현장 안전관리 시스템의 구조와 개선방안을 제시한다.

원전 수명 관리 연구 및 주기적 안전성 검토

  • 정일석
    • Nuclear industry
    • /
    • v.19 no.11 s.201
    • /
    • pp.39-46
    • /
    • 1999
  • 국내 가동 원전의 운전 연수가 증가함에 따라 장기 사용 원전의 안전성 향상과 수명 관리 연구가 진행되고 있다. 원전 수명 관리는 발전소 운전 안전성과 성능을 유지하면서 최적 경제 시점인 최적 수명까지 발전소를 운전하기 위한 제반 기술 활동이다. 적절한 수명 관리로 원전을 최적 수명까지 운전하더라도 발전소는 노화에 의해 운전 안전성이 영향을 받거나 저하되지 않아야 한다. 발전 설비의 노화에는 실제의 기기나 구조물이 경년 열화에 의해 노화되는 물리적 노화와 설계 기술의 발달과 새로운 안전 개념의 적용으로 기존 기술이 낙후하는 비물리적 노화로 구분할 수 있다. 물리적 노화는 기기$\cdot$구조물$\cdot$계통의 물리적 상태 변화로 성능을 저하시키고, 비물리적 노화는 발전소 계통의 안전 개념$\cdot$기준$\cdot$기술이 새롭게 변화되지 않은 것이다. 본 논문에서는 물리적 노화는 수명 관리 연구, 비물리적 노화는 안전성 관리의 측면에서 검토하였고, 두 분야의 국내외 연구 현황$\cdot$개념$\cdot$추진 방법$\cdot$상호 관계 등을 살펴보고, 상호 유기적인 관계를 보완 할 수 있는 제도적 장치 도입 및 적용 방안에 대해 논하였다.

  • PDF

A Study on Establishing the Under Space Integrated Map for Safety Management of Harbor Structures (항만구조물 안전관리를 위한 지하공간통합지도 구축 방안 연구)

  • Park, Dong-Hyun;Jang, Yong-Gu
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2016.05a
    • /
    • pp.139-140
    • /
    • 2016
  • 최근 대도심지를 중심으로 빈번히 발생하고 있는 지반침하, 지반함몰, 도로붕괴 등의 지하안전사고로 인해 정부는 지하안전 대책 수립에 만전을 기하고 있다. 특히, 국토교통부는 지하공간통합지도 구축 기본계획을 수립하고 본사업에 박차를 가하여 지하공간 안전관리체계를 마련하고자 하고 있다. 그러나 국토교통부에서 구축계획하고 있는 지하공간통합지도는 서울, 부산, 대전 등 대도시를 중심으로하고 있어, 태풍, 집중호우 등에 의한 지반침하 및 함몰 등의 안전사고가 우려되는 항만구조물을 관리하기에는 어려운 실정이다. 이에 본 연구에서는 항만구조물의 안전관리를 위한 지하공간통합지도 구축 방안을 제시하였다.

  • PDF

Necessity of Improvements on Code of Practice at the Demolition Work considering Building Structure Type : Based on Demolition work of Permission and Registration (건축물의 구조유형을 고려한 해체공사 제도 개선 방안 필요성 - 해체공사의 허가 및 신고를 기준으로 -)

  • Shim, Yukyung;Jeong, Jaewook;Lee, Jaehyun;Jeong, Jaemin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.66-74
    • /
    • 2020
  • To prevent incident of demolition work the Building Management Act was implemented to manage demolition work. According to this law, buildings with the scale upper than 500㎡ of floor area are classified as permission to conduct the demolition work, however it may be hard to perform safety management at demolition work. In addition, the risk level of demolition work is varied with related to the structure type. So, the purpose of this study is to suggest the improvements of criteria on demolition work considering building structure types including small-scale structures such as masonry, wooden, and other structure. The research process was conducted by three steps. (I) Application of Building Management Act; (II) Analysis of demolition work by structure types; and (III) Subdivision of permission targets by building structure types. The result of this study, permission ratio was only 10% for total demolition work and 2.43% for masonry. Because the masonry, wooden, and other structure types are concentrated on a floor area of small-scale, the separate criteria of demolition work is need to prevent the accident and fatal incident. Through the results, the decision maker can be utilized (1) For the special building structure types, the criteria of enhanced safety management are applied by referring to the overseas law ; and (2) The demolition work can be considered by the criteria of separate permission in terms of structure types.

