• Title/Summary/Keyword: 구조물 해체

Search Result 199, Processing Time 0.028 seconds

Case Study on the Explosive Demolition of DCRE Incheon Plant (디씨알이 인천공장 발파해체 시공사례)

  • Kim, Sang-Min;Park, Keun-Sun;Kim, Ho-Jun;Kim, Hee-Do;Kim, Gab-Soo;An, Kyung-Ro
    • Explosives and Blasting
    • /
    • v.37 no.1
    • /
    • pp.34-47
    • /
    • 2019
  • This case study is concerned with the project of the explosive demolition for the DCRE Incheon plant located in Hakik district in Incheon city. The building was severely aging due to the high temperature and sea winds of hundreds of degrees emitted by chimney-shaped steel structures inside the building. Due to this, the concrete of the column and the beam fell off and rusted rebar were exposed, and some of the slabs were severely damaged, making it difficult for workers to access the structure. Therefore, it is not possible to apply a mechanical demolition method in which heavy equipment enters the interior of the building, and an explosive demolition method was applied to allow the building to be demolished without dismantling the internal facilities of the building. The order of blasting proceeded in the order of (1) building ${\rightarrow}$ (2) chimney 2 ${\rightarrow}$ (3) chimney 1. A total of 406 electronic detonators (Unitronic 600) was used to sequentially initiate the explosives installed at appropriate in building and chimneys.

Recording and Replay Interface to manipulate 3D Structured Objects (3D 객체의 구조에 기반을 둔 기록 및 재생 인터페이스)

  • Koo, In-Young;Sin, Eun-Joo;Choy, Yoon-Chul;Lim, Soon-Bum
    • 한국HCI학회:학술대회논문집
    • /
    • 2009.02a
    • /
    • pp.737-740
    • /
    • 2009
  • 3D VR modeling data can be used for powerful expression in construction, because it gives help to navigate a construction in 3D space easily. But the current status of VR technique visualizes only an external shape of a construction. A construction has not only its external shape data but also its constructive information. The constructive information is very important and can be expressed as the process of construction and deconstruction. Thus we research on recording and replay interface to manipulate 3D structured objects for the process of construction and deconstruction.

  • PDF

Collapse Simulations of High-Rise RC Building Using ELS Software and Application of Explosive Demolition Methods to Transition Process Analysis from Local Damage to Progressive Collapse (ELS를 이용한 고층 RC 빌딩의 붕괴해석 및 발파해체해석 기법의 국부손상-연쇄붕괴 전이과정 해석에 응용)

  • Kim, Hyon-Soo;Park, Hoon;Kim, Seung-Kon;Lee, Yeon-Gyu;Cho, Sang-Ho
    • Explosives and Blasting
    • /
    • v.29 no.2
    • /
    • pp.1-12
    • /
    • 2011
  • Progressive collapse analyses of high-rise buildings subjected to abnormal loading such as fires, impacts, earthquakes, typhoon, bomb blasts etc. are intended. However it is difficult to perform collapse experiments of the real scale building to determine the capacity of the structure under an extreme loading events. In this study, collapse behavior of a 15 story RC structure building loaded by external explosion pressures were simulated using Extreme Loading Structures (ELS) software. The standoff distance between the RC building and explosives of 1500 kg was 1, 2, 5, 10, and 15 meters. The explosive demolition analysis techniques based on removal of partial support structures following blast scenario was adapted to investigate the transition process of progressive collapse-local damage.

A Framework of Decommissioning Cost Estimation for Nuclear Research Facilities (원자력연구시설 해체비용 산정 구조)

  • Jeong Kwan-Seong;Lee Dong-Gyu;Lee Kune-Woo;Oh Won-Zin;Jung Chong-Hun;Park Jin-Ho
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.4 no.2
    • /
    • pp.171-178
    • /
    • 2006
  • Decommissioning cost estimation is a very important technique in designing and planning of nuclear facilities' decommissioning. Decommissioning cost estimation should be made according to the phases of decommissioning activities and installed components of nuclear facilities. In this paper, the basic framework necessary for decommissioning cost estimation is completed so that it could be used as a technique for decommissioning costs estimation by specifying cost items and group components and unit cost factors on which work time is calculated. Also, factors to be considered for decommissioning cost estimation of major activities and tasks are reviewed. Afterwards, these techniques will be utilized as a basic technology to establish methodology of decommissioning cost estimation and evaluation.

  • PDF

Development of Remote Controlled Demolition Equipment and Its Demolition Method for High-Rise Buildings (고층건물을 위한 원격제어 해체전용 장비 및 공법 개발)

  • Park, Jong-Hyup;Hong, Dae-Hie;Seo, Young-Soo;Kim, Hyo-Jin;Hong, Seok-Hee
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.957-960
    • /
    • 2008
  • The purpose of this study is to explore a safe, advanced, and environment-friendly demolition equipments and their operation methods. As an initial achievement, the capacity of the existing equipments have been evaluated through technical discussions and demonstrations with some experts in the related industry. From these evaluations, it was concluded that a haptic based remote control with force feed-back mechanism and sensor fusion functions would be the most appropriate to the demolition equipments. Therefore, a novel haptic device that is adequately designed for the demolition equipments is proposed in this paper. Top-down demolition method is also proposed, which is very effective in the demolition of high-rise buildings.

  • PDF