Study on Establishing Earthquake-resistance Reinforcement Measures for Earthquake Disasters in National Industrial Complexes (국가산업단지의 지진재난 내진보강대책 수립 연구)

  • Chang Young Song
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.4
    • /
    • pp.882-896
    • /
    • 2023
  • Pupose: The purpose is to prepare safety management and seismic reinforcement measures that can effectively improve the potential risks of earthquake-resistant design and the deficiencies of safety guidance and inspection of factory facilities in national industrial complexes. Method: In this study, problems and improvement measures were derived through investigation and analysis of overall earthquake disaster safety management, such as safety management status and management system in preparation for earthquake disasters in national industrial complexes. was implemented to suggest improvement plans based on facility types and structural characteristics. Result: In conclusion, the problems of safety management and seismic reinforcement in preparation for earthquake disasters in national industrial complexes were summarized and classified into four types (seismic performance evaluation and related system supplementation, authority of tenant companies and local governments, seismic reinforcement and safety management support measures, organizational structure capacity building) to derive improvement measures. Conclusion: Based on this, seismic reinforcement measures that companies in national industrial complexes should implement in preparation for earthquake disasters were prepared, and detailed plans for each measure were presented.

A Study on the Internalization of Business Continuity Management Capabilities of Disaster Management Manager of Generation Public Enterprise (발전공기업 재난관리담당자의 사업연속성관리 역량 내재화 방안연구)

  • Paek, Chun-moon;Cheong, Chong-soo
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.169-170
    • /
    • 2023
  • 본 논문에서는 발전공기업 재난관리담당자의 사업연속성관리 역량 내재화 방안을 연구하였다. 발전공기업은 2001년 전력산업구조개편특별법에 따라 한국전력공사에서 6개 회사로 분사되었다. 국가핵심기반시설인 발전공기업은 핵심업무 중단으로 인한 국민생활과 산업시설 기능 정지를 예방하기 위해 2014년 이후 사업연속성관리체계를 적용하고 있으며, ISO 22301 및 재해경감 우수기업 인증을 취득하였다. 그러나 사회적인 이슈와 국가정책 등으로 발전공기업의 강도 높은 재난관리가 요구되고 있어, 재난으로 인한 핵심업무 중단 발생의 예방, 대비, 대응 및 복구관리를 통한 사업연속성 확보를 위해 재난관리당당자의 역량 내재화가 필요하며, 내재화의 구체적인 추진방안은 사업연속성관리요소 업무반영, 사업연속성관리를 반영한 리더 육성 및 인사제도와 연계 등이다.

  • PDF

The Study on the Construction of Safety Management Systems on Underground Multiplex Facilites (지하 다중이용시설 안전관리 체계 구축 방안 연구)

  • Seo, Tae-Woong;Lee, Jeong-Eun;Jung, Myung-Kyun;Kim, Chang-Soo
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.165-168
    • /
    • 2008
  • Recently, the damage which is caused by human misfortune in the underground space have increased. However the regulation and law for the underground space safety is still poor. Therefore in this paper, we propose the scheme for the construction of safety management systems on underground multiplex facilities. We analyze the problem of the current law, and present the scheme for the underground shop fire fighting facility. It contains the tree structure to management the underground space according to the construction phase, the facility and immediacy equipment. This safety management system will rearrange the scattered underground space management system.

  • PDF